ML20148H830
ML20148H830 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 10/31/1978 |
From: | Cutchin J NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
To: | Burt L, Dignan T, Sheldon K MASSACHUSETTS, COMMONWEALTH OF, ROPES & GRAY, SHELDON, HARMON & WEISS |
References | |
NUDOCS 7811150018 | |
Download: ML20148H830 (1) | |
Similar Documents at Seabrook | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999
[Table view]Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08 Category:NRC TO LEGAL/LAW FIRM MONTHYEARML20059G9871990-09-10010 September 1990
[Table view]Advises That Commissioner Rogers Will Visit Plant Site on 900925.NRC Should Be Informed of Participation by 900919 ML20204G6301988-10-0404 October 1988 Forwards NRC Response to Motion of EA Thomas for Leave to File Response to Certain Proposed Findings of Fact & Conclusions of Law Served on 880928.W/o Encl.Related Correspondence ML20153G9211988-08-11011 August 1988 Final Response to FOIA Request for Records Re Shoreham Offsite Emergency Plan.App G Documents Available in Pdr.App H Documents Withheld (Ref FOIA Exemption 5).No Further Action Being Taken on Appeal Ltr ML20151N1981988-07-0707 July 1988 Partial Response to FOIA Request for Documents.Forwards App C Documents & Documents Available in PDR IR 05000444/19860521988-04-21021 April 1988 Refers to D Richardson Re Accuracy of Specific Control Bldg Air Sys Drawings in Possession & Determined That No Conflict Exists Between NRC Discussion of Allegation 51 of Insp Rept 50-444/86-52 & Info Provided by Recipient ML20151P2211988-04-18018 April 1988 Requests Table of Contentions Submitted by Town of Amesbury in Response to Seabrook Plan for Ma Communities & Short Description of Each Contention ML20151P1941988-04-18018 April 1988 Requests Table of Contents for Contentions Submitted by Town of Newbury in Response to Seabrook Plan for Ma Communities & Short Description of Each Contention ML20151P1771988-04-18018 April 1988 Requests Table of Contents for Contentions Submitted by Seacoast Anti-Pollution League in Response to Seabrook Plan for Ma Communities & Short Description of Each Contention ML20196H4141988-03-0707 March 1988 Advises That Ws Lord Approved as Authorized Person for Receipt of Protected Info in Accordance W/Terms of 880217 Protective Order.Jl Ross,Sa Bowles & Jl Soule Authorized to Have Served Affidavits of Nondisclosure.Served on 880308 ML20196J0351988-03-0404 March 1988 Forwards NRC Partial Response to New England Coalition on Nuclear Pollution Second Set of Interrogatories 5-9.Response Complete.Related Correspondence ML20196J0731988-03-0202 March 1988 Forwards NRC Partial Response to New England Coalition on Nuclear Pollution Interrogatories 1-4 & 10-30.Responses to Interrogatories 5-9 Will Be Filed Under Separate Cover on 880304.Related Correspondence ML20149M4261988-02-18018 February 1988 Discusses 871229 Meeting W/Employee Legal Project Re Comments in Encl 1 & Answer Addl Questions Resulting from Review of Insp Repts 50-443/86-52 & 50-443/87-07.Addl Documents Encl,Including Meeting Transcript ML20196D3431988-02-10010 February 1988 Forwards NRC Partial Response to New England Coalition on Nuclear Pollution (Necnp) Second Set of Interrogatories Re Necnp Contentions I,V & Iv.Nrc Response to Interrogatories 2-30 Will Be Provided by 880302.Related Correspondence ML20196B3921988-02-0505 February 1988 Responds to FOIA Request for Documents,Including Fj Congel 871202 Memo to RW Krimm Re FEMA Support for NRC Licensing of Plant.Forwards App D Document.Document Also Available in PDR ML20196B0541988-02-0202 February 1988 Ack Receipt of New England Coalition on Nuclear Power Second Set of Interrogatories & Request for Production of Documents on Contentions I.V & Iv.Nrc Will Respond to Interrogatories within 30 Days.Related Correspondence ML20234F5791988-01-0707 January 1988 Responds to FOIA Requests for Documents Re Recent NRC Rule Amending 10CFR50.47 & 10CFR50,App E.Forwards Documents Listed in App B.App a Documents Already Available in PDR ML20149M5041987-12-22022 December 1987 Confirms 871229 Meeting in King of Prussia,Pa to Discuss Bases for Disposition or Addl Review of Specific Concerns Re Issues Addressed in Insp Repts 50-443/86-52 & 50-443/87-07 ML20236V7231987-11-27027 November 1987 Responds to 871105 Request for NRC to Update Responses to New England Coalition on Nuclear Pollution Prior Discovery Requests Re Beach Shelter Issues.Nrc Undecided on Extent of Disagreement W/Fema.Related Correspondence ML20235A8001987-11-24024 November 1987 Responds to Portion of Transcript of Seabrook Hearing Re Bus Driver Training.Atty cross-examination Suitable & NRC Position Consistent