Discusses Util 771219 Proposed Inservice Insp Program & 780216 Request for Relief from Selected ASME Code Requirements.Relief Granted Per 10CFR50.55a(g)(6)(i) Pending Review Completion.Fr Notice Encl
ML20148E879
Person / Time
Site: Yankee Rowe
Issue date: 03/13/1978
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Groce R
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20148E884 List:
References
NUDOCS 8010310679
Download: ML20148E879 (3)


Text

l h2 Y

~%

a

.4

, p/

~

'iiiii-i-i>

.isi; Docket No. 50-29

. MARCH 13 B76 q.

Yankee Atomic Electric Company ATTN: Mr. Robert 11. Groce Licensing Engineer,-

20 Turnpike ~ Road-N:^

Westboro, Massachusetts 01581 ~

=;y Gentlemen:

i

~

g ty RE: YANKEENbCLEARPOWERSTATION(YARKEE-ROWE)

By letter dated December 19, 1977, you submitted a proposed inservice inspection and testing program description and by letter February 16, 1978.5 m.iii$

you made a request for relief from selected ASME Code requirements pursuant to 10 CFR 50.55a(g)P Although we have not completed our detailed..

i review of your submittal,' our preliminary review makes clear to us that 7. (

=

your proposed program to, implement those ASME code requirements that you' it..-

have found to be practical would increase the scope of inservice inspection and testing for your facility beyond that currently required by your ' !j.?....

We have concluded that this upgrading of you Technical Specifications.

inservice inspection and testing program will further enhance safety. (/:iJ a

Based on our preliminary review, we agree with your determination that J1 E

3 it is impractical within the limitations of design, geometry and materialsM a=s of construction of components, for you to meet certain of the specified i - (-

"H ASME Code requirements and that imposition of those requirements would i

5 result in hardships or unusual difficulties without a compensating increaseA a d in the level of quality or safety. Therefore, pursuant to 10 CFR 50.55a(g) '.

(6)(i), we hereby grant relief, on an interim basis, pending completion G Q of our detailed review, from those inservice inspection and testing

/

Is requirements of the ASME Code that you have requested. Moreover, since /..4,i,

'the scope of the inservice inspection and testing will be increased by '

1s s

your proposed program, and the granting of this relief is based only.on.

the impracticality of selected ASME Code requirements, we have determined, 'O that the relief granted neither increases the probability or consequences' of accidents previously considered nor decreases safety margins and that, therefore, it does not involve a significant hazards consideration.

Therefore, you are authorized to, and should proceed to, implement your proposed program (except where your current Technical Specifications are more restrictive) on March 1, 7978, which is the date that the require-ments of 10 CFR 50.55a(g) become effective for your facility.

f iTHlFD0004ERCopTAINST Em l

200JPQUAugy@ES1

.a i

=g

=::

k:=k=b....-...=0=]

.a...

TQ

)

LA q

.... -.w r

' 'Yanket

tric Company gg g tl id between the date that the requirements of 10 CFR 3 u.

During(g a effective for your facility and the date we complete 50.55a E

our detal.~.eview of your submittal 90u must comply with both your existing Technical Specifications and your proposed inservice inspection and testing program. In the event conflicting requirements arise for

..x x,

come components, you must comply with the more restrictive requirements 5%

(e.g., shorter inspection intervals, increased number of parameters

L.1....

iF=

measured).

In other words, the granting of this relief from ASME Code requirements should not be interpreted to give you relief from Ef"~

any of the requiranents in your existing Technical Specifications.

..=

When our detailed review of your December 19, 1977 submittal is complete we will:

(1) issue final approval of your program (which may contain n;...

modifications resulting from the staff's review). (2) grant relief

= = = -

from any ASME Code requirements that are determined to be impractical

==

for your facility for the duration of the inspection interval and (3) issue appropriate changes to your Technical Specifications.

1......

A copy of the Federa_1 Register Notice related to this action is 4

enclosed.

Sincerely.

Original Signed By i

Dennis L. Ziemann, Uranch #2

[h, Chief Operating Reactors p="

Division of Operating Reactors Dr

Enclosure:

Federal Register Notice

.nnM 13 cc w/ enclosure:

See next page DISTRIBUTION W

Docket 0 ELD ORB #1 Reading OI&E(3)

ORB #2 Reading DOR / Lead Eng.

NRC PDR DEisenhut Local PDR TBAbernathy l

DZiemann JRBuchanan.

ACRS(16)

ASchwencer RDiggs xtF oEt [-

EB/b@4 ORB # b STS C ORB #2

..0RM.1 omec

  • lx27433Lt3L*

..AB.urgar[U..AS..chwMr...d-

. DZiemann M CMM C. fd[

. 2/24/7 5

..2LhlIB

...k]>I78

]Ll3178 3l BITE Nbl9L 1

o~

\\

tac row m w.m acu om

%...om,m n m,m-ameu,en.

a l

62.

b..

y,:,

e. &:u-3-

March 13, 1978 g

,Yaqkee. Atomic Electric Company '

... ::= -

cc: Mr. Donald G. Allen, President

.:=s Yankee Atomic Electric Company -

20 Turnpike Road

-Ei" Westboro, Massachusetts 01581

.... =

Greenfield Comunity College

'?===m 1 College Drive p

Greenfield, Massachusetts 01301

=.: g

=

!==iE;

' ~..:..

fE

~

ii iis: 2

....:25 h=,d..,

. 5 ".'.$

g:== =h e

I...

=.....::-
  • ' kk'.;

4

.ij

.ii l

=r

=::

5.' '

.i!751 E.:

aw

'" 2 U

....E

...eu.e.'II f

.a