ML20148H384

From kanterella
Jump to navigation Jump to search
Notation Vote Response Sheet Approving W/Comments SECY-97-077, Draft Rgs,Std Review Plans & NUREG Document in Support of Risk Informed Regulation for Power Reactors
ML20148H384
Person / Time
Issue date: 05/16/1997
From: Mcgaffigan E
NRC COMMISSION (OCM)
To: Hoyle J
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20148H350 List:
References
SECY-97-077-C, SECY-97-77-C, NUDOCS 9706100135
Download: ML20148H384 (1)


Text

__ __ __ _ _ _ __ -- _ ._ . . _ - . . _ _~ _ _ . ..

I l NOTATION VOTE i

RESPONSE SHEET

! l l TO: John C. Hoyle, Secretary l

FROM: COMMISSIONER MCGAFFIGAN

SUBJECT:

SECY-97-077 -

DRAFT REGULATORY GUIDES, l STANDARD REVIEW PLANS AND NUREG DOCUMENT IN SUPPORT OF RISK INFORMED REGULATION FOR POWER REACTORS 3 Approved x (w/cmts) Disapproved Abstain Not Participating Request Discussion l COMMENTS:

I approve issuing the draft documents attached to SECY-97-077 (Federal Register Notice, regulatory guides, standard review sections, and the NUREG) for a 90-day public comment period.

I agree with the Chairman's comments, and look forward to revisiting the policy issues inherent in the draft documents in light of the expected substantial public l comments.

I W&

ffdjiAg.'URE l

l Release Vote / x/ 5/16/97 DATE l

l Withhold vote / /

! Entered on "AS" Yes X No .

[

9706100135 970605 PDR COMMS NRCC CORRESPONDENCE PDR

'4 7& f7 9 13[

/pm%9 'o, UNITED STATES

!\ ,. y j NUCLEAR REGULATORY COMMISSION E W ASHlN GT ON. D.C. 20555 s ,!

%, u< .t

          • June 5, 1997 OFFICE OF THE SECRETARY MEMORANDUM TO: L. Joseph Callan Execu ivp.Dir,pctor for Operations q~ -C Alu -

FROM: John . Hoyl , Secretary

/

SUBJECT:

ST F REQUIREMENTS - SECY-97-077 - DRAFT REGULATORY GUIDES, STANDARD REVIEW PLANS AND NUREG DOCUMENT IN SUPPORT OF RISK INFORMED REGULATION FOR POWER REACTORS The Commission has approved publication of the draft regulatory guides, standard review plans and NUREG document for a 90-day public comment period. 6/13/97)

(EDO) (SECY Suspense:

The staff should provide the Commission information on its plans for conducting public workshops. The public workshop (s) to be conducted during the public comment period should be of sufficient duration and depth to provide meaningful insights into the approaches described in the documents.

In addition, the staff should provide the Commission information on its plans for training the NRC staff 1) on the risk-informed regulatory approach (es) contained in the regulatory guidance and standard review plan docr.ments and 2) in overall PRA methods and techniques. Particular attention should be given to increasing basic user-level knowledge of PRA methods at the regional level.

! (EDO) (SECY Suspense: 9/30/97)

The staff should continue to evaluate the proposed decision criteria and the methods of ensuring conformance to the criteria.

The staff should also develop guidance on how to confirm the .

,! assumptions and analyses used to justify current licensing basis changes.

SECY NOTE: THIS SRM, SECY-97-077, AND THE COMMISSION VOTING RECORD CONTAINING THE VOTE SHEETS OF ALL COMMISSIONERS WILL BE MADE PUBLICLY AVAILABLE 5 WORKING DAYS FROM THE DATE OF THIS SRM.

L % */ - n i n j f, s /- #, . .- f

, .4 .

  • ~

In particular, the staff should explore the following areas to add clarity and consistency to the process.

1. The feasibility of assigning assurance levels for conformance to decision criteria. j
2. 'The use of point values for comparisons with decision criteria, without any explicit consideration of ,

uncertainty (i.e., how consideration of uncertainty  !

I should be explicitly considered in conjunction with using point values -- for example, use of probability l limits) l l

3. -The implications of small increases in core damage f requency (CDF) and large early release frequency (LERF) codified in.the guidance documents, as a function of the uncertainty associated with the PRA j results.
4. Codifying in the guidance documents the experience i gained from the pilots to provide additional guidance on the " increased management attention" process when  !'

proposed changes approach the guidelines. ,

5. Clarifying the distinction between risk-informed and '

risk-informed, performance-based regulatory approaches.

The staff should continue to pursue the long range goal of improving the overall quality and consistency of PRAs. performed by different licensees by promoting high quality standards.

The staff should continue its efforts.to complete, in a timely taanner , the pilot applications of risk-informed regulation, and to complete the draft regulatory guidance and standard review plan for inservice inspection.

cc: ' Chairman Jackson Commissioner' Rogers i Commissioner Dicus 1 Commissioner Dia:

Commissioner McGaffigan f OGC

! CIO i CFO

. OCA l 2

OIG f l' Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)

PDR DCS P