W/Responsibility to Ensure Development of Full & Complete Record.Served on 880111 ML20149M0521987-10-0909 October 1987 Understands That Response to Insp Rept 50-443/87-07 Will Be Received within 4-6 Wks,Per & 870917 Telcon W/T Elsasser.Nrc Review of Matter Will Be Documented in Routine Resident Insp Rept ML20235J2771987-09-30030 September 1987 Final Response to FOIA Request for Documents Evaluating or Discussing Risks to Beach Population within 10 Miles of Plant Due to Radiological Accident.App E Documents Withheld (Ref FOIA Exemption 5) ML20238B0921987-08-27027 August 1987 Partial Response to FOIA Request Re Emergency Planning for Plant.App D Documents Totally Withheld (Ref FOIA Exemption 5) IA-87-327, Partial Response to FOIA Request Re Emergency Planning for Plant.App D Documents Totally Withheld (Ref FOIA Exemption 5)1987-08-27027 August 1987 Partial Response to FOIA Request Re Emergency Planning for Plant.App D Documents Totally Withheld (Ref FOIA Exemption 5) ML20237G6071987-08-14014 August 1987 Forwards Insp Rept 50-443/87-07 on 870406-0508 as Followup to Insp Rept 50-443/86-52.T Elsasser Will Contact Recipient to Arrange Meeting During Sept 1987 at Region I Ofc to Address Further Results of Insp,Per .W/O Rept ML20237G0471987-08-12012 August 1987 Partial Response to FOIA Request Re Emergency Planning for Plants.App a Documents in Pdr.App B Documents Encl & Available in Pdr.App C Documents Withheld (Ref FOIA Exemption 5) ML20235T5281987-07-17017 July 1987 Final Response to FOIA Request for Documents Re Const & Operation of Facility & NRC Review of Facility Regulatory Exemptions & Safety Evaluations.Forwards App D Documents. App C & D Documents Available in PDR ML20235G6511987-07-0707 July 1987 Forwards Info & Figures from Facility & NRC Training Documents,Per 870706 Telcon Request for Sketches or Drawings of Core Barrel for Better Identification of Alleged Crack Described in Wf Kane ML20235N4201987-06-26026 June 1987 Forwards Drawings Available in Section 1.2 of Seabrook FSAR, Re Containment Layout & Structure,Per 870624 Request.W/O Encls IR 05000443/19860521987-05-27027 May 1987 Forwards Request for Addl Info Re Encl Allegation Documentation Provided at 870420 Meeting Concerning Author 870209 & 0402 Responses to Insp Rept 50-443/86-52.Prompt Transmittal of Allegations & Affidavits Requested ML20209B8091987-04-16016 April 1987 Responds to 870323 & 0402 Ltrs Based on Concerns Re Followup Insp to Insp Rept 50-443/86-52.Followup Insp to Be Conducted During 870406-10 & 20-24.Issues & Concerns Identified in Will Be Discussed During 870420 Meeting ML20206C4631987-04-0202 April 1987 Discusses NRC Understanding Resulting from 870319 Telcon Re Draft Response to Insp Rept 50-443/86-52,including Employee'S Legal Project Intent to Conduct Addl Insp & Amplify Original Issues ML20207R2091987-03-0505 March 1987 Forwards Chairman Zech to Congressman Markey in Response to Recipient Noting Need for Adequate Noticing of Meetings W/Applicant Re Facility ML20207R2531987-03-0505 March 1987 Imforms That Encl Chairman Zech to Congressman Markey Outlines NRC Plan for Improving Sys for Adequate Noticing of Meetings W/Licensee Re Plant,In Response to ML20212K6971987-03-0404 March 1987 Partial Response to FOIA Request for Documents Re Exemptions or Deviations from Operation or Const of Plant & NRC Review of Exemptions.App B Documents Available in PDR ML20212F8711987-03-0303 March 1987 Partial Response to FOIA Request for Documents.Forwards App a Documents.Documents Also Available in PDR ML20209H4241987-02-0202 February 1987 Ack Receipt of SG Kurtz Affidavit Re Applicant Petition in Offsite Emergency Planning Proceeding Concerning Reduction of Epz.Affidavit Considered Limited Appearance Written Statement,Per 10CFR2.715(a) ML20214V4151986-12-0303 December 1986 Final Response to FOIA Request.Forwards Document.Document Also Available in PDR ML20214N6201986-11-20020 November 1986 Response to FOIA Request.App E Documents Re NRC Insp Rept 50-443/84-07 Already on File in PDR ML20214C7111986-11-18018 November 1986 Requests Advisement of Whether or Not Applicant Decided to Continue & Complete Const of Seabrook Unit 2.Served on 861119 ML20213G1641986-11-10010 November 1986 Partial Response to FOIA Request.Documents Listed in Apps C & D Located in PDR IA-86-756, Partial Response to FOIA Request.Forwards App a Document. App a Document Will Be Placed in Pdr.App B Document Already Available in PDR1986-11-0404 November 1986 Partial Response to FOIA Request.Forwards App a Document. App a Document Will Be Placed in Pdr.App B Document Already Available in PDR ML20215N4061986-11-0404 November 1986 Partial Response to FOIA Request.Forwards App a