ML20148F868

From kanterella
Jump to navigation Jump to search
Responds to Util 610804 Request for Authorization of Proposed Change 10 to License DPR-3.Temporarily Waives Tech Specs,App a Operating Restriction D.2.d.(6) & Authorizes Test Demonstration.Waiver Shall Expire Upon Test Completion
ML20148F868
Person / Time
Site: Yankee Rowe
Issue date: 09/12/1961
From: Lowenstein R
US ATOMIC ENERGY COMMISSION (AEC)
To: Coe R
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20148F870 List:
References
NUDOCS 8011060816
Download: ML20148F868 (1)


Text

.

. s .

~ "'

  • " ts q. UNITED STATES k

/ - ATOMIC ENERGY COMMISSION J I

[ -

%n e Change No. 10 SEP 1 4 281 DIAR:RFB Docket No. 50-29 I'i M.r! tmtf mt U . t. . ac.K Doc. Room R. Lownst41n Formal T.. L. Lirk Suppl.

Yankee Atomic Electric Company M. 3. 11108 LB reading hhl Stuart Street P. Yrnvelatead IAR reading Boston 16, Massachusetts T. !'. Conner RFBorlik E. E. i!all Attention: Mr. Roger J. Coe D. C. Clerk Vice President P. A. Fm Tis-2 ~

T. Trenw.1 Gentlemen: h.'Utecle This refers to your request dated August h,1961 for AEC authorization to .

make Proposed Change No.10 in your facility pursuant to paragraph 3.A. of License No. DPR-3, as amended. @

We have reviewed the proposed change and have found that a temporary waiver of operating restriction D.2-.d.(6) of the Technical Specifications attached as Appendix "A" to License No. DPR-3 in order to permit a test demonstration  ;

of the use of boric acid in the main coolant system in higher concentrations .i than previously permitted during operation of the reactor under License No.

DPR-3, under the conditions proposed and as modified hereunder, does not present significant hazards considerations not described or implicit in the' license applicat!.on as anended to June 23, 1961, and that there is reason-able assurance that the health and safety of the public will not be endangered  ?

'oy operation of the facility as proposed with the modification described here- i under. A copy of our related hazards analysis is enclosed.

In view of the foregoing, operating restriction D.2.d.(6) of the Technical Specifications attached as Appendix "A" to License No. DPR-3 is temporarily waived, and Yankee Atomic Electric Company is hereby authorized to conduct the test demonstration according to its request dated August h,1961, )

entitled Proposed Change No.10 subject to the following additional condition:

The term of the waiver is for the period of the test demonstration only and shall expire when the test' demonstration is completed, or six weeks after the start of the test demonstration, whichever occurs first; provided, however, "

that the test demonstration shall be discontinued if at any time the summation l of uncertainty in reactivity measurement plus any unexplainable reactidty change exceeds 0.8% delt.a k/k.

Sincerely yours,

. . _ THIS D0P,UMENT CONTAINS n n m m in. m g POOR QUAUTY PAGES

Enclosure:

DIAR DIR DIAR Director i ,a : Division of and Regulation l'

Hazards P Analk sis /dk , B3py , Director W '.;

4 000 &'4 P -.