ML20148G473

From kanterella
Jump to navigation Jump to search
Forwards Initial Eval of 8 Complete SEP Topics & Response to Request for Clarification of SEP Documentation Procedures Made at 780531 Meeting.Requests Response Re Facts Used to Define Plants by NRC Staff.(See ANO 7811130337.)
ML20148G473
Person / Time
Site: Millstone 
Issue date: 08/17/1978
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Counsil W
NORTHEAST UTILITIES
References
NUDOCS 7811130088
Download: ML20148G473 (2)


Text

_

N'g9 -

U(4, UNITED STATES Pt NUCLEAR REGULATORY COMMISslON

[

k REGION V 4'

b d

SUITE 202, W ALNUT C HEEK PL AZ A s

~%E

,o' 1990 N. C ALIFORNI A BOULEV ARD 4**e*

W ALNUT C R EEK, C ALIFOR NI A 94596 November 24, 1978 l

Docket tios. 50-275 -

50-323 N

Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention:

Mr. Philip A. Crane, Jr.

Assistant General Counsel l

Gentlemen:

Enclosed is a supplement (IE Bulletin No.78-12A) to IE Bulletin No. 78-12 which requires action by you with regard to your power reactor 3

facility (ies) with an operating license or a construction permit.

(

Should you have any questions regarding this Bulletin or the actions t

required by you, please contact this office.

1 I

Sincerely,

.h G

R. H. Engelken Director

Enclosures:

1.

IE Bulletin 78-12A i

2.

List of IE Bulletins Issued in 1978 cc w/ enclosures:

P. Ramsay, PG&E R. P. Wischow, PG&E 1

J. D. Worthington, PG&E 1

7 8 3 3 p o n g,3p


----- -