ML20148D379
ML20148D379 | |
Person / Time | |
---|---|
Site: | Vallecitos File:GEH Hitachi icon.png |
Issue date: | 08/25/1978 |
From: | Thompson G STANFORD UNIV., STANFORD, CA |
To: | Savio R Advisory Committee on Reactor Safeguards |
References | |
ACRS-CT-1036, NUDOCS 7811020313 | |
Download: ML20148D379 (1) | |
Similar Documents at Vallecitos | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARIR 05000070/19993011999-07-0101 July 1999
[Table view]Forwards Insp Repts 50-070/99-301,50-073/99-201 & 50-183/99-201 on 990607-10.No Safety Concern or Noncompliance to NRC Requirements Was Identified ML20206P6541999-01-0707 January 1999 Forwards Insp Rept 50-070/98-01 on 981116-19.No Violations Noted.Major Activities Reviewed as Part of Insp Focused on Program to Maintain Safstor Condition of General Electric Test Reactor IR 05000070/19982011998-05-0404 May 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-070/98-201, 50-073/98-201 & 50-183/98-201.First Example of Violation 2 Has Been Withdrawn.Actions Examined During Future Insp ML20217B7081998-04-14014 April 1998 Submits Errata to Annual Rept 29 for ESADA - Vallecitos Experimental Superheat Reactor ML20217C1171998-03-18018 March 1998 Forwards Insp Repts 50-070/98-201,50-073/98-201 & 50-183/98-201 on 980209-13 & Notice of Violation ML20198K2711998-01-0909 January 1998 Forwards Insp Repts 50-018/97-01,50-070-97-01 & 50-183/97-01 on 971204.No Violations Noted.One Unresolved Item Identified & Discussed in Section 1.2 of Encl Rept ML20059E3841993-12-21021 December 1993 Accepts Cost Estimate Related to Licenses DPR-1,R-33,TR-1 & DPR-10,per Review of Documents Provided Via 931013,1202 & 17 Ltrs in Support of 930831 Request for Decrease in Chemical Bank Ltr of Credit Amend & Trust Agreement Amount ML20059E4141993-12-0202 December 1993 Explains 1993 Cost Estimate for Regulatory Assurance Reduction,W/Respect to GE Ltr of Credit IR 05000183/19930041993-11-24024 November 1993 Forwards Insp Rept 50-183/93-04 on 931101-05.No Violations Noted ML20059E4021993-10-13013 October 1993 Explains 1993 Cost Estimate for Regulatory Assurance Reduction,W/Respect to GE Ltr of Credit ML20127D7751992-09-0404 September 1992 Forwards USGS Study of Seismic Potential of Northern Calaveras Fault,For Actions Required to Ensure That Safety Analysis Remain Valid ML20059F6501990-08-27027 August 1990 Advises That 900820 Request for Petition for Reconsideration of Denial of Specific Exemption from Financial Assurance Instrument Requirements of 10CFR50 & 70 Under Review.Request for Temporary Extension of 900831 Filing Deadline Granted ML20033H0511990-04-0606 April 1990 Forwards Amend 5 to License DR-10 & Safety Evaluation.Amend Changes License Condition 3.E.2 to Delete Requirement That Annual Rept Be Submitted 60 Days After Each Annual Insp Completed ML20011F5111990-02-0808 February 1990 Confirms Telecon Request Re 900223 Visit Re Decommissioning Funding Requirements & Estimated Decommissioning Cost Methodology ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20148C3851988-01-14014 January 1988 Forwards Amend 4 to License DR-10 & Safety Evaluation.Amend Changes Tech Specs to Permit General Radiation Survey Annually Instead of Twice Annually,Per 870816 Request ML20235T2431987-09-24024 September 1987 Forwards Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03 & Notice of Violation ML20236N0511987-08-0303 August 1987 Forwards Amend 15 to License TR-1 & Safety Evaluation. Amend Changes Tech Specs by Deleting