|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 TXX-9922, Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 9908201999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure TXX-9920, Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively1999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted TXX-9918, Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 19991999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval TXX-9917, Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-62301999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan 1999-09-07
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062G5471990-11-26026 November 1990 Forwards Summary of NRC Understanding of Current Status of Unimplemented GSIs at Facility ML20058H5501990-11-14014 November 1990 Forwards Insp Repts 50-445/90-40 & 50-446/90-40 on 900918- 1030.Violations Noted But Not Cited IR 05000445/19900371990-11-0808 November 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/90-37 & 50-446/90-37 ML20058G1521990-11-0505 November 1990 Discusses Util 900529 Response to 900402 Notice of Violation.Violations 445/8923-V-01 & 446/8923-V-01 Closed, Per Insp Repts 50-445/89-23 & 50-446/89-23 ML20058G4791990-10-31031 October 1990 Forwards Summary of 901022 Meeting W/Util in Arlington,Tx Re Secondary Plant Reliability Problems at Unit 1 ML20058E6931990-10-29029 October 1990 Forwards Generic Fundamentals Exam Section of Written Operator Licensing Exam Administered on 901010 IR 05000445/19900361990-10-26026 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/90-36 & 50-446/90-36 ML20058A7121990-10-19019 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/90-16 & 50-446/90-16 on 900806 ML20058A0971990-10-10010 October 1990 Forwards Insp Repts 50-445/90-31 & 50-446/90-31 on 900807- 0918 & Notice of Violation ML20062B2211990-10-0909 October 1990 Requests Response to Question Re Facility Cold Overpressure Mitigation Sys Actuation During Accident Events.Response Requested by 901214 ML20059N4711990-10-0303 October 1990 Ack Receipt of Forwarding Rev 8 to Physical Security Plan.Changes Consistent w/10CFR50.54(p) ML20059K3361990-09-17017 September 1990 Forwards Insp Repts 50-445/90-36 & 50-446/90-36 on 900820- 24 & Notice of Violation ML20059K3561990-09-13013 September 1990 Ack Receipt of 900904 Response to Violations Noted in Insp Repts 50-445/90-22 & 50-446/90-22 ML20059J9861990-09-13013 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Exam to Be Administered on 901010.Results of Exam Should Be Available within 3 Wks of Completion ML20059K3581990-09-13013 September 1990 Ack Receipt of 900820 Revised Response to Violations Noted in Insp Repts 50-445/89-57 & 50-446/89-57 ML20059J6171990-09-11011 September 1990 Forwards Insp Repts 50-445/90-30 & 50-446/90-30 on 900723- 0802.No Violations or Deviations Noted ML20059J2451990-09-10010 September 1990 Forwards Insp Repts 50-445/90-29 & 50-446/90-29 on 900723-27.No Violations Noted ML20059E2301990-08-31031 August 1990 Forwards Insp Repts 50-445/90-26 & 50-446/90-26 on 900705-0807.No Violations or Deviations Noted ML20059F3021990-08-30030 August 1990 Forwards Insp Repts 50-445/90-28 & 50-446/90-28 on 900716-20.No Violations or Deviations Noted ML20059D6511990-08-29029 August 1990 Forwards Insp Repts 50-445/90-34 & 50-446/90-34 on 900731- 0807 & Notice of Violation.Action Already Taken to Correct Hot Standby Operating Procedure Inadequacies & No Response to Violation Required ML20059D7791990-08-28028 August 1990 Forwards Investigation Synopsis Re Alleged Attempt to Inhibit Employee from Bringing Safety Concerns to Nrc. Investigation Completed in Apr 1990 ML20056B2681990-08-22022 August 1990 Advises That 881130,890313,0526 & 0920 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss Acceptable ML20059A5891990-08-15015 August 1990 Ack Receipt of 900730 Response to Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19 ML20058M2271990-08-0606 August 1990 Forwards Insp Repts 50-445/90-16 & 50-446/90-16 on 900423-27.Unresolved Item Identified.Inspector Determined That Key Emergency Response Personnel Not Always