Responds to NRC 770216 Request for Addl Info Re Reactor Vessel Overpressurization Potential.Due to Complexity of Questions & Addl Analysis Requested,Addl Info Will Be Submitted by 770529
ML20148F755
Person / Time
Site: Yankee Rowe
Issue date: 03/31/1977
From: Groce R
YANKEE ATOMIC ELECTRIC CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20148F739 List:
References
WYR-77-33, NUDOCS 8011060721
Download: ML20148F755 (1)


Text

  • . gesd fpor,t Telephons 617 366-90ll V. m 710 390-0739 YANKEE ATOMIC ELECTRIC COMPANY WYR-77-33

= s, 20 Turnpike Road Westborough, Massachusetts 01581 Yg ss

%'5au, -

March 31, 1977.

/,' 4 e ,, ....

g

,U' ] v United States Nuclear Regulatory Commission APP.3 1977w 52 '

Washington, D.C. 20555 ~ e,[:;f.\f23 y r ra Ay

  • ggM Attention: Office of Nuclear Reactor Regulation

References:

(1) Linense No. DPR-3 (Docket No. 50-29). " - " ' '

(2) USNRC Letter to Yankee Atomic Electric Company, dated February 16, 1977.

(3) YAEC letter to NRC, dated December 1, 1976.

(4) Letter, D.E. Vandenburgh (YAEC) to R.U. Reid (NRC),

dated February 4, 1977.

Dear Sir:

Ycur letter, Reference (2), requested additional information of Yankee Rowe's evaluation, Reference (3), which considered the potential for a reactor vessel overpressurization event as a result of a single equipment f ailure or single operator error; and the design or-procedural modifications required to preclude such an occurrence. We now find we cannot provide the submittal 'ithin the time allotted.

The extreme number, complexity of questions, and request for additional analysis, to supplenent the information and analyses submitted in Reference (3), cannot be provided within the 45 days allotted. Each operating nuclear power plant for which Yankee-SSD has operational responsibility is scheduled for ref ueling outages, the '

first, connencing April 9, if77. As a result, core reload analyses take precedence over the additional analyses you have requested.

Regardless of our delayed response the schedule for implementation of ,

the design change, discussed in Reference (3), will remain unchangad.

He therefore intend to submit the additional information requested in your letter, Reference (2), on or before May 29, 1977.

We trust this meets with your approval.

Very truly yours, P

YANKEE ATOMIC ELECTRIC COMPANY R.H. Groce Licensing Engineer '

RHG/lan so noco 7% ypF .