Cooling Tower from Definition of Reactor Facility ML20215C8891987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.T Michaels Assigned as Project Manager for Facilities ML20214M6631987-05-22022 May 1987 Forwards Revised NRC Form 398.Rev Reflects Changes to 10CFR55 Effective on 870526.Revised Form Requires New Applications to Complete Each Category Including Educ, Training & Experience.Changes Detailed in Encl 2 ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20206M4181986-06-25025 June 1986 Forwards Insp Repts 50-018/86-01 & 50-183/86-01 on 860617.No Violation Noted ML20140G7211986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20210H8751986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20195C7181986-03-21021 March 1986 Responds to FOIA Request for Nine Categories of Records Re Damages Occurring to Nuclear Power Plants Following Earthquakes & 860131 Earthquake Near Perry Site.Forwards Apps a & B Documents.App B Documents Also Available in PDR ML20137R6811986-02-0505 February 1986 Forwards Amend 14 to License TR-1,safety Evaluation & Fr Notice.Amend Renews License for Possession Only Until 921001 ML20239A1971985-12-17017 December 1985 Further Response to 850927 & 1106 FOIA Requests for Documents Re Pressure Suppression Containment,Including Humboldt Bay & Bodega Bay Docket Files.Bodega Bay File Being Placed in Pdr.Review of Addl Documents Continuing ML20138B5131985-10-0808 October 1985 Forwards Corrected Page 2 to Insp Repts 50-070/85-01 & 50-073/85-02 Per 851007 Telcon Re Presence of Second Individual at Facility Whenever Licensed Operator W/Medical Restrictions Is Performing Licensed Activities ML20133H4331985-10-0101 October 1985 Forwards Insp Repts 50-070/85-01 & 50-073/85-02 on 850812-15 & Notice of Violation ML20133C2121985-09-30030 September 1985 Forwards Modified Tech Specs Re Storage & Disposal of Liquid Effluents & Elimination of Area Radiation Monitors for Shutdown of Test Reactor Facility.Info Suppls 850626 Submittal of License Renewal Info ML20128M2811985-07-15015 July 1985 Forwards Self-Evaluation of NSHC, Supplementing 850625 Application for Amend to License TR-1,changing Tech Specs to Permit Maint of Reactor in Possession/Nonoperating Status ML20128L6091985-06-26026 June 1985 Forwards Request to Revise 751021 Application to Renew License TR-1,authorizing Possession/Nonoperating Status for Getr,Per Revised Tech Specs ML20024E0661983-08-0505 August 1983 Clarifies Ambiguity Re Controlling Date for Filing Response. GE Will File Response on 830822.Certificate of Svc Encl ML20024D2031983-07-29029 July 1983 Advises That Time for Commission to Review ALAB-720 Expired. Commission Declined Review.Decision Became Final Agency Action on 830725 ML20058D2491982-07-20020 July 1982 Requests Extension Until 821103 for Submitting Revised Emergency Plan,Based on Classification as Minor Facility ML20055B4601982-07-14014 July 1982 Forwards Revised Security Plan for Protection of Reactor Facilities.Plan Withheld (Ref 10CFR2.790) ML20042A8361982-03-22022 March 1982 Forwards Info to Demonstrate Current Status of Plate Type Fuel Which No Longer Has Potential of Releasing Radioactive Matl If Loss of Storage Canal Water Were to Occur, Supplementing 820204 Request for Tech Spec Changes ML20049J8781982-03-22022 March 1982 Forwards Annual Financial Rept 1981 ML20049J9511982-02-18018 February 1982 Forwards Annual Rept 14 of Facility Changes,Tests & Experiments,1981 ML20049J9431982-02-18018 February 1982 Forwards Annual