Amend 25 to License DPR-3,changing Tech Specs Requirements Re Eccs,Reflecting Actual Accumulator Flow in ECCS Performance Analysis
ML20148G043
Person / Time
Site: Yankee Rowe
Issue date: 10/07/1976
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20148G041 List:
References
NUDOCS 8011070138
Download: ML20148G043 (4)


Text

e -

M . 'f ',;n u ny % ?m. I j, )'

("'i) UNITED STATES

(;

,a h  ;,[p,; ,, ,1 j NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

]j h

y '% . . . . . o' 1 . p

p. .

YANKEE ATOMIC ELECTRIC COMPANY n Q.

q; DOCKET NO. 50-29 l>

-YANKEE NUCLEAR POWER STATION (YANKEE-ROWE) I

., y AMENDMENT TO FACILITY OPERATING LICENSE f

t Amendment No. 25 '3 License No. DPR-3 y

1. The Nuclear Regulatory Comission (the Conraission) has found that: (l l}

A. k The application for amendment by Yankee Atomic Electric Company $

(the licensee) dated May ll,1976, and supplements dated May 11, 17, and 19, 1976 and June 16, 1976, complies with the standards h, E

and requirements of the Atomic Energy Act of 1954, as amended II (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; I B. The facility will operate in conformity with the application, f) the provisions of the Act, and the rules and regulations of k the Comission; t C.

There is reasonable assurance (1) that the activities authorized f by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will ae 4 conducted in compliance with the Comission's regulations; g D.

The issuance of this amendment will not be inimical to the comon @

'I defense and security or to the health and safety of the public; and d T

l E.

i The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements hL E!"

have been satisfied.

M

2. El Accordingly, the license is amended by changes to the Technical s Specifications as indicated in the attachment to this license $p amendment, "g.

l p

'i I

?a R$

i u 1 8 0 2 3 o 7.o j g p _ _ _ _ _ __ .-

g s

e q) c:L y,_,

i3

.2-

3. This license amendment is effective as of the date of its issuance. @

FOR THE NUCLEAR REGULATORY C0iGlISSION 3 .

4

  • / &

A. SchWencer, Chief (v3 Operating Reacturs Branch #1 ;g Division of Operating Reactors '

Attachment:

  • Xi Changes to the Technical /

{ Specifications i i

! Date of Issuance: October 7,1976 .

I t a il

  • g N ,

E g.

t E

.h LgQ.

$3 LW y

7 .-

at r.,

$O

. k. n L

k e

S

[' $

.N l$D IM a%

k-Q i[ 9 I

?

w.,wn e -+- . - wme. . -  %. - --

Q Ty

... g

(".-) su

. n W

IJ ,

w.

7 .

4' ATTACHMENT TO LICENSE AMENDMENT NO. 25 .

p FACILITY OPERATING LICENSE N0. DPR DOCKET NO. 50-29 y, Revise Aopendix A as follows:

Remove page 7a and insert revised page 7a, -S; A

=

i Il _

I

..... 4 7, l s

j[M[

sgr:

Yb

._ - p hl

.?if

./

-~

?r .h YW Tryy 3

,)$Eh j

.5 khk, ta .

If I

e. j q;' i

.A.

e

_ NN N

-,5

f-

9

.~

x u .

-7c- h y k .

An un:xplcinzd incrossa ef 45 eps in tha air b.

g particulate conitor reading shall require ._

! bringing the plant to a hot standby condition

].

to permit pri=ary system inspection.

a-h)

If both methods for deter =ining main coolant leakage become inoperative and an hourly schedule of local sampling of vapor container air cannot be maintained, the plant will

be brought to a hot standby condition. t I .
o. Other Plant Protection  !
,

l (1) The reactor shall be scrac=ed automatically, above 15 W electric, when the turbine is tripped for any reason. The  ;

turbine shall be protected by all usual protective trips including high thrust bearing te=perature, lov bearing oil 7 pressure, low condenser vacuum and overspeed.

} (2) The reactor shall be scra=med aute=atically, above 15 W  :

i-electric when the generator is tripped for any reason. The 3"

! generator shall be protected by all usual protective trips j including overcurrent, differential and loss of field.

! (3) Autocatic initiation of the safety injection system, pu ps and i valves, shall be set to operate at a main coolant pressure not less than 1700 psig or a contain=ent p ressure not greater than &

5 psig. h x:

(4) The Low Pressure Safety Injection Accumulator shall have a minicus usable water volu=e of 700 ft3 and shall be pressurized

~

to 337 psig t 10 psig. l Sk t (5) The Safety Injection System which includes the Charging Purps gf shall be maintained in readiness to inject borated water into si the ra ctor at all t1=es when the cain coolant pressure is @@

1000 psig or higher. Charging systen readiness recuires that (qp;_

two fixed speed pu=ps be available. Since the pumps are high f9-maintenance items, a fixed speed charging p==p =ay be out of service for eight hours before a pressure reduction to less h

than 1000 psig is required. $g-  ;

The following manually-controlled, electrically operated valves shall be in the position indicated during noral power operation. ,

?