Forwards IE Inspec Rept 50-298/78-15 on 780928-30 & Notice of Deviation
ML20148D939
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/12/1978
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20148D944 List:
References
NUDOCS 7811060051
Download: ML20148D939 (2)


See also: IR 05000298/1978015

Text

_ ____ _ _ - - - _ _ _ _ _ _ _ _ _ .

"

.,

,() ' i

,

~ O RfC UNITED STATES M

o NUCLEAR nEGULATORY COMMISSION

y n REGION IV

$*

o '.

,$

,

'[

611 HYAN PLAZA DRIVE, SUITE 1000

AR LINGTON, TEX AS 76011

h

I

%, -

/

September 12, 1978

In Reply Refer To:

Docket No. 50-298/78-15

Nebraska Public Power District

ATTN: Mr. J. M. Pilant, Director

Licensing and Quality Assurance

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

This refers to the inspection conducted by Mr. E. H. Johnson of this

office during the period August 28-30, 1978 of activities authorized by

NRC Operating License DPR-46, and to the discussion of the findings

with Mr. L. C. Lessor.

Principal areas examined during the inspection included: (1) routine

plant operations; and (2) maintenance activities. Within these areas,

'

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observations by

the inspector.

Two new unresolved items were noted and are identified in the enclosed

~

report.

Based on the results of this inspection it appears that one of your

activities was not carried out in accordance with an industry approved

code. You are requested to submit to this office within 20 days of your

rec::1pt of this notice, a written statement in reply including: (1)

actions you have taken to satisfy the requirements of this code or

alternative steps you have taken, or are planning, to provide equivalent

protection; and (2) the date when the above actions will be completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the:

enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contains any information that you or your contrac-

tors believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

781 lG CCY

-_ _ _ _ _ _ _ .

e 4

Nebraska Public Power District -2- September 12, 1978

from public disclosure. Any such application must include a full state-

ment of reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

.lbb$<2&v

G. L. Madsen, Chief,

Reactor Operations and

Nuclear Support Branch

Enclosures:

1. Notice of Deviation

2. IE Inspection Report No. 50-298/78-15

l

l cc w/ enclosures:

l L. C. Lessor, Superintendent

! Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

.

.