Rept 23 of Facility Changes,Tests & Experiments,1981 ML20041B8171982-02-17017 February 1982 Forwards IE Info Notice 80-32,Revision 1, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. W/O Encl ML20049J0611982-01-13013 January 1982 Advises That Full Implementation w/10CFR73.21 Requirements May Be Deferred Provided That Matl Shipment Schedule Adhered to & Safeguards Info Locked & Under Control of Authorized Individuals Only ML20052A7331981-12-0909 December 1981 Responds to FOIA Request for Six Categories of Documents Re Test & Research Reactors.Forwards Partial Listing of Documents & Occupational Radiation Exposure Data for Test & Research Reactors for 1978-79 ML20038A6241981-10-30030 October 1981 Forwards Public Version of Radiological Emergency Plan.Plan Addresses Both Reactor & Fuels Facilities,Per Alternative 3 in Modified Order to Modify License SNM-960 ML20032C7391981-10-13013 October 1981 Forwards Fr Notice & Press Release Re Proposed Addl Safeguards for Research Reactors ML20031C7401981-09-28028 September 1981 Responds to 800710 Request for Info Re Spent Fuel at Facility.Measurements,Calibr & Analytical Techniques for Controlling Spent Nuclear Matl Described in Procedures Are Inspected by IE to Determine Accuracy & Precision ML20010J5071981-08-17017 August 1981 Forwards Endorsement 27 to Maelu Policy MF-95 ML20010D0001981-08-12012 August 1981 Package of 35 Ltrs Supporting Facility Restart ML20030C6801981-08-12012 August 1981 Package of 21 Ltrs Supporting Relicensing of Facility 1999-07-01 Category:EDUCATIONAL INSTITUTION TO NRC MONTHYEARML19344F4061980-06-23023 June 1980
[Table view]Forwards Comments Re Seismic Design Considerations for Getr. Inadequate Info Re Reactor Site Precludes Comments or Suggestions for Alternative Considerations ML19330C5271980-06-20020 June 1980 Comments on seismic-geologic Assessment & Criteria Re Getr Presented by NRC Personnel at 800616-17 Meetings.Nrc Assessment & Criteria Are Reasonable & Conservative ML20148D3791978-08-25025 August 1978 Advises That No Final Conclusions Can Be Drawn from 780824 Meeting at Facility Re Seismic Studies at Plant Site 1980-06-23 Category:INCOMING CORRESPONDENCE MONTHYEARML20217B7081998-04-14014 April 1998
[Table view]Submits Errata to Annual Rept 29 for ESADA - Vallecitos Experimental Superheat Reactor ML20059E4141993-12-0202 December 1993 Explains 1993 Cost Estimate for Regulatory Assurance Reduction,W/Respect to GE Ltr of Credit ML20059E4021993-10-13013 October 1993 Explains 1993 Cost Estimate for Regulatory Assurance Reduction,W/Respect to GE Ltr of Credit ML20011F5111990-02-0808 February 1990 Confirms Telecon Request Re 900223 Visit Re Decommissioning Funding Requirements & Estimated Decommissioning Cost Methodology ML20133C2121985-09-30030 September 1985 Forwards Modified Tech Specs Re Storage & Disposal of Liquid Effluents & Elimination of Area Radiation Monitors for Shutdown of Test Reactor Facility.Info Suppls 850626 Submittal of License Renewal Info ML20128M2811985-07-15015 July 1985 Forwards Self-Evaluation of NSHC, Supplementing 850625 Application for Amend to License TR-1,changing Tech Specs to Permit Maint of Reactor in Possession/Nonoperating Status ML20128L6091985-06-26026 June 1985 Forwards Request to Revise 751021 Application to Renew License TR-1,authorizing Possession/Nonoperating Status for Getr,Per Revised Tech Specs ML20024E0661983-08-0505 August 1983 Clarifies Ambiguity Re Controlling Date for Filing Response. GE Will File Response