ML20148D379

From kanterella
Jump to navigation Jump to search
Advises That No Final Conclusions Can Be Drawn from 780824 Meeting at Facility Re Seismic Studies at Plant Site
ML20148D379
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 08/25/1978
From: Thompson G
STANFORD UNIV., STANFORD, CA
To: Savio R
Advisory Committee on Reactor Safeguards
References
ACRS-CT-1036, NUDOCS 7811020313
Download: ML20148D379 (1)


Text

STANFORD UNIVERS11.x 1

STANFORI), CALIFORNIA 94305 MENT OF GroPilYSICS 1 of Lard Socnces August 25, 1978 l

f,cCE!vt.u o v!sony G:.3;,T. a c.

RWm S.Wmps U.S. n ?, t Mr. Richard Savio Advisory Committee on Reactor Safeguards AUG 29 mp l

U. S. Nuclear Regulatory Commission Washington, DC 20555 3.p l

U l 0 E lia;.,

l

!.:06.W1 i 1 i

69 l

I

[7 /C

Dear Dick:

PDR hA/,7 As requested, I met with NRC, USGS, and GE representatives at the Vallecitos Nuclear Facility on 8-24, in company with Ben Page.

Proposals for trenching, possibly seismic profiling, and possibly drilling to resolve questions about faults and land-slides were discussed in depth. These plans are well thought out an'd hdyc a good chance of resolving the prob 1 cms.

It was a productive meeting, although no final conclusions can be drawn.

I'd like to reserve further comments pending rcccipt of the,back-Bround geologic material.

Ben and I also spent a couple of hours in the field looking at rock exposures, examin.ng the evidence regarding faulting, and sccing how the proposed trenches may pi down the questions.

f Sincerely,

/2 (, \\ y4 db'A '(f p /' George A. Thompson Professor of Geophysics GAT /md. 78M.C?. o 3/ 3 l l .}}