Forwards 751208 Corrections to 750821 Updated Instructions in AEC Rept OOE-SS-001, Instructions for Preparation of Data Entry Sheets for LER File
ML20148F561
Person / Time
Site: Yankee Rowe
Issue date: 01/23/1976
From: Purple R
Office of Nuclear Reactor Regulation
To: Groce R
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 8011050720
Download: ML20148F561 (4)


Text

&. 1 s <

- S .

g l

.. . . .4 l

DISTRIBUTION Docket File NRC PDR JAN 23M Local PDR ORB #1 Reading Docket No. 50-29 T. Carter R. Purple ,

A. Burger S. Sheppard IOSE(3)

OELD i Yankee Atomic Electric Company ACRS(16)

ATIN: Mr. Robert H. Groce JRBuchanan  ;

Licensing Engineer .TBAbernathy )

-20 Turnpike Road  ;

Westboro, Massachusetts 01581 i

Gentlemen: l On October 2,1975, the Commission issued technical specifications that revised the reporting requirements for the Yankee-Rowe Atomic Power Station. . In the letter, we requested that you use the format of the Appendices to Regulatory Guide 1.16, Revision 4. Instructions for using the reporting formats were contained in AEC report 00E-SS-001, "Instruc-tions for Preparation of Data Entry Sheetr. for I.icensee Event Report (LER)

File", c::4 updated instructions dated August 21, 1975. The purpose of this letter is to replace the first page of the updated instructions dated August 21, 1975, with the enclosed sheet dated December 8, 1975.

A typographical error was corrected and the location of the correction is indicated by a mark in the margin of the December 8,1975 sheet.

We are sorry for any inconvenience this may have caused. -

Sincerely, baal signed by l It A.Purpio Robert A. Purple, Chief Operating Reactors Branch #1 l Division of Operating Reactors i

Enclosure:

Revised Page dtd. 12/8/75

, ccw/ enclosure: _ ,

See next page i

..THIS DOCUMENT CONTAINS POOR Ql;AUTY PAGES orries > DOR:0RB#1 /k

.g., h.- # 1 . . . _ . . , _ . . . . . . . . . . . . . . . . _ . . , . . . _ _ . _ .

auanau . ..

1., . , . . . . _ . . , . . . . . , . . . _ , . . . . . . _ . . . _ . . .

..... 1/22/76 1/aV76 . _ . _ , _ _.

  1. erin Mc418 (ites,9 m AECM 0240 W u. s. eovsamusNT PAIN?tMe OrrlCEA 1d74,546.$ 60 801105:0 7 2 O p _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ___ -

d' i ,

)

Yankee Atomic Elcetric Company January 23, 1976 cc w/ enclosures: "

Mr. Donald G. Allen, President .

Yankco Atomic Electric Company 20 Turnpike Road .

Westboro, Massachusetts 01581

  • Greenfield Public Library I' "

402 Main Street .

Grconfield, Massachusetts 01581 Henry };olbe, M.D.

Acting Commissioner of Public Health Massachusetts Department of Public !!calth

i e

S 4

S a

l v l I

1 w

l s- -

.9 December 8, 1975 Operating Nuclear Power Plant Licensees INSTRUCTIONS FOR PREPARATION OF DATA ENTRY SHEETS.FOR LICENSEE  !

CVENTREPORT(LER) FILE The Energy Reorganization Act 'of 1974 Section 208, defines.

" abnormal occurrence" as an unscheduled incident or event the

  • Comission determines is significant from the standpoint of l public health or safety. Accordingly the term " abnormal occurrence" is reserved for usage by NRC. This restricted  ;

definition and other requirements for Section 208 will require ,

changes in the subject instructions, but for the immediate future the existing instructions can be utilized, as modified by this letter. -

The original instructions were issued in October 1974 as 00E-SS-001. The enclosure, an update to the instructions, was  !

sent to the licensees after the November 1974 regional meetings i which included discussions on the instructions. The following changes are hereby made to be effective as of receipt.

1. The term " abnormal occurrence" is to be used only by NRC in its reports to the Congress and the public.

All reports from licensees should be termed " reportable occurrences".

Licensee Event Report is an acceptable generic term. Any reference _ to, or use of the terms abnormal occurrence or A0 should cease in licensee event reporting. l

. Item 5 -- on the LER form (Event type in 00E-SS-001) should  ;

, be interpreted as follows.

01 - is to be used when referring to events requiring prompt notification (Regulatory Guide 1.16, Rev. 4, C.2.a).

5 03 - is to be used when referring to events requiring 30 day '

notification (Regulatory Guide 1.16, Rev. 4, C.2.b).

2. All classificatie'n of report significance is to be done by NRC. f Categorization by the licensee as " Prompt Notification" and 3

" Thirty-Day" reports will suffice as an indication of potential significance.

Item 6 -- on the LER form (Category in 00E-SS-001) is not to be utilized. Correction nos. 5, 6, and 7 on the enclosure are to be deleted and are so marked. All of item 6 in 00E-SS-001, pages 11, 12, 13, 14, 15 and the top of page 16 should be deleted also. i l

  • Typographical error in original issue, revised December 8,1975. }

l i

... .. +

0perating Nuclear Power Plant Licensees

3. Special effort should be made to include the essential information required by Section 208, in case the event is identified by NRC as an abnormal occurrence. This means including:

(1) Date and place (2) Name and probable consequences (3)Causeorcauses,and (4) Any action taken to prevent recurrence

Enclosure:

Update " Instructions for Preparation of Data Entry Sheets for Licensee Event Report" Additions and Corrections Dated August 21, 1975 I