Discusses Possible Conflicts Between Proposed Tech Specs, Submitted Per 10CFR50.46, & Existing Tech Specs,Submitted Per App K.Facility Should Be Operated within Tech Specs Limits Per Interim Acceptance Criteria,Pending Resolution
ML20148F525
Person / Time
Site: Yankee Rowe
Issue date: 10/02/1974
From: Goller K
US ATOMIC ENERGY COMMISSION (AEC)
To: Andognini C
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 8011050687
Download: ML20148F525 (2)


Text

, . . -_ _ _ . _ , _ .-

l  :,, M. . g ,

t

. Docket.No. 50-29 ' _

' Yankee Atomic Electric' Company -

' ATTN: Mr. Carl Andognini, Assistant ' ~

to the Vice President 20 Turnpike Road Westboro, Massachusetts ' 01581- .

Gentlemen: .

'10 CFR 50.46(a)(2)(iv) requires that upon submission of your revised x=:7 ECCS evaluation, developed in accordance with Appendix K to Part 50, .

the facility shall continue or commence operation within the limits of both the proposed technical specifications submitted pursuant to Section 50.46 and all technical specifications or license conditions previously imposed by the Commission, including the requirements ,

of the ECCS Interim Policy Statement i f June 29, 1971. .

Our preliminary review of recent ECCS submittals indicates that there may be instances where the proposed technical specifications that have p.

a

-been submitted in accordance with Section 50.46 are not consistent with the evaluation that has been submitted in accordance with Appendix K, or are in' conflict with existing technical specifications for your facility. ..7 Further,'it appears that in some cases compliance with the limits of both specMications may he a physical impossibility . For example, in some facilities _ the proposed technical specifications require a greater amount t M L

of water in the accumulators than is permitted by your existing technical specifications. h g

=.j 3

E 1 Discrcpancies such as those discussed above must be corrected as soon as practicable. Accordingly, you should reexamine your ECCS submittals, including both the existing and proposed technical specifications related '

thereto, to assure that the facility can be operated within the limits of '

both sets of technical specifications; that your proposed technical speci-fications are consistent with 50.46 requirements, including your evalua- 9 l

tion showing compliance with Appendix K; and to identify any areas of l

conflict between the two sets of technical specifications. After this review, d l you should submit to the Director of Licensing, within thirty days of a

receipt of this letter, the results of your review and necessary docu-  ;

mentation to correct any discrepancies in your previous ECCS submittals

. and to remove any conflicts in technical specifications similar to those M ,

% Q c n el n h n v oi 1

l. _-----

.THIS- DOCUMENT:CONTAINS I LP00R QUAUTY P GES l

j l . $; . ;rl.

s i i

y- g, ,

OCT 2 1974 LnTcee Atnmic Electric Company .' ,

mur tusf W W har In the* interim 7 pending res"olutiofi of such techrilcal non~-compliance with the Commi'Esinii's regulatinns, your f ac'ility should be operafed wilhin the limits nf those technical specifications that have been shown t6 result in compliance witT2 the Inte~rfIn Acceptance Criteria arrd, in additinn, '*

within the limits of IIny gro;nsed technfcal sp'ecIfications submitted pursuant in 60. 46,'to the extent that those proposed technical specifications have been shown to be coniiistent with the Interim Acceptance Criteria and prnvide a greater margin of safety.

Sincerely, Original Signed by ' ,

Karl Goller Ka~rl R. Gn11er, Assistant Director for Operatirfg Reactors Directorate of Licensing W

cc: Mr. Donald G. Allen, Pre 5iident Yankee Atomic ~ Electric Company 20 Tur~np'ike Road

  • Westboro, Massachusetts 01581 DISTRIBUCION Doeket File AEC PDR Eest--POR OR-1 Reading JRBuchanan, ORh*L TBAbernathy, DTIE 5 ACRS (16) 7-l R0 (3)

OGC iWa ABurger SMSheppard

[

TJCarter ~ -e SVarga EGCase )

h. ,.

06 %('y# 6 omcc . h:.9.R,1,, ,, ,,, , , ., hip,R , Q,,,_h!0R ,,j(g ,,,,,,,,,,,,,,,,,, , , , , , , , , , , , , , , , , , , ,,,,,,,,,,,,,,

ABurger:dc RAPurple KRGoller ..............

. u -,- . . . . . . . . . . . . . . . . . . . .................

. . . . . . . . . . . . . . . . . ............ _ .... ...... .......... l an i. AH AGA . .... . . l% . .!I6.... 20 L4.!14.. ... . . .. . ........... . . . . . . . . . . .. . . . . . . . . . .. . . . . . . . ..

m,_........,,_,,.m...,~.......

-e......-- ,

i f

,