-  ; g g u gc 5 $1 F 1
  • -. i Docket 50-29 k=

T  ;

Yankee Atomic Electric Co:npany R "

THIS D0CUMENT CONT

  • ATn:: ur. L. t. ninnieu L POOR QUAUTY PAGES Vice President ,

20 Turnpike Road J

[.

Ucstboro, thssachusetts 01581 #

2 Genticr.ca:

d

) This will acknowledge receipt of the letter from :1 8 Ur. Herbert A. Autio dated November 20, 1972, k reporting damage to a fuci element on October 30, j 1972. This matter vill be exe.ined during the g next inspection of your facility.  ;;y 3 y 4

Your cooperation with us is appreciated.

Very truly yours, cp A

y.

Et F. E. Kruesi, Director of f Regulatory Operations 4 pl bec w/ letter 11/20/72 Y A. Gia:busso, L Local PDR  ?

J. M. Hendrie, L PDR $

P. A. Morris, RO NSIC q D. J. Skovholt, L DTIE  ?

R. H. Engelken, R0 DR Reading File i H. D. Thornburg, R0 DR Central File f R. Schetel, L Incident File (H. Semmes) $

J. P. O'Reilly, RO:I $,

J. G. Davis, RO:II $

E.1 Grier, RO:IIT f J. W. Flora, RO:IV N, R. W. Smith, RO:V k.

C. F. Eason, AWCRR (2) yi J. G. Keppler, R0 2; z

,}A K

ty

.R,0,,,,,,,,,,, ,,30, , ,,, ,,,, , , , , , , , , ._ ,,

i om:c .f poniepek: := ,,,I , ....,R,g[g, ,

4p ;

sunmz > , .Gddic r.... -.---RHEn13e .e ;E - 'r-------- - - - - - - - - - - - - - - '

l om > 11 l.72 ,

,,1, /_2, 6 j,M ,, ., ...),k, , , , , , , , , , , , , ,,,,

rorm Art:.HB gRev,9 53) AECM 0240 *dsg3vr i972-466-964 l

._=W.ENT PmN7NG CFPct -

\- . J.

s o n u o lof

W -

I hgw

, ~T YANKEE bOMIC ELECTRIC COhANY -

l (&

\.,YA h EE \_

. ., +

ROWE, MASSACHUSETTS '01367

, Q.

November 20, 1972 i s

United States Atomic Energy Commission Kashington, D. C. 20545 ,

Attention: Directorate of Regulatory Operations i

Reference:

License No. DPR-3 (Docket No. 50-29) ,

Dear Sirs:

Relative to the reporting requirements specified in i 10 CFR 20 Part 20.403 (b) (4), Yankee Atomic Electric Company - Rowe J reported damage to a fuel assembly both verbally and in writing on -

October 31, 1972.

i l The following written report is submitted in accordance I with 10 CFR 20.405.

i l h" nile removing the upper core barrel on October 30, 1972 Zircaloy fuel assembly A-421 was picked up from core position D-9 lA and raised with the upper barrel. The fuel assembly was lifted to  ;

approximately 8 feet above the top of the core.  ;

l Folluing evaluation of the problem, a decision was made to attempt reinsertion of the assembly into its core position. kf;1 During this reinsertion the fuel assembly was dislodged from the upper i core support plate, falling a maximum of several inches.  ?

.:a Tne upper core barrel was removed by normal procedure follow- E ing verification that fuel tube rupture had not occurred. The A-421 ,

assembly was observed to be in a near vertical position, resting on j the core adjacent to its original position. The upper nozzle was lean- g ing against the lower core barrel. c-A manual handling procedure and tools were used to transfer 2

~ the assembly to the fuel chute carriage and then to the spent fuel pit, y A similar ma.ual handling procedure was used for transfer to a spent fuel pit rack position. 4 Subsequent examination confirmed damage to the upper nozzle f and the upper assembly wrapper sheet. This fuel assembly will not be s reused. %g i

The cause for the fuel assembly hang-up has not been deter- Q; mined. It is postulated, however, that a small foreign object may have L.M '

lodged between the upper nozzle and the core support plate locking the assembly in place. This object would also have dislodged when the y%

assembly released. Some foreign material was noted later in this general $

area during fuel unloadin Marks on the upper core support plate noted j

-Aln i

~

h_ 6ff/yo g d

- ~

a i

,, 4 h ' , . <'

L) & ,

Q in a.later inspection, appear to confirm this diagnosis.

., The possibility of upper fuel nozzle distortion during core gf-1 . operation was considered. The remaining'75 upper nozzles were gaged ?7 with no distortion being found. $,

l ,r.

I ' Based on the above inspections and contemplated procederal l 4 changes, Yankee Atomic - Rowe is confident that a fuel assembly hang-up o J.;. l will not occur during future upper barrel withdrawals. ;j el Yankee - Rowe also wishes to correct the 24 ho'ur report of October 31, 1972 to Region I describing this incident as Abnormal ~c Occurrence 72-20. It has been determined that this incident falls with- y in reporting requirements but is not defined as a plant abnormal 1  :.

occurrence. .

q r

Very truly yours, )

i Herbert A. Autio -l Plant Superintendent 2

  • I Wu n j @WM f f meg cc: J. O'Reilly j

( ..~!

l w"hT4 a '

1 i g&a.,

h 1

i9L

+

A  ?

1

j. i l

1 /

m P

a gg i

i%

m, h

a 6.h ~ , ,, , . . , . . - . . . . , - . . . , . . ..; ,

~." .j

?f ~ ..f f

't'"

. j j$ b.n, .

A.

. - 'N' <

~

+t *I '