p i.;, _.. ;
MEE Log # TXX-88340
.=
File # 10063 Z
C 10010 clo nlELECTRIC March 24, 1988 Milliam G. Comaail Execuent Vece President V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 SUBJECT : COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 TRANSMITTAL OF PROJECT STATUS REPORT ERRATA Gentlemen:
Enclosed are fifteen (15) copies of the errata prepared for the following Project Status Reports (PSR):
Large Bore Piping and Pipe Supports Small Bore Piping and Pipe Supports Pler.se place the errata tab and enclosure at the end of the appropriate PSR.
+
The large and Small Bore Project Status Reports were previously transmitted via TXX-6845 and TXX-6846, both dated November 2, 1987.
The Atomic Safety and Licensing Board will be notified of this transmittal by a separate letter from our attorneys.
Very truly yours, L).G. W W. G. Counsil By:
D. R. Woodlan Docket Licensing Manager ILS/grr I
Enclosures c - Mr. R. D. Martin, Region IV 7
Resident inspectors, CPSES (3) pCj
.I I
1 I
eso3290287 880324 j
4 g
400 North Oltve Street LB81 Dallas. Texas 7201
Errata
,[]'
Small Bore Piping and Pipe Support PSR PSR Pace Item /Line No.
Correction 5-22 31 Delete "Piping Erection" 5-28 35 Change "23 audits" to "24 audits" 5-30 19-20 Change "have verified" to "verify" and "were" to "aro" and "identified a trend" to "have identified a trend" 5-29 1
Change "16" to "17"
()
5-30 34 FIGURE 5-1 Change "SPEC. 2323-MS200A (Ref. 41)" to "SPEC.
2323-MS200 (Ref. 41)"
TABLE 5-6 1
Change "Piping Erection" to "Field Fabrication and Erection of Piping and Pipe Supports" I
l i
l 9
g Errata
.(,)
Small Bore Piping and Pipe Support PSR PSR Pace Item /Line No.
Correction TABLE 5-6 9
Change "CPSES Quality Assurance Procedure QI-QAP-11.1-26, Piping and Equipment Installation Inspection (Reference 42)"
to "CPSES ASME Quality Procedure, AQP-11.2, Fabrication and Installation Inspection of Pipe and Equipment (Reference 60)"
TABLE 5-9 SWCL No. 1 Change "02/21/85" to "O2/21/86" O
Project No. 5 Change "CPO-746, 04/03/86" to "CPO-881, 04/16/86" SWCL No. 2 Change "CPI-3557, 08/12/86" to "CPO-1901, 07/18/86 and l
CPO-2002, 07/28/86" Project No. 13 Change "12/01/86-12/05/86" to "12/03/86-12/22/86" i
Project No. 14 Change "03/06/87" to "03/27/87" and under the Audit Response Transmittal column, change "EMD File 16.1.2(016)" to "CPI-8657, 05/08/87" O
. 1
I Errata O,.
Small Bore Piping and Pipe Support PSR PSP Pace Item /Line No.
Correction TABLE 5-9 Project No. 15 Change "03/27/87" to "03/31/87" Project No. 17 Change "08/14/87" to "08/04/87" Site No. 5 Change "06/22/87" to "06/20/87" New Add:
"Project No. 18, at CH, 08/17/37-08/28/87, g)
IOM-EA-1965/ CPI-8073, No y
Response Required 6-3 32 Change "Revision 0, November 21, 1986" to "Revision 1, October 23, 1987" 6-3 38 Change "Piping Erection" to C-9 C.5 "Field Fabrication and Erection of Piping and Pipe Supports"
. L J
W
,r
.-,----_,-,,,_,,e,------,_e._,,_c,,m,--..-...----,,w
- + -
~
Errata
.)
Small Bore Piping and Pipe Support PSR PSR Pace Item /Line No.
Correction E
6-3 42 Change "CPSES Quality Assurance Procedure QI-QAP-11.1-26, Piping and Equipment Installation Inspection, Revision 0" to "Deleted.
