ML20148F818
| ML20148F818 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 01/22/1988 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20148F822 | List: |
| References | |
| NUDOCS 8801260335 | |
| Download: ML20148F818 (2) | |
See also: IR 05000456/1987045
Text
.
l
.
-
.
i
JAN 221988
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
-Senior Vice President
Post Office Box 767-
Chicago,-IL 60690
'This refers to the routine safety inspection conducted by Mr. S. A. Reynolds
of this office on December 10-22, 1987,'of activities at Braidwood Station,
Units 1 and 2 authorized by NRC Operating Licenses No.-NPF-72 and No. NPF-75
and to the discussion of our findings with Mr. E. E. Fitzpatrick and others
at the conclusion of the inspection. . The purpose of this inspection was to
determine if the Quality Assurance Program, in specific programmatic areas, had
been properly implemented.
The enclosed copy of our inspection-report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection; however, we are concerned'about the possible effects on Technical
Specification operability caused by the sizeable backlog of out of tolerance
measuring and test equipment evaluations.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC Public
Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
8801260335 880122
C.!%r.:1 Sicr. d by J. J. !!:rri m
ADOCK 05000456
G
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Reports
No. 50-456/87045(ORS) and
No. 50-457/87046(DRS)
See Attached Distribution
R I
III
RI
RII
R
olds /jk
s
J b onski
i
H
n
01/e//88
01/21/88
01/ d/88
01/p/88
01A%88
Y
f
&
6
\\
$ al
.
.
_.
_.
. _
.
.,
,
. .
.
Commonwealth Edison Company
2
JAN 2 21988-
!
Distribution
- cc w/ enclosure:
T..J. Maiman, Vice-President,
- '
PWR Operations-
.<
1
O. Butterfield, Nuclear-
s
Licensing Manager:-
M. Wallace, Manager of_ Projects
D. Shamblin,-Project Manager
W. Vahle, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P.'L. Barnes, Regulatory
Assurance Supervisor
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr. , Esq.
l
Richard Hubbard
1
J. W. McCaffrey, Chief, Public
Utilities Division
L
H. S. Taylor, Quality Assurance
'
Division
E. Chan, OGC
G. Berry, OGC
J. Stevens, NRR
3
The Honorable A. Dixon Callihan, ASLB
'
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
The Honorable Gary J. Edles, ASLAP
,
The Honorable Dr. W. Reed Johnson, ASLAP
t
The Honorable Christine N. Kohl, ASLAP
1
>
,-n-
-
,
---
--
,
,.-
. , , - -
---e