Requests That Util Identify Specific Actions Taken,Will Take to Remedy Listed Observations from Integrated Design Insp Repts 50-327/87-48 & 50-328/87-48.Response Requested by 880129
ML20148C923
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/20/1988
From: Ebneter S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8801250291
Download: ML20148C923 (2)


See also: IR 05000327/1987048

Text

_ _ __ _

.

January 20, 1988

'

DISTRIBUTION

' Docket File ~ JRutberg

NRC PDR FMiraglia

Local PDR EJordan

Mr. Steven A. White ,

Manager of Nuclear Power TVA Reading JPartlow l

Tennessee Valley Authority SEbneter/JAxelrad ACRS (10) j

GImbro TVA-Bethesda

6N 38A Lookout Place j

SRichardson

1101 Market Street h

Chattanooga, Tennessee 37402-2801

aw

Dear Mr. White: EMcKenna

We have received the TVA response to the Integrated Design Inspection (IDI)

report (IR 50-327/87-48,50-328/87-48) which addresses the specifir technical

issues identified by the NRC report. However. your response has omitted any

reference to the general observations identified in the report transmittal

letter. Specifically, there are four (4) observations:

apparent lack of timely corrective actions by Division of Nuclear

Engineering (ONE),

4

weaknesses in desig verification process during initial plant

oesign,

lack of timely implementation of changes to statior, operating

procedures that result from DNE changes, and

lack of a systems integration function within DNE.

These are significant concerns that relate to DME and the Division of Nuclear

Quality Assurance (DNQA). At the NRC followup inspection exit meetin') in

Knoxville, Tennessee on November 19, 1987, we specifically requested the

Director, DNE and DNQA to address these items in tM TVA response to the IDI

report. The response does not address them. We reauest that you identify ,

specific corrective actions that TVA has taken, or will take, to' remedy the

above observations and respond to thic office by January 29, 1988

Sincerely,

original signed by

Stewart D. Ebneter Director

Office of Special Projects

g

DSP:TVA NRR OS60p" OSE:P

~

E B h ha rd s g n _ _ _, ,,, M!gg gg _ _ _ , _ ,,,,, gM(/kad,,,,,,Hyng!gr,,,,,,,,,,__,

1

1/M /88 1//h88 /

1/($/88 1/f/8o

8801250291 880120

PDR ADOCK 05000327

g PDR.

L .- , , _

!

,

~

Mr. S. A. White

Tennessee Valley Authority Sequoyah Nuclear Plant

cc:

General Counsel Regional Administrator, Region 11

Tennessee Valley Authority U.S. Nuclear Regulatory Commission

900 West Summit Hill Crive 101 Marietta Street, N.W.

Eli B33 Atlanta, Georgia 30323

Knoxville. Tennessee 37902

Resident inspector /Sequcyah NP

~

Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Commission

Tennessee Valley Authority 2600 Igou Ferry Road

SN 1578 Lookott Place Soddy Daisy, Tennessee 37379

Chattanooga, Tennessee 37402-2801

Mr. Richard King

Mr. H. L. Abercrombie c/o U.S. GA0

Tennessee Valley Authority 1111 North Shore Drive

Sequoyah Nuclear Plant Suite 225. Cox 194

P.O. Box 2000 Knoxville, Tennessee 37919

Soddy Daisy, Tennessee 37379

Tennessee Department of

Mr. M. R. Harding Public Health

Tennessee Valley Authority ATTN: Director. Bureau of

Sequoyah Nuclear Plant Environmental Health Services

P.O. Box 2000 Cordell Huil Building

Soddy Daisy, Tennessee 37379 Nashvilla, Tennessea 37219

Hr. D. L. Williams Mr. Michcel H. Mobley, Director

Tennessee Valley Authority Divisien of Radiological Health

400 West Sunmit Hill Drive T.E.R.R.A. Building

W10 BS5 150 9th Avenue Nort!.

-

Knoxville, Tennessee 37902 Nashville, Tennessee 37203

County Judge Dr. Henry Mycrs, Science Advisor

Hamilton County Courthouse Committee on Interior

Chattanooga, Tennessee 37402 and Insular Affairs

U.S. House of Representatives

Washington, D.C. 20515

i

I

l

I

l

l

1

I