p i.;, _.. ;

MEE Log # TXX-88340

.=

File # 10063 Z

C 10010 clo nlELECTRIC March 24, 1988 Milliam G. Comaail Execuent Vece President V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 SUBJECT : COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 TRANSMITTAL OF PROJECT STATUS REPORT ERRATA Gentlemen:

Enclosed are fifteen (15) copies of the errata prepared for the following Project Status Reports (PSR):

Large Bore Piping and Pipe Supports Small Bore Piping and Pipe Supports Pler.se place the errata tab and enclosure at the end of the appropriate PSR.

+

The large and Small Bore Project Status Reports were previously transmitted via TXX-6845 and TXX-6846, both dated November 2, 1987.

The Atomic Safety and Licensing Board will be notified of this transmittal by a separate letter from our attorneys.

Very truly yours, L).G. W W. G. Counsil By:

D. R. Woodlan Docket Licensing Manager ILS/grr I

Enclosures c - Mr. R. D. Martin, Region IV 7

Resident inspectors, CPSES (3) pCj

.I I

1 I

eso3290287 880324 j

PDR ADOCK 05000445 DCD a

4 g

400 North Oltve Street LB81 Dallas. Texas 7201

Errata

,[]'

Small Bore Piping and Pipe Support PSR PSR Pace Item /Line No.

Correction 5-22 31 Delete "Piping Erection" 5-28 35 Change "23 audits" to "24 audits" 5-30 19-20 Change "have verified" to "verify" and "were" to "aro" and "identified a trend" to "have identified a trend" 5-29 1

Change "16" to "17"

()

5-30 34 FIGURE 5-1 Change "SPEC. 2323-MS200A (Ref. 41)" to "SPEC.

2323-MS200 (Ref. 41)"

TABLE 5-6 1

Change "Piping Erection" to "Field Fabrication and Erection of Piping and Pipe Supports" I

l i

l 9

g Errata

.(,)

Small Bore Piping and Pipe Support PSR PSR Pace Item /Line No.

Correction TABLE 5-6 9

Change "CPSES Quality Assurance Procedure QI-QAP-11.1-26, Piping and Equipment Installation Inspection (Reference 42)"

to "CPSES ASME Quality Procedure, AQP-11.2, Fabrication and Installation Inspection of Pipe and Equipment (Reference 60)"

TABLE 5-9 SWCL No. 1 Change "02/21/85" to "O2/21/86" O

Project No. 5 Change "CPO-746, 04/03/86" to "CPO-881, 04/16/86" SWCL No. 2 Change "CPI-3557, 08/12/86" to "CPO-1901, 07/18/86 and l

CPO-2002, 07/28/86" Project No. 13 Change "12/01/86-12/05/86" to "12/03/86-12/22/86" i

Project No. 14 Change "03/06/87" to "03/27/87" and under the Audit Response Transmittal column, change "EMD File 16.1.2(016)" to "CPI-8657, 05/08/87" O

. 1

I Errata O,.

Small Bore Piping and Pipe Support PSR PSP Pace Item /Line No.

Correction TABLE 5-9 Project No. 15 Change "03/27/87" to "03/31/87" Project No. 17 Change "08/14/87" to "08/04/87" Site No. 5 Change "06/22/87" to "06/20/87" New Add:

"Project No. 18, at CH, 08/17/37-08/28/87, g)

IOM-EA-1965/ CPI-8073, No y

Response Required 6-3 32 Change "Revision 0, November 21, 1986" to "Revision 1, October 23, 1987" 6-3 38 Change "Piping Erection" to C-9 C.5 "Field Fabrication and Erection of Piping and Pipe Supports"

. L J

W

,r

.-,----_,-,,,_,,e,------,_e._,,_c,,m,--..-...----,,w

- + -

~

Errata

.)

Small Bore Piping and Pipe Support PSR PSR Pace Item /Line No.

Correction E

6-3 42 Change "CPSES Quality Assurance Procedure QI-QAP-11.1-26, Piping and Equipment Installation Inspection, Revision 0" to "Deleted.

