Informs Ceil That NRC Has Contracted W/Mountain West Res Inc to Undertake a Series of post-licensing Studies of Nuc Pwr Stations.Studies Will Analyze Socioecon Impacts Which Occurred During Constr & post-constr Periods of Each Plant
ML20148Q448
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/20/1978
From: Deyoung R
Office of Nuclear Reactor Regulation
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 7811300042
Download: ML20148Q448 (2)


Text

  • '"

3D

  1. o UNITEO ST ATES 8 )

e NUCLEAR HEGULATORY COMMISslON l l

gg -y wasmocTon. o. caosss

% ***** /

NOV 2 01978 Mr. B. Le2, Jr.

Commonwr al th Edison Company ,

P. O. Box 767 -

Chicago, Illinois

Dear Mr. Lee:

The U.S. Nuclear Regulatory Commission (NRC), Of fice of Nuclear Regulatory Research, has contracted with Mountain West Research Incorporated to undertake a series of post-licensing studies of nuclear power stations.

These studies will analyze the community and regional socioeconomic impacts which occurred during the construction and post-construction periods of each station. Zion Nuclear Plant Units 1 and 2 has been included in a sample of fourteen stations to be studied.  ?

This contract is designed to provide infomation and tools of analysis which will improve and facilitate the treatment of socioeconomic impacts in the NRC licensing of nuclear power plants. It is our belief that this study will place the type, magnitude, and significance of socioeconomic impacts from nuclear power plant siting into a more useful perspective.

It should, thereby, be useful to communities 1ocated near the proposed site for future nuclear power plants as well as the NRC in meeting its responsibilities with regard to the National Environmental Policy Act (NEPA).

These studies will involve infonnation gathering in the communities surrounding each si te. Only a limited amount of infonnation, primarily historical in nature, will be sought diNortly from the utilities.

Dr. James Chalmers of Mountain West Research will contact you within the next several weeks to arrange a briefing on the objectives and design of this study as well as the type of infonnation that will be ._ __

sought .from you.

It is hoped that you can be of some assistance

  • to 'the successful' per-formance of this study.

7 811 a 0 0 0 4 7_

r

Mr. B. Lee, Jr. . NOV 2 01970 If you have any questions concerning this study, please call B. J. Youngblood, Chief, Cost-Benefit Analysis Branch, Division of Site Safety and Environ-mental Analysi s, on,301-492-?W3.

Sincerely, I

/ f

-/ sc A l Richard C eYoung Di rec tor Division f Site Safety and Environnental Analysis Office of Nuclear Reactor Regulation l