Final Deficiency Rept CP-87-129 Re Containment Spray Sys Ph. Initially Reported on 880106.Caused by Inadequate Chemical Additive Sys Design.Design Mod Will Be Implemented to Eliminate out-of-range Ph.Mod Will Be Completed by 881023
ML20148E725
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/19/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-129, TXX-88113, NUDOCS 8801260098
Download: ML20148E725 (2)


Text

.

MFE log # TXX-88113

-)

1 File # 10110 r

=

906.5

('

1UELECTRIC

$$0Sd%"$.

January 19, 1988 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION 00CKET N05. 50-445 AND 50-446 t0NTAINMENT SPRAY SYSTEM PH SDAR:

CP-87-129 (FINAL REPORT)

Gentlemen:

On January 6, 1988, we notified you via our report logged TXX-88031 of a reportable deficiency involving the containment spray pH.

The purpose of this report is to address the cause and implications of the deficiency as well as the corrective action, preventive action, and implementation schedule required to resolve the issue, pursuant to the provisions of 10CFR50.55(e).

The cause of this condition appears to have been the failure to properly design the Chemical Additive System to maintain the containment spray pH within the specified limits under all o)erating conditions and failure modes.

This deficiency, if uncorrected, could lave impacted qualified ecuipment inside the Containment Building.

The design criteria have been cocumented in the Containment Spray System Design Basis Document (DBD-ME-232) which was used as the basis for validating the design.

To correct this deficiency, a design modification will be implemented to eliminate out-of-range pH.

Specifically, the system design will be modified such that sodium hydroxide will be available to both containment spray trains under all modes of operation and chemical addition will terminate coincident with switchover of the Containment Spray Syttem to recirculation mode.

This will ensure that the Containment Spray pH remains within acceptable limits, h!bDO K S

L 1

TXX-88113 January 19, 1988 Page 2 of 2 The above corrective actions are scheduled for completion for Unit I by October 23, 1988.

Unit 2 corrective actions will be accomplished in accordance with the general construction schedule.

Very truly yours, 0

W. G. Counsil By: