Refers to 970507 Meeting Held at MNS to Discuss NRC Salp. List of Meeting Attendees & Meeting Handout Encl
ML20148F838
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 05/30/1997
From: Casto C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Barron H
DUKE POWER CO.
References
NUDOCS 9706050061
Download: ML20148F838 (12)


Text

._ . ._ _. _ _. . _ - . _ . _ _ _ _ . . _ _ _ . _ . _ . _ _ _ . . _ _._. _ __.

. , i

...3 8 May 30, 1997 4 .

i Duke Power Company i

!- ATTN: Mr. H. B. Barron  !

Vice President

.McGuire Site

.12700 Hagers Ferry Road .
Huntersville' NC 28078-8985 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE ,

MCGUIRE NUCLEAR STATION l

Dear Mr. Barron:

This refers to the May 7, 1997, meeting held onsite to discuss the NRC's Systematic Assessment of Licensee Performance for your McGuire facility. Our-

, report. 50-369.370/97-99, dated April 18. 1997, had been previously sent to

i. you. A list of attendees and a copy of our handout are enclosed.

r

! In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", Part 2.

Title 10,~ Code of Federal Regulations, a copy of this: letter and its enclosures will be placed'in the NRC Public Document Room.

l No reply to this letter is required; however ihould you have any questibns l concerning this letter, please contact us. j 1

f -Sincerely. I Original signed by: 'l Charles A. Casto. Chief l Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-369. 50-370 License Nos. NPF-9, NPF-17

Enclosures:

1. List of Attendees
2. SALP Presentation Handout cc w/encls: (See page 2) l l

l 9706050061 970530 DR ADOCK 050003 9 Lp M

- _ _ _ . _ __ _ . . _ . . _ . . - . ~ _ ___.-- __._ _ _ _ _ . _ _ . . . _ . _ _ . . _ _ . -

l l c ,

- i
DPC 2 I cc w/encls
!

cc w/encis-James Snyder Peter R. Harden. IV l F Regulatory. Compliance Account Sales Manager  ;

i . Duke Power Company Power Systems Field Sales '

4 12700 Hagers Ferry Road Westinghouse Electric Corporation '

Huntersville, NC 28078-8985 P. 0. Box 7288

- Charlotte, NC 28241 ,

t G. A. Copp l l . Licensing-- EC050 Dr. John M. Barry, Director  ;

i Duke Power Company Mecklenburg County Department i

! P.' O. Box 1006 of Environmental Protection l

! Charlotte. NC 28201-1006 700 Tryon Street

[ Charlotte, NC 28203

' Legal Department -(PB05E) Karen E. Long j Duke Power Company Assistant Attorney General i

422 South Church Street N. C. Department of Justice

. Charlotte. NC 28242-0001 P. O. Box 629' Raleigh. NC 27602 i Mr. Robert P. Gruber Executive Director Distribution w/encls: I

Public Staff - NCUC V. Nerses. NRR  ;

P. O. Box 29520 S. Rudisail. RII  !

Raleigh. NC 27626-0520 C. Casto, RII J PUBLIC s J.' Michael McGarry, III, Esq. NRC Resident Inspector

'Winston'and Strawn i 1400 L Street, NW

Washington, D. C. 20005 I

-Dayne H. Brown. Director Division'of Radiation Protection artment of Environment,  ;

N.Health C. Dep& Natural Resources P. O. Box 27687 Raleigh. NC 27611-7687 County Manager of Mecklenburg County 720 East Fourth Street Charlotte. NC 28202 OrFier pit.BRp SIGNATURE NAME 3Rudisail y DATE 05 1 % / 97 05 / / 97 05 / / 97 05 / / 97 05 / / 97 05 / / 97 COPY? ((5) NO YES NO YES NO YE$ NO YES NO YES NO Ut t ICI AL PICUKU COPY OUuJME.NT NAMt.. g

\

)

LIST OF ATTENDEES NUCLEAR REGULATORY COMMISSION L. Reyes Regional Administrator. Region II (RII)

J. Jaudon. Director. Division of Reactor Safety (DRS). RII S. Shaeffer. Senior Resident Inspector. McGuire. DRP. RII M. Sykes. Resident Inspector. McGuire. DRP. RII i M. Franovich. Resident Inspector McGuire. DRP RII H. Berkow. Director. Project Directorate 11-2. Nuclear Reactor Regulation 1 (NRR) j i

V. Nerses. Project Manager. Project Directorate T.I-2. NRR R. Trojanowski. State Liaison Officer RII R. Hannah. Public Affairs Officer. RII DUKE POWER COMPANY I W. Coley, President. Associated Enterpris'es Group M. Tuckman. Senior Vice President. Nuclear Generation H. Barron. Site Vice President. McGuire Nuclear Station (MNS)

E. Geddie. Plant Manager. McGuire Nuclear Station (MNS)

. B. Dolan. Safety Assurance Manager MNS R. Jones. Operation Superintendent. MNS  ;

D. Jamil. Maintenance Superintendent. MNS '

l P. Herran. Engineering Manager. MNS  :

M. Cash Regulatory Compliance Manager. MNS i

I t

i ENCLOSURE 1

~

UNITED STATES-y NUCLEAR REGULATORY COMMISSION .

