ML20148F949

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Deviations & Violations Noted in Insp Repts 50-458/86-22 & 50-458/87-16
ML20148F949
Person / Time
Site: River Bend Entergy icon.png
Issue date: 01/20/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 8801260361
Download: ML20148F949 (2)


See also: IR 05000458/1986022

Text

v -

-

,

'

3 L g g ) .' ( .

~

In Reply Refer To: JM 20 W

Docket: 50-458/86-22

50-458/87-16--

Gulf States Utilities

ATTN: ' Mr. Jones C. Deddens

Senior Vice' President, (RBNG)-

. Nuclear Licensing

P.O. Box 220

St. Francisville, Louisiana .70775

Gentlemen:

Thank you for your letter of December 15, 1987, in response to our letter

and Notice of Deviation dated September 19,.1986 and letter and Notice of

Violation dated August 13,1987. -We have reviewed your reply and find it

responsive to the concerns raised in our Notice of Deviation and Notice of

Violation. We will review the implementation of your corrective actions during.

a future inspection to determine +. hat full compliance has been achieved and-

. will be maintained.

Sincerely.

Ori;;inal Signed By

L. I. Callan

L. J. Callan, Director

Division of Reactor Projects

cc:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

River Bend Oversight .

P.O. Box 2951

Beaumont Texas 77704

Louisiana State University,

Goverrment Documents Department

,

Louisiana Radiation Control Program Director

l

RIV:DRP/C[ C:DRP/C" D:D h

GLMadsen:gb EJHoller LJCallan ,

i/eg/88. / /rf/88 ({}/88 -

f

'

8801260361 880120 I

DR ADOCK O  %

4]B

i

- -

.. .

. . . ~ _ , . . . . .. ._ . _. _. .. _ . ._ . . . _ _

. 4

' "

ni - ,, ;

3: .

s

'.

.

DISTRIBUTION: .

. 1

c: lbec to DMB (IE01);

bec;distribi-by.RIV: .

^

  • DRP ' * Resident Inspector

R. D.:. Martin, RA *SectionChief(DRP/C)

  • Lisa Shea, RM/ALF * MIS System

RPSB-DRSS .

~

. *RSTS Operator-

'* Project' Enginser, DRP/C .*RIV File

  • W."Paulson, NRR Project Manager 1 *R. Hall

' '

'*DRS *TSS

'

.D.-Powers '

,

  • w/766'

'

.

e

k

L

-

.

i

I

.

!

1.

V

l

_ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ __ _ _ .__

_ _ _ _ _ . _ _ _ _ _ _ _ _ .

': -

GULF STATES U2'ILITIES COMPANY-

[T q. .

'

..

'

'-

Rt(f p 9t%D 5f Ah0N POS' O*8 ct 90* 220

i $Y 8 8 A%Q$.v.',t LOJS:AN A 70776 j

'

'

ARE A CODE 6N 636 6394 346 4451

EC 2 l pc7

December 15, 1987 ' g".

RBG- 27164

File Nos. G9.5, G15.4..

U. S. Nuclear Regulatory Commission

Document Control Desh

Washington, D. C 20555

Gentlemen:

River Bend Station - Unit 1

Docket No. 50-458

This letter provides supplemental information to Gulf States Utilities

.. Company's (GSU) responses to Notice of Deviation 8622-02,' dated

? September 19, 1986 and Notice of Violation 8716-01, dated September

-

15, 1987. The previous correspendence stated that the sample

collectfon system on the redwaste sludge tank would be installed,

tested and operated. The latter' correspondence stated that the sample

collection system had been installed and tested but that numerous

problems had been encountered in operating the waste sludge tank.

GSU has reviewed the vaste sludge tank system and has determined that

the operation of the system should be deferred. The system is

presently being bypassed and all solid waste is pumped directly to the

vendor's solidification unit where it is sampled and analyzed prior to

solidification. This operational configuration will be continued

until the waste sludge tank is actually needed (i.e. waste evaporators

put into service). The Safety Analysis Report has been revised to

reflect this alternate configuration.

Sincerely,

. f' M h

0. E. Booker

Manager, River Bend oversight

River Bend Nuclear Group

JEB/E JWC/ch .

cc: U. S. Nuclear Regulatory Comission

611 Ryan Plaza Drive, Suite 1000

Arlington, TX 76011

hTC Resident Inspector

P. O. Box 1051

St. Francisville, LA 70775

4'

9 gb M hD62 IP