ML20148F932

From kanterella
Jump to navigation Jump to search
Informs That Comments on Second Draft Tech Specs Scheduled to Be Submitted by 880630.Requests NRC Issue Proof & Review of Tech Spec by 881230.Tech Spec Review to Be Completed by 890601
ML20148F932
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/25/1988
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-88345, NUDOCS 8803280329
Download: ML20148F932 (1)


Text

_ _ -

E Log # TXX-88345 File # 10014 Ref f 10CFR50.36 1UELECTRIC w uu.un c. caiasu March 25, 198d Decidrw S Ae e tsudrer U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAX STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-445 TECHNICAL SPECIFICATION REVIEW SCHEDULE REF:

C. I. Griftes letter to W. G. Counsil dated March 2,1988.

Gentlemen:

The referenced letter provided CPSES with a copy of the second draft technical specifications for CPSES, Unit 1.

The referenced letter also requested that TV Electric re evaluate the schedule for technical specification development.

Accordingly, comments on the CPSES second draft technical specifications are scheduled to be submitted to the NRC by June 30, 1988. Also, it is requested that the NRC issue the "Proof and Review" copy of the technical specifications by December 30, 1988.

Completion of the technical specification review (issuance of Appendix A to the CPSES Operating License) is anticipated on June 1, 1989.

Very truly yours, t

W. G. Counsil By:

V.b J6Mn W. Beck Vice President, Nuclear Engineering RWH/gj l

c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

Ch g22;ggg;gggggpy qg A

400 North Olus Street iB &I Lull.u. Teaas 73201}