Proficient in Some Duties ML20058M2441990-08-0303 August 1990 Forwards Insp Repts 50-445/90-22 & 50-446/90-22 on 900606-0703 & Notice of Violation.Written Response Requested Based on Specifics Contained in Notice ML20056A1741990-07-30030 July 1990 Advises That Written & Operating Licensing Exams Scheduled for Wk of 901126.Licensee Should Furnish Ref Matl Listed in Encl 1 by 900904 ML20055J1481990-07-27027 July 1990 Forwards Performance Assessment Repts 50-445/90-20 & 50-446/90-02 on 900529-0615.Startup Test Program Conducted in Safe & Prof Manner & Facility Operation Could Proceed Above 50% Power ML20056A1161990-07-27027 July 1990 Forwards Summary of 900717 Meeting in Region IV Ofc Re Const Restart for Unit 2.List of Attendees & Viewgraphs Also Encl ML20055J4311990-07-26026 July 1990 Advises That 900601 Rev 7 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable. Portions of Plan Administrative in Nature & Do Not Reduce Plan Effectiveness ML20056A0441990-07-25025 July 1990 Grants Temporary Waiver of Compliance from Tech Specs 3.3.2 & 3.6.2.1 Re Containment Spray Sys in Order to Repair & Test Containment Pressure Transmitter 1-PT-0934 W/Unit in Hot Standby ML20055G7671990-07-20020 July 1990 Ack Receipt of in Response to 900705 Telcon Re Acceptability of THERMO-LAG Fire Barrier Matl.Correspondence Reviewed & Matter Closed ML20055G8701990-07-20020 July 1990 Forwards Insp Repts 50-445/90-23 & 50-446/90-23 on 900618-22.No Violations or Deviations Noted ML20055G0541990-07-13013 July 1990 Forwards Insp Repts 50-445/90-24 & 50-446/90-24 on 900618-22 & 25-28.No Violations or Deviations Identified ML20056A0051990-07-11011 July 1990 Advises That NRC Draft Document Re Concerns Associated W/ Util 891229 Response to Insp Repts 50-445/89-60 & 50-446/89-60 Being Placed in Pdr.Opinions in Draft Do Not Constitute Final Agency Position ML20055E8231990-07-0909 July 1990 Advises of Maint Team Insp Scheduled for Wks of 901015,29 & 1105 at Plant & Confirms Telcon Between to Mckernon & T Hope Re Insp.Team Plans to Hold Meeting W/Util at Plant Site on 901002-04 to Define Scope of Insp.List of Matls Needed Encl ML20055E4871990-07-0303 July 1990 Expresses Appreciation for Volunteering to Participate in Emergency Response Data Sys (Erds).Implementation of ERDS Will Prove to Be Beneficial to Both NRC & Util.Survey Designed to Provide Hardware & Communications Info Encl ML20055D4201990-06-29029 June 1990 Forwards Insp Repts 50-445/90-19 & 50-446/90-19 on 900503-0605 & Notice of Violation.Util Should Review Strike Contingency Plans or Procedures to Assure That Appropriate Plans in Place Before Next Strike Negotiation Deadline ML20044A0621990-06-25025 June 1990 Ack Receipt of & Payment of Civil Penalty in Amount of $25,000,per NRC ML20055C7611990-06-15015 June 1990 Concludes That Plant Equipment,Program & Personnel Performance Adequate & That Testing Program Can Continue Above 50% Power Plateau to full-power,per Insp Repts 50-445/90-20 & 50-446/90-20 to Be Issued at Later Date ML20059M8611990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20043B8991990-05-29029 May 1990 Advises That 900502 Response to 900402 Notice of Violations Accepted & No Addl Response Required.Violations 445/8923-V-01 & 446/8923-V-01 Will Be Closed ML20043B8951990-05-24024 May 1990 Discusses Plans for Dissolving Comanche Peak Project Div & Realigning Organization Structure for Licensing & Insp of Plants,Effective 900603 ML20043B9451990-05-23023 May 1990 Forwards Insp Repts 50-445/90-15 & 50-446/90-15 on 900507-11.No Violations or Deviations Noted ML20043B1601990-05-15015 May 1990 Provides Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exam to Be Administered on 900606,including Map of Area,List of Lodging in Immediate Area & Preliminary Instructions for Taking Exam ML20034C8781990-05-15015 May 1990 Requests Assessment of Citizens for Fair Util Regulation 900412 Concerns,In Coordination W/State of Tx & Local Authorities Re Deficiencies in Public Educ & Info Program & Alert Notification Sys for Plant,Based on Survey ML20043A4601990-05-14014 May 1990 Ack Receipt of 891221 Response to Violations