Text
_ _ __ _
January 20, 1988
.
'
DISTRIBUTION
' Docket File ~
JRutberg
NRC PDR
FMiraglia
Local PDR
EJordan
Mr. Steven A. White
TVA Reading
JPartlow
l
,
Manager of Nuclear Power
SEbneter/JAxelrad
ACRS (10)
j
Tennessee Valley Authority
GImbro
TVA-Bethesda
6N 38A Lookout Place
j
SRichardson
1101 Market Street
h
Chattanooga, Tennessee 37402-2801
aw
Dear Mr. White:
EMcKenna
We have received the TVA response to the Integrated Design Inspection (IDI)
report (IR 50-327/87-48,50-328/87-48) which addresses the specifir technical
issues identified by the NRC report. However. your response has omitted any
reference to the general observations identified in the report transmittal
letter.
Specifically, there are four (4) observations:
apparent lack of timely corrective actions by Division of Nuclear
Engineering (ONE),
4
weaknesses in desig verification process during initial plant
oesign,
lack of timely implementation of changes to statior, operating
procedures that result from DNE changes, and
lack of a systems integration function within DNE.
These are significant concerns that relate to DME and the Division of Nuclear
Quality Assurance (DNQA). At the NRC followup inspection exit meetin') in
Knoxville, Tennessee on November 19, 1987, we specifically requested the
Director, DNE and DNQA to address these items in tM TVA response to the IDI
report. The response does not address them. We reauest that you identify
,
specific corrective actions that TVA has taken, or will take, to' remedy the
above observations and respond to thic office by January 29, 1988
Sincerely,
original signed by
Stewart D. Ebneter Director
Office of Special Projects
g
DSP:TVA
OS60p"
OSE:P
~
E B h ha rd s g n _ _ _, ,,, M!gg gg _ _ _ , _ ,,,,, gM(/kad,,,,,,Hyng!gr,,,,,,,,,,__,
1
1/f/8o
1/M /88
1/($/88
1//h88
/
8801250291 880120
ADOCK 05000327
g
PDR.
L
.-
,
,
_
!
~
,
Mr. S. A. White
Tennessee Valley Authority
Sequoyah Nuclear Plant
cc:
General Counsel
Regional Administrator, Region 11
Tennessee Valley Authority
U.S. Nuclear Regulatory Commission
900 West Summit Hill Crive
101 Marietta Street, N.W.
Eli B33
Atlanta, Georgia 30323
Knoxville. Tennessee 37902
~
Resident inspector /Sequcyah NP
Mr. R. L. Gridley
c/o U.S. Nuclear Regulatory Commission
Tennessee Valley Authority
2600 Igou Ferry Road
SN 1578 Lookott Place
Soddy Daisy, Tennessee 37379
Chattanooga, Tennessee 37402-2801
Mr. Richard King
Mr. H. L. Abercrombie
c/o U.S. GA0
Tennessee Valley Authority
1111 North Shore Drive
Sequoyah Nuclear Plant
Suite 225. Cox 194
P.O. Box 2000
Knoxville, Tennessee 37919
Soddy Daisy, Tennessee 37379
Tennessee Department of
Mr. M. R. Harding
Public Health
Tennessee Valley Authority
ATTN:
Director. Bureau of
Sequoyah Nuclear Plant
Environmental Health Services
P.O. Box 2000
Cordell Huil Building
Soddy Daisy, Tennessee 37379
Nashvilla, Tennessea 37219
Hr. D. L. Williams
Mr. Michcel H. Mobley, Director
Tennessee Valley Authority
Divisien of Radiological Health
400 West Sunmit Hill Drive
T.E.R.R.A. Building
W10 BS5
150 9th Avenue Nort!.
-
Knoxville, Tennessee 37902
Nashville, Tennessee 37203
County Judge
Dr. Henry Mycrs, Science Advisor
Hamilton County Courthouse
Committee on Interior
Chattanooga, Tennessee 37402
and Insular Affairs
U.S. House of Representatives
Washington, D.C.
20515
i