on 830822.Certificate of Svc Encl ML20058D2491982-07-20020 July 1982 Requests Extension Until 821103 for Submitting Revised Emergency Plan,Based on Classification as Minor Facility ML20055B4601982-07-14014 July 1982 Forwards Revised Security Plan for Protection of Reactor Facilities.Plan Withheld (Ref 10CFR2.790) ML20049J8781982-03-22022 March 1982 Forwards Annual Financial Rept 1981 ML20042A8361982-03-22022 March 1982 Forwards Info to Demonstrate Current Status of Plate Type Fuel Which No Longer Has Potential of Releasing Radioactive Matl If Loss of Storage Canal Water Were to Occur, Supplementing 820204 Request for Tech Spec Changes ML20049J9431982-02-18018 February 1982 Forwards Annual Rept 23 of Facility Changes,Tests & Experiments,1981 ML20049J9511982-02-18018 February 1982 Forwards Annual Rept 14 of Facility Changes,Tests & Experiments,1981 ML20038A6241981-10-30030 October 1981 Forwards Public Version of Radiological Emergency Plan.Plan Addresses Both Reactor & Fuels Facilities,Per Alternative 3 in Modified Order to Modify License SNM-960 ML20010J5071981-08-17017 August 1981 Forwards Endorsement 27 to Maelu Policy MF-95 ML20010D0001981-08-12012 August 1981 Package of 35 Ltrs Supporting Facility Restart ML20030C6801981-08-12012 August 1981 Package of 21 Ltrs Supporting Relicensing of Facility ML20009H4831981-08-0606 August 1981 Forwards Reply to NRC & Intervenors Proposed Findings of Fact & Conclusions of Law ML20031A7891981-08-0505 August 1981 Supports Reactor Restart ML20010A7521981-07-27027 July 1981 Responds to NRC Re Violations Noted in IE Insp of Licenses DPR-1,TR-1,R-33 & DR-10.Corrective Actions: Procedures Modified to Assure That Employees Are Trained for Use of Respiratory Protection Equipment Specified for Job ML20031A7521981-07-20020 July 1981 Supports Reactor Restart ML19250J1661981-07-10010 July 1981 Requests Info Re Public Safety Concerns for Use in Possible Upcoming Facility Relicensing Hearings ML20005A5951981-06-26026 June 1981 Forwards Transcript Corrections Per Stipulation Approved by ASLB 810514 Order ML19352B2901981-06-22022 June 1981 Forwards Substitutions of Intervenor in Pro Per for Atty of Record for Nc Lyon,Ef Laub,J Turk,J Kamaoroff, J Buhowksy & J Skomer.Proof of Svc Encl ML19351A0321981-06-16016 June 1981 Supports Facility Restart.Expresses Concern Re Unavailability of Domestic Test Reactor to Perform Irradiations of Advanced Commercial Power Reactor Fuel ML19350E1001981-06-12012 June 1981 Notifies That Atlameda County Planning Commission Recommends That EIS for Getr License Renewal Discuss Constraints on Land Use Options for Adjoining Properties.County Plans Re Livermore-Amador Valley Encl ML20030C6651981-06-0808 June 1981 Discusses Getr Site.Reactor Operation Would Result in Negligible Hazard to Area,Considering Const & Design. Incomplete Earthquake Hazard Rept Encl ML20004D8821981-06-0404 June 1981 Recommends That EIS for Facility Include & Evaluate County General Plan Policies Re Seismic Safety,Constraints on Land Use Options for Adjoining Properties,Potential for Contaminated Runoff & Transportation Hazards ML20030C6881981-05-29029 May 1981 Expresses Concern Re Suspension of Matls Supplied from Getr Which Has Caused Economic Dislocations ML20030C6641981-05-26026 May 1981 Resolution Supporting Reopening of Test Facility ML20030C5751981-05-22022 May 1981 Supports Licensing of Facilities ML19346A2551981-05-21021 May 1981 Requests to Make Limited Appearance Statement ML19346A1311981-05-20020 