Noted in Insp Repts 50-445/89-60 & 50-446/89-60.Implementation Documented in Insp Repts 50-445/90-03 & 50-446/90-03 Adequate ML20042F6021990-05-0404 May 1990 Forwards Insp Repts 50-445/90-12 & 50-446/90-12 on 900402-06.Violations Identified But Not Cited ML20042F2021990-04-26026 April 1990 Informs of Issuance of NUREG/BR-0122, Examiners Handbook for Developing Operator Licensing Written Exams, Rev 5,dtd Mar 1990 IR 05000445/19890791990-04-23023 April 1990 Ack Receipt of 891218 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/89-79 & 50-446/89-79 IR 05000445/19892001990-04-19019 April 1990 Ack Receipt of Util Informing NRC of Steps Taken to Correct Violation & Deviation Noted in Insp Rept 50-445/89-200 1990-09-17
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H7501999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209G7421999-07-0808 July 1999 Forwards SER Concluding That Licensee Individual Plant Exam of External Events Process Capable of Identifying Most Likely Severe Accidents & Severe Accident Vulnerabilities & IPEEE Met Intent of Supp 4 to GL 88-20 ML20196L0121999-07-0808 July 1999 Forwards Safety Evaluation Granting First 10-Year Interval Inservice Insp Requests for Relief B-6 (Rev 2),B-7 (Rev 2), B-12,B-13,B-14 & C-9,pursuant to Tile 10CFR50.55a(g)(6)(i) ML20196K6771999-07-0202 July 1999 Ack Receipt of & Encl Scenario for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721-22.Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20196J0401999-06-29029 June 1999 Forwards Safety Evaluation Re Plant,Units 1 & 2 Proposed Changes to Emergency Plan ML20196J4881999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid as Version 2 ML20196E6641999-06-22022 June 1999 Forwards Insp Repts 50-445/99-11 & 50-446/99-11 on 990418- 0529.No Violations Noted.Licensee Conduct of Activities Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance & Acceptable Radiological Control ML20195G3771999-06-0909 June 1999 Ack Receipt of Ltr & Encl Objectives for Comanche Peak Steam Electric Station Emergency Plan Exercise Scheduled for 990721.Based on Review,Nrc Determined That Exercise Objectives,Appropriate to Meet Plan Requirements ML20207H3801999-06-0909 June 1999 Forwards Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Violations Identified & Being Treated as Noncited Violations ML20207G3291999-06-0707 June 1999 Ack Receipt of Which Transmitted Rev 27 to Comanche Peak Steam Electric Station EP Under Provisions of 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of EP No NRC Approval Required ML20207E9291999-06-0202 June 1999 Discusses 990526 Request That USNRC Exercise Discretion Not to Enforce Compliance with TS 4.8.2.1e Re Performance of Battery Performance Discharge Test,In Lieu of Battery Svc Test.Concludes Action Satisfactory & Discretion Exercised ML20207D7111999-05-28028 May 1999 Advises That Info Contained in Licensee 990514 Submittal Re License Amend Request 98-01-0 Will Be Withheld from Public Disclosure,Per 10CFR2.790. 10CFR2.790 ML20207D7011999-05-27027 May 1999 Advises That Info Contained in TU Electric 990514 Submittal (TXX-99115) Re License Amend Request 98-010 Will Be Withheld from Public Disclosure (Ref 10CFR2.790),per 990511 Application & Affidavit ML20207B7241999-05-25025 May 1999 Advises That Info Contained in Application & Affidavit 990507 (CAW-99-1333),submitting WCAP-15004,dtd Dec 1997,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 ML20206P5961999-05-12012 May 1999 Forwards Insp Repts 50-445/99-09 & 50-446/99-09 on 990419- 23.No Violations Noted.Nrc Determined That Releases of Radioactive Waste Effluents Controlled,Monitored & Quantified Well ML20206N7061999-05-12012 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Reorganization Chart Encl ML20206S5841999-05-11011 May 1999 Forwards Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint & Acceptable Radiological Controls ML20206K0311999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key Encl for Info,Without Encl ML20206H1701999-05-0606 May 1999 Forwards Copy of Exemption & Safety Evaluation Supporting Requirement in App K to 10CFR50.Proposal