Document. App a Document Will Be Placed in Pdr.App B Document Already Available in PDR ML20215L5041986-10-24024 October 1986 Partial Response to FOIA Request.App D Documents Re Emergency Planning & Risk Mgt Available in Pdr.App E Documents Re Emergency Planning,Sensitivity Study & Seismic Fragility Encl & Being Placed in PDR ML20211D9861986-10-14014 October 1986 Partial Response to FOIA Request.Records Subj to Request Available in PDR ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20215C1731986-09-26026 September 1986 Requests Assistance in Contacting Individuals Alleging Safety Violations Listed in Employee Legal Project to Governor Dukakis ML20214R1241986-09-24024 September 1986 Partial Response to FOIA Request Re Seabrook Emergency Planning Zone.Forwards App a Documents.Documents Also Available in PDR ML20214R6561986-09-19019 September 1986 Forwards Documents Identified in NRC 860917 Supplemental Response to Util Interrogatories & Request for Documents Re New England Coalition on Nuclear Pollution Contention I.B.2. W/O Encls.Related Correspondence ML20210B7851986-09-12012 September 1986 Forwards NRC Response to Sapl Interrogatories 1,6,7,8,9,15 & 21 Prepared by R Eckenrode ML20209H8221986-09-11011 September 1986 Confirms 860911 Agreement That Recipient Will Inspect & Review Documents Referred to in NRC Response to New England Coalition on Nuclear Pollution Interrogatories on Contention I.B.2 on 860917 in Bethesda,Md.Related Correspondence 1990-09-10 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M8771999-10-25025 October 1999
[Table view]Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As ML20203A2811999-01-28028 January 1999 Forwards Insp Rept 50-443/98-10 on 981115-1227.No Violations Noted.Operators Performed Well During Two Reactor start-ups & Response to Plant Trip on December 22.Radioactive Waste Mgt Program Properly Implemented ML20198Q7391998-12-21021 December 1998 Informs That Review of Licensee Response to GL 97-05, SG Tube Insp Techniques, Did Not Identify Any Concerns with SG Insp Techniques Employed at Seabrook That Would Indicate That Naesco Not in Compliance with Licensing Basis ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) ML20198D1341998-12-16016 December 1998 Forwrds Ltr from J Bean Transmitting Final Exercise Rept for 981020,MS-1,out of Sequence Drill for Elliot Hosp in Manchester,Nh.Assistance Being Requested to Offsite Officials to Address & Resolve Identified Arca Timely ML20198C1131998-12-11011 December 1998 Forwards Insp Rept 50-443/98-09 on 981004-1114 & Notice of Violation.Nrc Identified That Safety Equipment Removed from Service at Beginning of Forced Outage Without Appropriate Monitoring of Status of Equipment as Required ML20197K1931998-12-0909 December 1998 Forwards RAI Re Utilities Participation in WOG Response to GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Response Requested within 90 Days of Submittal Date 1999-09-30 |
Text
i
/#"'g UMTED STATES
- yp'f ey tJucLEAR REGULATORY COMMISSION G3 y @ ' . %q,43 WASWNGTON, D. C. 20555 ,h
{ g\ p$
QJii!!C
(% . ,,,f /
October 31, 1978 {9 cq'gg)t*' g
%!y a Thomas G. Dignan, Jr., Esq. Karin P. Sheldon, Esq.
Ropes & Gray Sheldon, Harmon & Roisman 225 Franklin Street 1025 15th Street, N.W.
Boston, Massachusetts 02110 5th Floor Washington, D.C. 20005 Laurie Burt, Esq.
Assistant Attorney General Robert A. Backus, Esq.
Conmonwealth of Massachusetts O'Neill, Backus, Spielman, Little Environmental Protection Division 116 Lowell Street One Ashburton Place Manchester, New Hampshire 03101 19th Floor Boston, Massachusetts 02108 In the Matter of Public Service Company of New Hampsh. ire, et al.
(Seabrook Station, Units 1 and 2)
Docket Nos. 50-443 and 50-444 l
Ladies and Gentlemen:
To allow sufficient time for study of and comment on the draft testimony provided by the NRC Staff on October 30, the Commonwealth of Massachusetts asked that the meeting scheduled by the Staff for November 6 be postponed.
Because no other party objected to its postponement, and after conferring with representatives of the parties, we have rescheduled the subject meeting for 10 a.m. on November 15, 1978 at the Staff's offices in the Phillips Building at 7920 Norfolk Avenue, Bethesda, Maryland (Room P-118).
Sincerely,
~
NA- y James M. Cutchin, IV Counsel for NRC Staff, cc: Alan S. Rosenthal, Esq. Dr. Kenneth A. McCollom Dr. John H. Buck Norman Ross, Esq.
Michael C. Fafrar, Esq. E. Tupper Kinder, Esq.
Ivan W. Smith, Esq. John A. Ri tsher, Esq.
Joseph F. Tubridy, Esq. Atomic Safety and Licensing Dr. Marvin M. Mann Board Panel Dr. Ernest O. Salo Atomic Safety and Licensing Docketing and Service Appeal Panel Section 78111soofg .
1 - - - _ - --