June 19, 1997
Mr. D. R. Gipson
t
Senior Vice President
l
Nuclear Generation
Fermi 2 Nuclear Power Plant
The Detroit Edison Company
'
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
NRC MAINTENANCE INSPECTION REPORT 50-341/97005(DRS) AND
'
Dear Mr. Gipson:
On May 30,1997, the NRC completed an inspection at your Fermi 2 reactor facility. The
l
purpose of the inspection was to assess the conduct and control of your maintenance
activities and associated engineering support. The enclosed report presents the results of
that inspection.
In general, your maintenance work related to the emergency diesel generator 12 outage
was performed in a well-controlled and efficient manner.
Based on the results of this inspection, the NRC has determined that three violations of
NRC requirements occurred. The violations are cited in the enclosed Notice of Violation
(Notice) and the circumstances surrounding them are described in detailin the subject
inspection report. These violations demonstrate inadequate control of maintenance and
surveillance activities. In particular, your failure to test the diesel driven fire pump to
l
ensure flow and pressure requirements were met following a speed change and your
failure to evaluate surveillance data outside of the acceptable limits is of concern.
Additional examples of violations involving work performed outside the scope of the work
package to repair a spare fuse disconnect switch, and the installation of unqualified parts
on the emergency diesel generators, demonstrated weak centrol of maintenance activities.
We are also concerned that multiple levels of your organization failed to detect,these
problems.
You are required to respond to thic letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
\\
regulatory requirements.
I
i
9706260097 970619
h!l!!! !
i
POR
ADOCK 05000341
~'
- ',
!
O
,
-
-
- -
-
- - .
.
b
.
.
l
D. R. Gipson
2
June 19, 1997
l
In accordance with 10 CFR 2.790 of the NRC's " Rules )f Practice," a copy of this letter
l
and its enclosure (s), and your response will be placed in the NRC Public Dncument Room.
Sincerely,
l
/s/ J. M. Jacobson (for)
'l
l
John A. Grobe, Acting Director
Division of Reactor Safety
Docket No. 50-341
License No. NPF-43
l
<
Enclosures:
2. Inspection Report 50-341/97005(DRS)
cc w/encis:
N. Peterson, Supervisor of Compliance
P. A. Marquardt, Corporate Legal Department
James R. Padgett, Michigan Public
l
Service Commission
l
Michigan Department of Public Health
!
Monroe County, Emergency Management Division
i
Distribution:
l
Docketfile,w/ encl _,,o
Rlli PRR w/enci
Rlli Enf. Coordinator w/ encl
l
gPUBLIC IE-01;w/ encl 3/
SR.I, Fermi w/encI
TSS wienci
!
OC/LFDCB w/ encl
LPM, NRR w/ encl
CAA1 w/enci
DRP w/enct
A. B. Beach, Rlll w/enci
DRS w/enci
J. L Caldwell, Rlll w/enct
l
l
l
!
i
DOCUMENT NAME: G:\\DRS\\FER97005.DRS
-
To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enct
"E" = Copy w/ attach /enci
"N" =, No
OFFICE
Rlll:DRS
g
Rlll:DRS ,
lE
Rlil:DRP
, l f:
Rlll:R ,Ml
NAME
Miller /kjpyQ
Ring /)RfL
Jordan 9/Weg:.
JacpBuolyGr@e
j
'
DATE
06/n/97
06/J7/97
06//7/97
06/ R/9J V
OFFICIAL RECORD COPY
\\
l