Will Use New Feedwater Flow Measurement Sys to Allow More Accurate Measurement to Thermal Power ML20206K3931999-05-0505 May 1999 Ltr Contract,Task Order 41, Comanche Peak Safety System Engineering Insp, Under Contract NRC-03-98-021 ML20206G1221999-05-0303 May 1999 Discusses 981215 Request That Document, Responses & Further Clarifications to NRC Questions from 980929 Meeting, Be Withheld from Public Disclosure.Determined Information to Be Proprietary & Will Be Withheld from Public Disclosure ML20206F5711999-04-30030 April 1999 Forwards Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Insp Re Focus on Radiation Protection Program Activities During Unit 2 Refueling Outage ML20206E5211999-04-27027 April 1999 Discusses GL 96-01 Issued on 960110 & TU Responses, ,970102 & 980502 for Cpses,Units 1 & 2.Determined That Submittals Provided Both Info Requested & Responses Required by GL 96-01 ML20206B3831999-04-23023 April 1999 Forwards FEMA Final Rept for 990311,Comanche Peak Steam Electric Station Medical Drill.No Deficiencies or Areas Requiring Corrective Actions Identified ML20206B5321999-04-22022 April 1999 Ack Receipt of Ltrs Dtd 970407,09 & 0204,which Transmitted Revs 6 & 7 to Safeguards Continency Plan,Rev 10 to Security Training & Qualification Plan & Rev 29 to Physical Security Plan Submitted Under Provisions of 10CFR50.54(p) ML20206A2301999-04-14014 April 1999 Refers to Public Meeting Conducted on 990329 in Glen Rose, Tx Re Results of Plant Performance Review Completed on 990211 & Transmitted to Licensee on 990319.List of Attendees Encl ML20205L8711999-04-0707 April 1999 Forwards Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Were Identified.Review of Operability Evaluation Re MOVs Disclosed That Licensee Failed to Include Info About Degraded ECCS Performance ML20205L1051999-04-0606 April 1999 Informs of Completion of Review of Tuec 980312 Submittal Re GL 97-05, SG Tube Insp Techniques. No Concerns Identified with SG Insp Techniques Employed at Cpses,Units 1 & 2,that Would Indicate Noncompliance with Current Licensing Basis ML20205F9141999-04-0101 April 1999 Informs That as of 990329 Dh Jaffe Has Been Assigned as Senior Project Manager for Plant IR 05000446/19920491999-03-24024 March 1999 Discusses Concern That Postulated Fire in CR Could Create Single Hot Short in Control Circuitry of MOVs Resulting in Spurious Operation.Required Hardware Mods Implemented to Control Circuits of Affected Mov,Per Insp Rept 50-446/92-49 ML20204F3311999-03-23023 March 1999 Forwards Discussion Items for 990323 Telcon 1999-09-07
[Table view] |
See also: IR 05000445/1988010
Text
,
.
. _ _ _ _ _
. _ _ .
.
'
.
.
In Reply Refer To:
Dockets:
50-445/88-10
MAR I 8 $08
50-446/88-08
TU Electric
ATTN:
Mr. W.
G.
Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Mr. C. J. Hale
and
NRC
consultants during the period February 3 throu;h March 1,
1988, of
activities authorized by NRC Construction Permits CPPR-126 and
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
and 2, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the
inspectors.
Within the secpe of the inspection, no violations or deviations
were identified.
In accordancc with 10 CFR 2.790 of the Commission's regulations,
a
copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
ORIGINAL CICNED EY n, r, y,'?mt:cy
R.
F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
office of Special Projects
Enclosure:
Inspection Report
50-445/88-10; 50-446/88-08
cc w/enclosute:
See next page
J
RRO
IP:CPPD:OSP,f[p
IP:CPPD:OSPg
AD:IP:CPPD:OSP
j
HLivermore
RWarnick
g$og
dnCHale
3/IT/88
3/l6/88
3//f/88
(
8803240072 890313
PDR
ADOCK 05000445
O
DCD
.
-
.
'
/'sYCIQy
~
y
'
o,,
UNITED STATIES
-
'
,[ "
NUCLEAR REGULATORY COMMISSION
o
g
WASHINGTON. O. C. 20555
k
'
p
g****
b'ES I O 1968
n Reply Refer To:
Docketsi
50-445/88-10
50-446/88-08
TU Electric
ATTN:
Mr. W. G.
Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
Gentlemen:
'
This 1
to the inspection conducted by Mr. C. J. Male
and
NRC
'.
consu;
during the period February 3 threeph March 1, 1988, of
activj
authorized by NRC Construction FLrmits CPPR-126 and
.
