ML20148F219
| ML20148F219 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 11/30/1987 |
| From: | Obenchain C EG&G IDAHO, INC. |
| To: | Chen P Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20148F173 | List: |
| References | |
| CON-FIN-A-6808 OBEN-171-87, NUDOCS 8803280095 | |
| Download: ML20148F219 (1) | |
Text
e ATTACHMENT 2
- INEh, Idaho National Engnneering laboratory November 30, 1987 Mr. P. Y. Chen U.S. Nuclear Regulatory Commission Mechanical Engineering Branch Phillips Building 7920 Norfolk Ave.
Bethesda, MD 20814 CLARIFICATION OF TECHNICAL ISSUES RELATED TO THE 52P REVIEW 0F YANKEE R0WE PIPING AND SUPPORTS (A6808) - Oben-171-87 Ref: C. F. Obenchain ltr to to T. H. Cheng (NRC), Oben 97-J/, final beport from EG&G's SEP Review of Yankee (A6808), July 2,1987
Dear Mr. Chen:
At your request, clarifications related to the SEF review of Ynikee piping and supports reported in the reference have oeen provi bd to eesolve questions asked by the licensee for Yankee.
These are cm tcintC (n the enclosed report.
The enclosure fulfills the revised requirements of Project 5, of FfN A6808.
Very trul.y yonic.
t C. F. Obenchain, Manager Mechanical Systems Evaluations HJR:mm1
Enclosure:
As Stated cc:
J. O. Zane, EG&G Idaho (w/o Enc) 8803280095 880321 DR ADOCK 050 9
hEGcG,a m
P.O. Box 1825 Idaho Falls. ID 83415
-_,. _-