Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failure During Plant Transients Due to Improper Switch Settings
ML20148H108
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/21/1988
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Russell W
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20148H115 List:
References
IEB-85-003, IEB-85-3, NUDOCS 8801270129
Download: ML20148H108 (3)


Text

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 (215)841 4500 JOHN S. KEMPER CE NIO R VICE+PR ESIDENT = NUCl.E A R Mr. William T. Russell, Administrator Docket Nos.:

50-277 Region I 50-278 U. S. Nuclear Regulatory Ccmnission ATTN: Doctment Control Desk January 21, 1988 Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station Units 2 S 3 L

I.E.Bulletin 85-03, "Motor Operated Valve Ccmnon Mode Failure During Plant Transler,ts Due to Improper Switch Settings" 5

Reference:

J. S. Kemper (PECo) letter to T. E. Murley (USNRC),

dated Novst>er 3,1986

Dear Mr. Russell:

r The purpose of this letter on the subject 1.E.Bulletin 85-03 program at our Peach Bottom Station is two-fold.

First, submitted herewith is our report which partially satisfies the bullettn's reporting requirements and describes our Peach Bottcm IEB 85-03 Program and plans for future work.

Secondly, it discusses the schedule aspects of the progran with respect to our plans to restart Peach Bottcm Units 2 & 3.

The referenced letter provided our Initial response to the subject bulletin.

The attached report provides a conplete response to I.E.Bulletin 85-03 action items a), b) & d) and a partial response to action item c) as related to Unit 2 specific test results.

All general and unit specific program elements identified in the attached report, with the exception of the Unit 2 differential pressure testing, will be ccxmleted prior to the restart of each unit. The Unit 2 final I.E.Bulletin 85-03 response, containing the differential pressure testing results, will be submitted within three (3) nonths after testing conpletion folicwing Unit 2 restart. This is necessary since nest planned differential pressure testing requires the use of nuclear steam. Because the planned Unit 3 program does not incitxfe any differential pressure testing, its final response will be submitted before restart,

\\

8801270129 880121

\\

DR ADOCK 050 7

If you have any questions or require any additional Infonnation regarding our I. E.Bulletin 85-03 program, please do not hesitate to contact us.

Sincerely, d'$./Y~[

TSN/pd12148708 Enclosure Report Copy to:

T. P. Johnson, Resident Site Inspector USNRC, Docunent Control Desk Washington, DC 20555

.~ -. - - _ -

,.I m;.

L i

n 1

C050NWEALTH OF PEbNSYLVANIA I ss.

COUNTY OF PHILADELPHIA'

~ '

i

.J.' S. ' Kenper, being first duly sworn, deposes and says:

That helIs-Senior Vice President of' Philadelphia Electric -

-Conpany; that he has read the foregoing response to NRC I.E. Bulletin-

. 85-03 and knows the contents thereof; and that the ' statements and matters set forth therein are true and correct to the best of his-i knowledge, Information and belief.

~

4

-$?,bf$ h ----

'ntor Vice President Subscribed and sworn to Before me this 2 / _ofday of January, 1988

.L &

2* MA Notary Pubile idELANIE R. CAMPANELLX-Notary Pubuc, Philadehhia, Philadelphis Co.

My Commission Expires february 12.1990 TSN/aud/12318706

.n e.

y

,-w,,.,ve,,...wim.w-.-.-

,. ~,,.- -,

r y.<

.,i.<-

,