CPPR-1., for the Comanche Peak Steam Electric Stat!on, Units 1
and 2, and to the discussion of our findings with you and other
j
members of your staff at the conclusion of the inspection.
The enclosed copy of our inr~ 0etion report identifies areas
'
examined during the inspection.
Within these areas, the inspection
consisted of selective exaini." 'Jn of procedures and representative
records, interviews with personnel, and observations by the
inspectors.
,
Within the scope of the inspection, no violations or deviations
were identified.
'
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter and the enclosed inspection report will be
placed in the NRC Public Document Room.
'
should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
RF WA
R. F. Warnick, Assistant Director
i
for Inspection Programs
Comanche Peak Project Division
i
office of Special Trojects
Enclosure:
Inspection Report
50-445/88-10; 50-446/88-08
-
cc w/ enclosure:
See next pnge
'
.
.
TU Electric
.
cc:
Roger D. Walker
Nancy H. Williams
Manager, Nuclear Licensing
CYGNA Energy Services
Texas Utilities Electric Company
Suite 390
Skyway Tower
2121 N. California Blvd
400 North Olive Street, L.B.
81
Walnut Creek, CA
94596
Dallas, TX
75201
Robert A. Wooldridge, Esq.
Juanita Ellis
Worsham, Forsythe, Sampels
President - CTSE
and Wooldridge
1426 South Polk Street
2001 Bryan Tower
Dallas, TX
75224
Suite 2500
Dallas, TX
75201
Renca Hicks, Esq.
Assistant Attorney General
Mr. Homer C. Schmidt
Environmental. Protection Division
Director of Nuclear
,
!
P.O. Box 12548, Capitol Station
Services
'
Austin, TX
78711-2548
TU Electric
Skyway Tower
Administrative Judge Peter Bloch
400 N. Olive St.,
L.B.
81
U.S. Nuclear Regulatory Commission
Dallas, TX
75201
Washington, DC
20555
l
Elizabeth B. Johnson
Kenneth A. McCollom
l
Administrative Judge
Administrative Judge
Oak Ridge National Laboratory
1107 West Knapp
Post Office Box X, Building 3500
Stillwater, OK
74075
Oak Ridge, TN
37830
l
GDS Associates, Inc.
l
Jack R. Newman, Esq.
1850 Parkway Place, Suite 720
Newman & Holtzinger, P.C.
Marietta, GA
30067-8237
1615 L Street,
N.W.,
Suite 1000
Washington, D.C.
20036
Mr. Robert E.
Ballard, Jr.
l
Director of Projects
l
Walter H. Jordan
Gibbs and Hill, Inc.
l
Administrative Judge
11 Penn Plaza
l
881 West Outer Drive
New York, NY
10001
Oak Ridge, Tennesee
37830
l
Mr. R. S. Howard
Anthony Z. Roisman, Esq.
Westinghouse Electric
l
Suite 600
Corporation
1401 New York Avenue, N.
W.
Post Office Box 355
Washington, DC
20005
Pittsburgh, PA
15230
Ms. Billie Pirner Garde, Esq.
Lanny A. Sinkin
Government Accountability Project
Christic Institute
Midwest Office
1324 N. Capitol Street
104 East Wisconsin Avenue - B
Washington, DC
20002
Appleton, WI
54911-4887
l
l
-
. -
_ - _
-
-
. - .
._
._ _.
.
.
.
.
.
TU Electric
cc w/ enclosure:
(continued)
David R.
Pigott, Esq.
Orrick, Herrington & Sutcliffe
600 Montgomery Street
San Francisco, CA
94111
Robert Jablon
Bonnie S. Blair
Spiegel & McDiarmid
1350 New York Avenue, NW
Washington, rc
20005-4798
George A.
Parker, Chairman
Public Utility Committee
Senior citizens Alliance of
Tarrant County, Inc.
6048 Wonder Drive
Fort Worth, TX
76133
Joseph F. Fulbright
Fulbright & Jaworski
1301 McKinney Street
Houston, TX
77010
Mr. Jack Redding
c/o Bethesda Licensing
TU Electric
3 Metro Center, suite 610
Bethesda, MD
20814
William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert &
Rothwell
suite 700
1025 Thomas Jefferson St., NW
Washington, DC
20007
i
Regional Administrator, Region IV
'
U.S.
Nuclear Regulatory Commission
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas
76011
!
!
(
l
l
l
l
I
.
.
.
.
. . _ .
-
-
. . - -
-