Superseded by Reference 60."
6-4 49 Change "August 30, 1987" to "August 28, 1987" 6-5 60 Change "Revision 0, July 10, 1987" to "Revision 1, August 31, O,
1987" 6-5 62 Change "Reactor Coolant Loop Piping and Support Design" to 1
"Reactor Coolant Loop Piping Stress Analysis and Support i
Design" i
6-5 73 Change "October 15, 1987" to "October 15, 1986" j
A4-5 4.4 Change "J.
B.
George" to "J.
W. Beck" O <
+
+,,,.. -,,
-,-.,,-.-,,..nm n,---.,--.
.,,,_,,n,-,n,,,,---.,,-,....,__,n,
/
Errata (ji}/
Small Bore Piping and Pipe Support PSR PSR Pace Item /Line No.
Correction AS-4 4.8 Change "Pipe Support Generic Stiffness Study" to "Pipe Support Stiffness Study" A11-2 4.4 Change "U-bolt Support Assembly Finite Element Analysis" to "U-bolt Piping Support Assembly Finite Element Analysis" A13-3 4.5 Change "July 6, 1987" to "May 12, 1987" O
A20-1 4.2 Change "February 14, 1983" to "February 15, 1983" A28-3 4.2 Change "Revision 4" to "Revision 1" A37-3 4.8 Change "Processing TU Electric Requests for Temporary Hangers" to "Processing Requests for Temporary Hangers" and "October 7, 1987" to "October 1, 1987" A39-5 4.2 Change "July 17, 1987" to "July 29, 1987" i
e O :
O.
Small Bore Piping and Pipe Support Errata PSR PSR Pace Item /Line No.
Correction B3-1 4.1 Change "Pipe Supports" tc "Pipe Support Installations" and "November 3, 1986" to "October 16, 1986" B5-2 4.1 Change "Snubber Rear Brackets" to "ASME Snubber Attachment Brackets" C-9 C.3 Change "Fabrication and Installation Inspection of Safety Component Supports" to fs "Fabrication and Installation
'/
Inspection of Safety Class
\\,,
Component Supports" and "January 8, 1987d to "January 12, 1987" i
C.7 Change "May 7, 1987" to "May 12, 1987" C-10 C.19 Change "(Draft), August 14, 1987" to "Rev.
O, October 1, 1987" t
l l
l l
l l 0 l
Errata O
Large Bore Piping and Pipe Support PSR PSR Pace Item /Line No.
Correction 5-21 41 Delete "Piping Erection" 5-30 16-17 Change "have verified" to "verify" and "were" to "are" and "identified a trend" to "have identified a trend" FIGURE 5-1 Change "SPEC. 2323-MS200A (Ref. 41)" to "SPEC.
2323-MS200 (Ref. 41)"
()
TABLE 5-7 1
Change "Piping Erection" to "Field Fabrication and Erection of Piping and Pipe Supports" 9
Change "CPSES Quality Assurance Procedure QI-QAP-11.1-26, Piping and Equipment Installation Inspection (Reference 42)"
to "CPSES ASME Quality Procedure, AQP-11.2, Fabrication and Installation Inspection of Pipe and Equipment (Reference 60)"
TABLE 5-10 SWCL No. 1 Change "02/21/85" to "02/21/86" Project No. 5 Change "CPO-746, 04/03/86" lO to "CPO-881, 04/16/86" i l
l l
~
Errata Large Bore Piping and Pipe Support s
PSR PSR Pace Item /Line No.
Correction TABLE 5-10 SWCL No. 2 Change "CPI-3557, 08/12/86" to "CPO-1901, 07/18/86 and CPO-2002, 07/28/86" Project Add, under the Audit No. 10 Response Transmittal column, "2CPO-1199, 10/09/86" Project Change "03/06/87" to No. 14 "03/27/87" and under the Audit Response Transmittal i
O column, change "EMD File 16.1.2 (016)" to "CPI-8657, 05/08/87" Project Change "03/27/87" to No. 15 "03/31/87" Project Add, under the Audit No. 16 Response Transmittal column, "2CPO-2579, 07/17/87" u
Site No. 5 Change "06/22/87" to "06/20/87" TABLE 5-11 TSWEC-7 Change "CPO-1900, 07/18/86" to "CPO-1922, 07/23/86" l
_2 t
i I
,-,,-- -. - _ --,..,- -. n - -,,,
,,-n,
.._..,_.,,,_,,n_
)
l Errata Large Bore Piping and Pipe Support PSR PSR Pace Item /Line No.
Correction TABLE 5-11 ATP-87-03 Change "06/05/87" to "06/23/87" r
ATP-87-09 Change "CPO-7415, 08/07/87" to "CPO-G750, 06/23/87" 1
ATP-87-14 Change "CPO-7056, 06/30/87" to "CPO-6750, 06/23/87" ATP-87-18 Change "CPO-7315, 07/24/87" to "CPO-7229, 07/17/87" i
ATP-87-28 Change "O7/01/87" to J
"06/29/87" and "07/10/87" to "07/14/87" l
6-3 32 Change "Revision 0, November 21, 1986" to "Revision 1, October 23, 1987" P
i 6-3 38 Change "Piping Erection" to C-9 C.5 "Field Fabrication and Erection of Piping and Pipe Supports" t
l0 f !
_,.---..,,--v-_______..
..._,-____...-,,....m._,__,.__,.,_.,..._.._,_,.
.,_,,,,..-,-c..... _ - -
ae Errata
(
)
Large Bore Piping and Pipe Support PSR PSR Pace Item /Line No.
Correction 6-3 42 Change "CPSES Quality Assurance Procedure QI-QAP-11.1-26, Piping and Equipment Installation Inspection, Revision 0" to "Deleted.
Superseded by Reference 60."
6-4 49 Change "August 30, 1987" to "August 28, 1987" 6-5 60 Change "Revision 0, July 10, 1987" to "Revision 1, August O
31, 1987" 6-5 62 Change "Reactor Coolant Loop Piping and Support Design" to "Reactor Coolant Loop 1
Piping Stress Analysis and l
Support Design" 6-5 73 Change "October 15, 1987" to "October 15, 1986" A4-5 4.4 Change "J.
B. George" to "J.
W.
Beck" AS-4 4.8 Change "Pipe Support Generic Stiffness Study" to "Pipe Support Stiffness Study" l
' O,
i l
[
(-~s Errata Large Bore Piping and Pipe Support g
PSR PSR Pace Item /Line,_H2A Correction A11-2 4.4 Change "U-bolt Support Assembly Finite Element Analysis" to "U-bolt Piping l
Support Assembly Finite Ele-ment Analysis" A13-3 4.5 Change "July 6, 1987" to "May 12, 1987" A20-1 4.2 Change "February 14, 1983" to "February 15, 1983" O
A28-3 4.2 Change "Revision 4" to "Revision 1" t
A37-3 4.8 Change "Processing TU Electric Requests for Temporary Hangers" to "Processing l
Requests for Temporary Hangers" and "October 7, j
1987" to "October 1, 1987" l
A39-5 4.2 Change "July 17, 1987" to "July 29, 1987" l
B3-1 4.1 Change "Pipe Supports" to "Pipe Support Installations" and "November 3, 1986" to "October 16, 1986"
' t 1
Errata O*
Large Bore Piping and Pipe Support PSR I
PSR Pace Item /Line No.
Correction B5-2 4.1 Change "Snubber Rear Brackets" to "ASME Snubber Attachment Brackets" C-9 C.3 Change "Fabrication and Installation Inspection of Safety Component Supports" to "Fabrication and Installation Inspection of Safety class Component Supports" and "January 8,
1987" to "January 12, 1987"
()
C-9 C.7 Change "May 7, 1987" to "May 12, 1987" C-10 C.19 Change "(Draft), August 14, 1987" to "Rev.