.I Wa NEGQ 4p.

l 0 b 9A gy k bme A'.

b

.msw O

O-

>g%7is -

-D-s

s
gF*f 4

gj ,,  : _..

i os == ,n r h M,r. ..

) ,/6, 'dy TE@e

't'Ng 1

+***%

MCGUIRE NUCLEAR STATION

~SALP PERIOD 13:

l AUGUST 13,1995 - MARCH 8,1997 8

PRESENTATION: MAY 7,1997 l

ENCLOSURE 2 l

l 1 . . - - ..

t SALP PROCESS .

~

Resident

-* Inspector Program '

. Region Based inspections 'N

[ /

SA_3 REGIONAL Licensing >/ -* ADMINISTRATOR > SALP

\BOAU Spec.l ia / k,q '

initiatives Event Reviews Master inspection

i . -

CATEGORY 1 - Superior Licensee attention and involvement have been properly focused on safety and i resulted in a superior level of safety performance. Licensee programs and i procedures have provided effective controls. The licensee's self-assessment efforts have been effective in the identification of emergent issues. 1 i

Corrective actions are technically sound, comprehensive. and thorough.

Recurring problems are eliminated and resolution of issues is timely. Root cause analyses are thorough.

i CATEGORY 2 - Good i Licensee attention and involvement are normally well-focused and resulted in a good level of safety performance. Licensee programs and procedures normally provide the necessary control of activities. but deficiencies may exist. The licensee's self-assessments are normally good. although issues may escape identification. Corrective actions are usually effective, although some may not be complete. Root cause analyses are normally thorough.

CATEGORY 3 - Acceptable licensee attentio'n and involvement have resulted in an acceptable level of safety performance. However. licensee performance may exhibit one or more of the following characteristics. Licensee programs and procedures have not provided sufficient control of activities in important areas. The licensee's self-assessment efforts may not occur until after a potential problem becomes apparent. A clear understanding of the safety implications of significant issues may not have been demonstrated. Numerous minor issues combine to indicate that the licensee's corrective action is not thorough. Root cause analyses do not probe deep enough. resulting in the incomplete resolution of issues. Because the margin to unacceptable performance in important aspects is small increased NRC and licensee atMntion is required.

9

9 MCGUIRE NUCLEAR PLANT  !

SALP BOARD MEMBERS i i

l JOHNS P. JAUD0N Di rector '

Division of Reactor Safety i Region II 1 RICHARD V. CRLENJAK Deputy Director, Acting Division of Reactor Projects j Region II J HERBERT N. BERK 0W Di rector Project Directorate II-2 i Office of Nuclear l Reactor Regulation ,

BRUCE S. MALLET Di rector Division of Nuclear Material  ;

Safety  !

Region II

t n

i ' OPERATIONS Rated as SALP Category 1 I

STRENGTHS '

  • Operator Response and Oversight

! l

.

  • Self-Assessments i i

4

  • Training

[ i CHALLENGES

  • Configuration Control '
  • Communications

~

MAINTENANCE l 4

i i

Rated as SALP Category 2  !

k- STRENGTHS  !

2 i

e Management Involvement e Material Condition CHALLENGES e Personnel Errors & Procedural Inadequacies e- Transients Resulting from Material Problems

\

s ENGINEERING '

Rated as SALP Category 2 4

STRENGTHS e Support to Operations

]'J ,

4

e Backlog management

,

  • Self Assessments

.

  • License Submittals

, CHALLENGES

  • Equipment Reliability

!

  • Cold Weather Protection 4

e Root Cause Analyses and Followup

)
4.  ;

l 1

  • i PLANT SUITORT

~

Rated as SALP Category 1 STRENGTHS

  • Housekeeping i e Self Assessments l r
  • Chemistry Control .

l 4

  • Emergency Response  ;

CHALLENGES

  • Maintain Strong and Effective Management Involvement I

t

. 4 i

V CG J RE \ JC _ EA R 3 _A \  !

3 '

SA _. 9K \ G S V V A9Y l

l

.. FUNCTIONAL RATING RATING AREA THIS PERIOD LAST PERIOD i PLANT OPERATIONS 1 2 j MAINTENANCE 2 2 ENGINEERING 2 1 i

.s i PLANT SUPPORT 1 1 l

I

.