May 1981 Requests to Make Limited Appearance Statement at Show Cause Proceeding ML19346A1331981-05-18018 May 1981 Requests to Make Limited Appearance Statement at Show Cause Proceeding ML19345H4241981-05-14014 May 1981 Requests to Make Limited Appearance Statement at 810527 Public Hearing in Livermore,Ca ML19347F6251981-05-14014 May 1981 Comments on EIS Re License Renewal for Getr.Requests Identification,Evaluation & Proposed Mitigation of Potential Significant Effects of Radioactivity on Surface & Groundwater Quality Resulting from Operation of Getr ML19346A1321981-05-13013 May 1981 Requests to Make Limited Appearance Statement at Show Cause Proceeding ML19346A1571981-05-12012 May 1981 Requests to Make Limited Appearance Statement at Show Cause Proceeding ML19345H4231981-05-0808 May 1981 Requests to Make Limited Appearance Statement on Resumption of Getr Operation ML20037D1961981-05-0808 May 1981 Requests to Make Limited Appearance Statement at 810601 Public Hearing in San Francisco,Ca Re Resumption of Getr Operation ML20004F4871981-05-0404 May 1981 Requests to Make Limited Appearance Statement at ASLB 810601 Hearing Re Facility ML20003F6131981-04-21021 April 1981 Forwards Detailed Procedures, Fuel Flooding Sys Acceptance Test Procedures, & Getr Seismic Trip Replacement Installation & Checkout Procedure, Per 810311 Commitment ML19347E3061981-04-13013 April 1981 Requests Nuclear Action Group Be Placed on Mailing List for Notices Re Hearing ML20126H0771981-03-26026 March 1981 Forwards Annual Financial Rept 1980 ML19345G5481981-03-23023 March 1981 Informs That J Rutherford,Witness for Intervenor,Will Appear at Hearings for Direct Testimony & cross-examination.Mailing List Encl.Related Correspondence ML19350C6511981-03-18018 March 1981 Forwards Endorsements 85 & 86 to ANI Policy NF-2 ML20003F6561981-03-16016 March 1981 Requests Info Re Shutdown Facilities in State of CA ML19350B7561981-03-11011 March 1981 Advises of Request to Make Limited Appearance Statement at Startup Hearing on 810527.Requests Placement on Mailing List for Related Notices & Info ML20008F4261981-03-11011 March 1981 Forwards Summaries of Fuel Flooding Sys Acceptance Test Procedure & Triaxial Seismic Switches Acceptance Test & Proposed Tech Specs for Seismic Mods 1998-04-14 |
Text
STANFORD UNIVERS11.x 1
STANFORI), CALIFORNIA 94305 MENT OF GroPilYSICS 1 of Lard Socnces August 25, 1978 l
f,cCE!vt.u o v!sony G:.3;,T. a c.
RWm S.Wmps U.S. n ?, t Mr. Richard Savio Advisory Committee on Reactor Safeguards AUG 29 mp l
U. S. Nuclear Regulatory Commission Washington, DC 20555 3.p l
U l 0 E lia;.,
l
- !.:06.W1 i 1 i
69 l
I
[7 /C
Dear Dick:
PDR hA/,7 As requested, I met with NRC, USGS, and GE representatives at the Vallecitos Nuclear Facility on 8-24, in company with Ben Page.
Proposals for trenching, possibly seismic profiling, and possibly drilling to resolve questions about faults and land-slides were discussed in depth. These plans are well thought out an'd hdyc a good chance of resolving the prob 1 cms.
It was a productive meeting, although no final conclusions can be drawn.
I'd like to reserve further comments pending rcccipt of the,back-Bround geologic material.
Ben and I also spent a couple of hours in the field looking at rock exposures, examin.ng the evidence regarding faulting, and sccing how the proposed trenches may pi down the questions.
f Sincerely,
/2 (, \\ y4 db'A '(f p /' George A. Thompson Professor of Geophysics GAT /md. 78M.C?. o 3/ 3 l l .}}