_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,
VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 88-03 FOR THE MJNTH OF MRCH,1988 VYDPF 0411 Rev. I h
8804140477 000331 E
ll PDR ADOCK 05000271 R
OPERATING DATA REPU6T 4
DOCKET NO.
50-271 DATE 880410 COMPLETED BY G.A. Wallin TELEPHOPE (802) 257-7711 OPERATING STATUS
~' Notes:
1.
Unit Names Vermont Yankee 2.
Reporting Period:
March 3.
Licensed Thermal Power (MWt):
- 593 4.
N&Aplate Rating (Gross MWeh 540 5.
Design Electrical Rating (Net MWe):514(oc) 504(ec) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe):
N/A
~~
- 10. Reasons for restrictions, if any N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.0d 2184.00
- 12. Number of Hours Reactor was Critical 744.00 2184.00 107029.36
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 2184.00 104453.27
- 15. Unit Reserve Shutdown Hours 0.00 0.d5 0.00
- 16. Gross Thermal Energy Generated (MWH) 1163019.50 3439001.00 153179712.50
- 17. Gross Electrical Energy Generated (MWH) 393216.00 1163883.00 51003827.00
- 18. Net Electrical Energy Generated (MMi) 377284.06 1116806.00 48411893.00
- 19. Unit Service Factor 100.00 100.00 76.74
- 20. Unit Availability Factor 100.00 100.00 76.74
- 21. "nit Capacity Factor (using MDC Net) 100.62 101.46 70.57
- 22. Mit Capacity Factor (using DER Net) 98.66 99.49 69.20 23.
. orced Outage Rate 0.00 0.00 6.19
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
N/A
- 25. If shut down at end of report period, estimated date of startup> N/A
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY VYDPF 0411.01 INITIAL ELECTRICITY Rev. 1 COERCIAL OFERATI0ii 1
AVERAGE DAILY LNIT POWER LEVEL o
o DOCKET NO.
50-271 UNIT Vermont Yankee DATE 880410 CO H.ETED BY G.A. Wallin TELEPHONE (802) 257-7711 MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(HWe-Net) 1 518 17 517 2
520 18 517 3
518 19 355 4
518 20 429 5
518 21 507 6
510 22 517 7
517 23 517 8
517 24 517 9
SP/
25 517 10 518 26 517 11 484 27 514 12 515 28 517 13 517 29 517 14 516 30 516 15 516 31 511 16 516 I
l l
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
VYDPF 0411.02 Rev. 1
[
00CKET NO, 50-271 UNIT NAT Vermont Yankee
- UNIT SHUTDOWNS APO POWER REDUCTIONS DATE 880410 COPOLETED BY G. A. hallin
~
REPORT MONTH March TELEPH0tE (802) 257-7711
~
1 2
P 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence 4
Spectacle flange bolts loosened.
B8-02 880311 F
0.00 8
Power N/A CH XXXXXX All bolts torqued to Reduction specifIcatlon.
4 Control Rod and Turbine 88-02 880311 F
0.00 8
Power N/A RB CONROD Surveillance Testing.
Reduction 4
Control P,od Pattern Exchange, 88-03 880319 S
0.00 B,H*
Power N/A RB CONROD Surveillance Testing and Raduction Seteduled Maintenance.
J 2 Reason F Forced A-Equipment Failure (Explain) 3 Method.
4 Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Marrsal for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (8ER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5 Exhibit I - Same Source G-Operational Error (Explain) See Above Cause and Corrective Action section
- H-(Explain) - Control Rod Pattern Exchange VYDPF 0411.03 Rev. 1
e DOCKET NO.
50-271 UNIT Vermont Yankee DATE 880410 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 REPORT MONTH March
SUMMARY
OF OPERATING EXPERIENCES Hiahliahts Vermont Yankee operated at 98.1% of rated thermal power for the monti.
Gross electrical generation was 393,216 kWHe or 97.9% of design electrical capacity.
Operatino Summary The following is a chronological descr!ption of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant das operatirg at _99.9%
of rated thermal power.
880311 At 1415 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.384075e-4 months <br />, commenced a power reduction to 75% to inver.tigate leakage at the spectacle flange on the "B' high pressure heater line.
880311 At 1443 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.490615e-4 months <br />, isolated the "B" high pressure heater line for temporary repair work.
(See Unit Shutdowns and Power Reductions) 880311 At 1505 hours0.0174 days <br />0.418 hours <br />0.00249 weeks <br />5.726525e-4 months <br />, initiated control rod exercising.
(See Unit Shutdowns and power Reductions) 880311 At 1642 hours0.019 days <br />0.456 hours <br />0.00271 weeks <br />6.24781e-4 months <br />, completed control rod exercising.
880311 At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />, temporary repair work completed and the "B" high pressure heater line was returned to service.
880311 At 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br />, commenced t'trbine surveillance.
880311 At 1835 hours0.0212 days <br />0.51 hours <br />0.00303 weeks <br />6.982175e-4 months <br />, completed turbine surveillance and a return to full power was initiated.
880319 At 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />, initiated a power reduction to minimum recir-culation flow to perform scheduled maintenance and surveillance testing.
880319 At 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />, completed curveillance testing and initiated a rod pattern exchange.
(See Unit Shutdowns and Power Reductions) 880319 At 1237 hours0.0143 days <br />0.344 hours <br />0.00205 weeks <br />4.706785e-4 months <br />, completed the rod pattern exchange.
880319 At 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />, completed scheduied maintenance and a return to full power was initiated.
,,u',. 4 % of At the end of the reporting period the plant was operating at c
rated thermal power.
VYOPF 0411.04 Rev. 1
.7g.
- VERMONT YANKEE NUCLEAR POWER CORPORATION w
P. O. BOX 157 GOVERNOR IIUNT ROAD VElul0N, VERMONT 05354 April 10, 1988 VYV 88-064 U. S. Nuclear Regulatory Commission Director, Office of. Management Information and Program Control Washington, D. C.
20555 Dear Sir SubgttedherewithistheMonthlyStatisticalReportfortheVermontYankee Nuclear Power Station for the month of March, 1988.
Very truly yours, VERl10NT YANKEE NUCLEAR POWER CORP.
$dt 0** V Warren. Murphy
)
j Vice P sident ant /
Manage of Operations VYDPF 0411 Rev. 1 s\\
i