ML20148E688

From kanterella
Jump to navigation Jump to search
Forwards Replacement TS Pp 3/4 5-2 Which Corrects Identified Discrepancy Re TS 4.5.1.b.Amend 215 Incorrectly Requires Verification of Sys Flow When Steam Is Being Supplied to Turbine at 1000,+20 & -18 Psig
Date released: 06/10/2020 Download: ML20148E688


Corrected TS Page 3/4 5-2 to Amend 215 of License DPR-62
ML20148E691
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/16/1997
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML20148E691 (1)
Forwards Replacement TS Pp 3/4 5-2 Which Corrects Identified Discrepancy Re TS 4.5.1.b.Amend 215 Incorrectly Requires Verification of Sys Flow When Steam Is Being Supplied to Turbine at 1000,+20 & -18 Psig
ML20148E682
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/16/1997
From: Jury K
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20148E682 (2)