- Docket No. 50-456 Docket No. 50-457 Comonwealth Edison Company
- ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
SUBJECT:
EQUIPMENT QUALIFICATION INSPECTION - BRAIDWOOD NUCLEAR STATION This letter confirms the dates of February 29 through March 4,1988, for the NRC Envirorenental Qualification (EQ) Inspection of electrical and instrumentation equipment, at the Braidwood Station, Units 1 and 2.
These dates were established during a January 19, 1938, telephone conversation between Mr. S. Hunsader of your staff and Mr. Anil Gautam of my staff. The inspection will be performed by a six member inspection teau with Mr. Anil Gautam of the Region III office as lead inspector.
The following areas will be inspected:
Implementation of corrective action comitments addressed in the final Braidwood EQ Safety Evaluation Report.
Compliance to EQ regulations of 10 CFR 50.49, including Program Procedures, Master Equipment List, Maintenance, Procurement, Upgrading of Replacement Equipment, Quality Assurance, and Employee Training.
Adequacy of equipment qudlification files, including responses to relevant NRC Information Notices and Bulletins.
Installation and maintenance of selected plant EQ equipment.
A management entrance meeting is scheduled for 2:00 p.m. on February 29, 1988, at the plant site. A plant walkdown inspection of selected EQ equipment is scheduled for March 2, 1988, and an NRC exit meeting is scheduled for 11:00 a.m. on March 4, 1988. To facilitate NRC preparation for this inspection your staff has been requested to submit the following EQ documents no later than February 12, 1988.
1.
Licensee's response to Generic Letter 84-24 (D. G. Eisenhut to licensee's and applicants dated December 27, 1984;
Subject:
Certification of Compliance to 10 CFR 50.49).
l 8801260533 800121 l
$DR ADOCK 050004S6 PDR h
1
I JAN 211988 Connonwealth Edison Company 2
2.
a)
Master List, version in effect at the time of the inspection.
b)
Licensee's current System Component Evaluation Worksheets (SCEW Sheets).
3.
Licensee's procedures applicable to EQ (EQ Program, procurement of qualified equipment, maintenance of qualified equipment, and modifications to plants that could affect qualified equipment).
4.
Final NRC EQ SER including Regulatory Guide 1.97 issued to the plant, and any appropriate licensee responses to the SER.
The licensee is requested to make a presentation at the entrance meeting to address:
a.
Organization Chart with EQ applicability.
b.
Overview of EQ Program, c.
Overview of EQ documentation file organization such as how files address meeting EQ criteria (10 CFR 50.49, DOR, NUREG 0588), instrument accuracy, and submergence, d.
Arrangements for plant walkdown (the NRC team leader will identify selected equipment samples at the entrance).
Your cooperation with us during this inspection will be appreciated.
In particular please arrange, as appropriate, to have all inspectors escorted as visitors to avoid delays due to formal radiation training. Should you have any questions regarding this inspection, please contact Mr. Ronald N. Gardner at (312) 790-5524 or Mr. Anil S. Gautam at (312) 790-5523.
Sincerely,
- d. 3' b pgj g y a.d Li H. J. Miller, Director Division of Reactor Safety See Attached Distribution RIII RIII RIII RIlig RIII RIII Mib u
/jk Ga ner f*
s H rison Ch sotimos 01/20/88 01/zo/88 012 o /88 01/b4/88 01/7)/88 01/q /88 I
Commonwealth Edison Company 3
JAN 211983 -
L Distribution:
T. J. Maiman, Vice President,
- PWR Operations D..Butterfield, Nuclear Licensing Manager M. Wallace, Manager of Projects D. Shamblin, Project Manager W. Vahle,' Construction Superintendent E. E. Fitzpatrick, Station Manager
_ P. L. Barnes, Regulatory DCD/DCB (RIDS)pervisor Assurance Su Licensing Fee Management Branch Resident Inspector, RIII Braidwood Resident Inspector, RIII Byron D. W. Cassel, Jr., Esq.
Richard Hubbard J. W. McCaffrey, Chief,'Public Utilities Division H. S. Taylor, Quality Assurance Division t
E. Chan, 0GC G. Berry, OGC S. Sands, LPM, NRR U. Potapovs. VPB, NRR The Honorable A. Dixon Callihan, AStB The Honorable Richard F. Cole, ASLB The Honorable Ivan W. Smith, ASLB The Honorable Gary J. Edles, ASLAP The Honorable Dr. W. Reed Johnson, ASLAP j