Superseded by Reference 60."

6-4 49 Change "August 30, 1987" to "August 28, 1987" 6-5 60 Change "Revision 0, July 10, 1987" to "Revision 1, August 31, O,

1987" 6-5 62 Change "Reactor Coolant Loop Piping and Support Design" to 1

"Reactor Coolant Loop Piping Stress Analysis and Support i

Design" i

6-5 73 Change "October 15, 1987" to "October 15, 1986" j

A4-5 4.4 Change "J.

B.

George" to "J.

W. Beck" O <

+

+,,,.. -,,

-,-.,,-.-,,..nm n,---.,--.


.,,,_,,n,-,n,,,,---.,,-,....,__,n,

/

Errata (ji}/

Small Bore Piping and Pipe Support PSR PSR Pace Item /Line No.

Correction AS-4 4.8 Change "Pipe Support Generic Stiffness Study" to "Pipe Support Stiffness Study" A11-2 4.4 Change "U-bolt Support Assembly Finite Element Analysis" to "U-bolt Piping Support Assembly Finite Element Analysis" A13-3 4.5 Change "July 6, 1987" to "May 12, 1987" O

A20-1 4.2 Change "February 14, 1983" to "February 15, 1983" A28-3 4.2 Change "Revision 4" to "Revision 1" A37-3 4.8 Change "Processing TU Electric Requests for Temporary Hangers" to "Processing Requests for Temporary Hangers" and "October 7, 1987" to "October 1, 1987" A39-5 4.2 Change "July 17, 1987" to "July 29, 1987" i

e O :

O.

Small Bore Piping and Pipe Support Errata PSR PSR Pace Item /Line No.

Correction B3-1 4.1 Change "Pipe Supports" tc "Pipe Support Installations" and "November 3, 1986" to "October 16, 1986" B5-2 4.1 Change "Snubber Rear Brackets" to "ASME Snubber Attachment Brackets" C-9 C.3 Change "Fabrication and Installation Inspection of Safety Component Supports" to fs "Fabrication and Installation

'/

Inspection of Safety Class

\\,,

Component Supports" and "January 8, 1987d to "January 12, 1987" i

C.7 Change "May 7, 1987" to "May 12, 1987" C-10 C.19 Change "(Draft), August 14, 1987" to "Rev.

O, October 1, 1987" t

l l

l l

l l 0 l

Errata O

Large Bore Piping and Pipe Support PSR PSR Pace Item /Line No.

Correction 5-21 41 Delete "Piping Erection" 5-30 16-17 Change "have verified" to "verify" and "were" to "are" and "identified a trend" to "have identified a trend" FIGURE 5-1 Change "SPEC. 2323-MS200A (Ref. 41)" to "SPEC.

2323-MS200 (Ref. 41)"

()

TABLE 5-7 1

Change "Piping Erection" to "Field Fabrication and Erection of Piping and Pipe Supports" 9

Change "CPSES Quality Assurance Procedure QI-QAP-11.1-26, Piping and Equipment Installation Inspection (Reference 42)"

to "CPSES ASME Quality Procedure, AQP-11.2, Fabrication and Installation Inspection of Pipe and Equipment (Reference 60)"

TABLE 5-10 SWCL No. 1 Change "02/21/85" to "02/21/86" Project No. 5 Change "CPO-746, 04/03/86" lO to "CPO-881, 04/16/86" i l

l l

~

Errata Large Bore Piping and Pipe Support s

PSR PSR Pace Item /Line No.

