THIS. DOCUMENT CONTAINS P0OR QUALITY PAGES' B
Vepco L
November 3,1978 3
Mr. James P. O'Reilly, Director Serial No. 575A Office of Inspection & Enforcement PSE&C/LCK/adw U. S. Nuclear Regulatory Comission Region;II
~
Docket No.'50-339 l
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
i In accordance with 10CFR50.55(e), the NRC, Region II, was notified on October 6,1978 that the North Anna Unit 2 Axial Power Distribution Monitor-ing System (APDMS) provided by Westinghouse Electric Corporation contained a non-conservatism capable of causing a maximum error of 1.1% in' the cal-culation of the LOCA peaking factor shape limits.
Vepco and Westinghouse are currently working together to develop a mutual permanent solution to this problem. Since this work has not yet been completed, you should consider this an interim report. The APDMS equipment,is.not;yet operational and thus a short delay of a solution will have no consequences. A final report will be forthcoming subsequent to the completion of our work effort.
If you require any further information at this time, please contact us.
Very ruly stir ff b,&-
m C. Brown, Jr..
Vice P esident - Power Sta on Engipeering and Construction Mr. John G. Davis, Acting Director /
ec:
Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 5