ML20148G203
| ML20148G203 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 03/18/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20148G208 | List: |
| References | |
| NUDOCS 8803290064 | |
| Download: ML20148G203 (2) | |
See also: IR 05000482/1988001
Text
.
-
-
.
..
_
.
.
. .-
--.
,.
,.
-
,.
In Reply Refer To:
MAR 181988
Docket: STN 50-482/88-01
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
.
.
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
'
Gentlemen:
This refers to the inspection conducted by Mr. B. L. Bartlett of this office
during the period January 4 through February 14, 1988, of activities ..athorized
.
by.NRC Operating License NPF-42 for the Wolf. Creek Generating Station, and to
the discussion of our findings with Mr. G. D. Boyer and other members of your
staff at the conclusion of the inspection.
'reas examined during the inspection included onsite event followup, engineered
safety features system walkdown, operational safety verification, monthly
maintenance observation, monthly surveillance observation, Part 21 followup,
allegation followup, physical security verification, and radiological protection.
.
Within these areas, the inspection' consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspector.
The inspection findings are documented in
the enclosed inspection report.
i
During this inspection, it was found that certain of your activities were in
i
violation of NRC requirements.
Consequently, you are required to respond to
,
this violation, in writing, in accordance with the provisions of?Section 2.201
of the NRC's "Rules of Practice," Part 2, litle 10, Code of federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction'Act of 1980, PL 96-511.
~
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
1
Sincerely,'
Difshst Signed By
L. J. Callan, Director
Division of Reactor Projects
,
E los
s:
(see next page)
l
b
C:DRP/A
)
D:DEP6c7
BLB tl
t/tw
REF
ell
LJCallan
J / /88
J/
88
g /
88
j
8903290064 880318
l
hDR
APOCK 050004e2
g
t
i
_
_ _ _ . ,
,_ _ _ __. _
-._,_~.L.
-~. - - -
...
_,.__
.-
-
_
_
, . . . _ .
.
_
_ ._
.
~
.
'
..
,,
Wolf Creek Nuclear Operating
-2-
Corporation
Enclosures:
1.
Appendix A - Notice of Violation:
4
'
2.
Appendix B - NRC Inspection Repcrt
50-482/88-01
,
cc w/ enclosures:
Otto L. Maynard, Manager of Licensing
Wolf Creek Nuclear Operating Corporation
P.O. Box.411
Burlington, Kansas 66839
t
Gary Boyer, Plant Manager
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
.
Burlington, Kansas 66839
Mr. Robert D. Elliott, Chief Engineer
Kansas Corporation Commission
i
Fourth Floor, Docking State Office Bldg.
Topeka, Kansas 66612-1571
<
Kansas Radiation Control Program Director
l
bec to DMB (IE01)
l
bec distrib, by RIV:
- PS/A
Myron.Karman, ELD, MNBB (1)
- RRI
R. D. Martin, RA
- Section Chief, (PS/A)
- DRP
- RSPB-DRSS
B. DeFayette, RIII
- RIV File
Callaway RRI, RIII
,
'
- ProjectEngineer,ORP/A
- MIS System
- A. B. Beach
,
- RSTS Operator
- L.
Shea, RM/ALF
- TSS
.
,
'
M. Emerson
- w/766
,
4
-
,
-r
--
.!
,.-- .
,
, , .
.,
, - ~ _ . . ,
- - ,
,