Correction TABLE 5-10 SWCL No. 2 Change "CPI-3557, 08/12/86" to "CPO-1901, 07/18/86 and CPO-2002, 07/28/86" Project Add, under the Audit No. 10 Response Transmittal column, "2CPO-1199, 10/09/86" Project Change "03/06/87" to No. 14 "03/27/87" and under the Audit Response Transmittal i

O column, change "EMD File 16.1.2 (016)" to "CPI-8657, 05/08/87" Project Change "03/27/87" to No. 15 "03/31/87" Project Add, under the Audit No. 16 Response Transmittal column, "2CPO-2579, 07/17/87" u

Site No. 5 Change "06/22/87" to "06/20/87" TABLE 5-11 TSWEC-7 Change "CPO-1900, 07/18/86" to "CPO-1922, 07/23/86" l

_2 t

i I

,-,,-- -. - _ --,..,- -. n - -,,,

,,-n,

.._..,_.,,,_,,n_

)

l Errata Large Bore Piping and Pipe Support PSR PSR Pace Item /Line No.

Correction TABLE 5-11 ATP-87-03 Change "06/05/87" to "06/23/87" r

ATP-87-09 Change "CPO-7415, 08/07/87" to "CPO-G750, 06/23/87" 1

ATP-87-14 Change "CPO-7056, 06/30/87" to "CPO-6750, 06/23/87" ATP-87-18 Change "CPO-7315, 07/24/87" to "CPO-7229, 07/17/87" i

ATP-87-28 Change "O7/01/87" to J

"06/29/87" and "07/10/87" to "07/14/87" l

6-3 32 Change "Revision 0, November 21, 1986" to "Revision 1, October 23, 1987" P

i 6-3 38 Change "Piping Erection" to C-9 C.5 "Field Fabrication and Erection of Piping and Pipe Supports" t

l0 f !

_,.---..,,--v-_______..

..._,-____...-,,....m._,__,.__,.,_.,..._.._,_,.

.,_,,,,..-,-c..... _ - -

ae Errata

(

)

Large Bore Piping and Pipe Support PSR PSR Pace Item /Line No.

Correction 6-3 42 Change "CPSES Quality Assurance Procedure QI-QAP-11.1-26, Piping and Equipment Installation Inspection, Revision 0" to "Deleted.

Superseded by Reference 60."

6-4 49 Change "August 30, 1987" to "August 28, 1987" 6-5 60 Change "Revision 0, July 10, 1987" to "Revision 1, August O

31, 1987" 6-5 62 Change "Reactor Coolant Loop Piping and Support Design" to "Reactor Coolant Loop 1

Piping Stress Analysis and l

Support Design" 6-5 73 Change "October 15, 1987" to "October 15, 1986" A4-5 4.4 Change "J.

B. George" to "J.

W.

Beck" AS-4 4.8 Change "Pipe Support Generic Stiffness Study" to "Pipe Support Stiffness Study" l

' O,

i l

[

(-~s Errata Large Bore Piping and Pipe Support g

PSR PSR Pace Item /Line,_H2A Correction A11-2 4.4 Change "U-bolt Support Assembly Finite Element Analysis" to "U-bolt Piping l

Support Assembly Finite Ele-ment Analysis" A13-3 4.5 Change "July 6, 1987" to "May 12, 1987" A20-1 4.2 Change "February 14, 1983" to "February 15, 1983" O

A28-3 4.2 Change "Revision 4" to "Revision 1" t

A37-3 4.8 Change "Processing TU Electric Requests for Temporary Hangers" to "Processing l

Requests for Temporary Hangers" and "October 7, j

1987" to "October 1, 1987" l

A39-5 4.2 Change "July 17, 1987" to "July 29, 1987" l

B3-1 4.1 Change "Pipe Supports" to "Pipe Support Installations" and "November 3, 1986" to "October 16, 1986"

' t 1

Errata O*

Large Bore Piping and Pipe Support PSR I

PSR Pace Item /Line No.

Correction B5-2 4.1 Change "Snubber Rear Brackets" to "ASME Snubber Attachment Brackets" C-9 C.3 Change "Fabrication and Installation Inspection of Safety Component Supports" to "Fabrication and Installation Inspection of Safety class Component Supports" and "January 8,

1987" to "January 12, 1987"

()

C-9 C.7 Change "May 7, 1987" to "May 12, 1987" C-10 C.19 Change "(Draft), August 14, 1987" to "Rev.

O, October 1, 1987" V -