ML20148E401

From kanterella
Jump to navigation Jump to search
Informs of Having Same Conference Line for Both Am & Pm Re Scheduled Conference Call on 941229
ML20148E401
Person / Time
Issue date: 12/29/1994
From: Matthews D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Verrelli D
NRC (Affiliation Not Assigned)
Shared Package
ML20148E385 List:
References
FOIA-96-485 NUDOCS 9706030087
Download: ML20148E401 (2)


Text

.

s I

e From:

David M.

Vgerelli (DMV)f fg To:

DBM, Alf/Z.. u A A 1H hee 42r Date:

Thursday, December 29, 1994 7:36 am

)

Subj ect s-Conference Call #

as I have the same conference line for both this am & im 1

10:00 Crystal Performance Review 1

h 2:00 StLucie Enforcement Panel

.J CC:

BXU, LJW2, LXR1, JAN2 9706030087 970530 i

PDR FOIA PDR l

BINDER 96-485 s ee -

i Information in in In accordance Wit t%' s deleted

9 Act, exemptions reedom ofInformation Folg.

(C&D]

o nt y

&6 h & ed YAfo f4 I

i LISTIC EVALUATION OF ST. LUCIE LER 94-006-01

! 'he event of interest is a Loss of Coolant Accident (LOCA) coincident ltithaLossof"3ffsitePower(LOOP)andfailureofoneEmergencyDiesel

, ten m tor to Start.

ine period of exposure is assumed to be one year.

l-roa the St. Lucie IPE the following initiating event frequencies and eliability data were obtained:

f(LOCA)= 1.42E-03/yr._(small-small LOCA frequency) a.

f(LOSP)= 1.50E-01/yr (loss of grid frequency) p(EDG-FTS)= 8.26E-03/ demand (probability that EDG fails to start)

(1.42E-@

  • 1.5E-01
  • 8.26E-03)/365 - 4.82E-09/yr (i.e. the frequency of LOCA coincident with LOSP and EDG HS is app.cximately 5.0E-09/yr using St. Lucie plant-specific data)

Ising g:neric data the following result is obtained:

f(LOCA)= 2.66E-02/yr f(LOSP)= 3.39E-02/yr p(EDG-FTS)= 2.57E-02/ demand (2.66E 02

  • 3.39E-02
  • 2.57E-02)/365

,6.35E-08/yr e e ic estimates yield a result of appro ately r

(uf.%

.id f

.. J