Forwards Insp Repts 50-445/78-13 & 50-446/78-13 on 780801-31 & Notice of Violation
ML20148C436
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/19/1978
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20148C440 List:
References
NUDOCS 7811020048
Download: ML20148C436 (2)


See also: IR 05000445/1978013

Text

-.

.

_ _ _ _ _ - _

_

en "Scoq

UNITE D STATES

g

,.p;

,. o

NUCLEAR REGULATORY COMMISSION

n

REGION IV

5

E

611 RYAN PLAZA DRIVE, SUITE 1000

j

AR LIN GTON, TEXAS 76011

!

%N

/

j

September 19, 1978

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 78-13

50-446/Rpt. 78-13

Texas Utilities Generating Company

ATTN:

Mr. R. J. Gary, Executive

.

President and General Manager

2001 Bryan Tower

Dallas, Texas

75201

Gentlemen:

This refers to the inspection activities performed by our Resident Inspec-

tor, Mr. R. G. ' Taylor, during the period August 1-31, 1978, of activities

authorized by NRC Construction Permit Nos. CPPR-126 and 127 for the

Comanche. Peak facility, Units No.1 and 2, and to the discussion of our

findings with Mr. R. G. Tolson and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted

of selective examination of procedures and representative records, inter-

views with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with Appendix B to 10 CFR 50 of the

NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."

The Notice of Violation for the item of noncompliance reported in paragraph

11 of the enclosed inspection report is sent to you pursuant to the pro-

visions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within 30 days of your receipt of this notice, a written statement

or explanation in reply including: (1) corrective steps which have been

taken by you, and the results achieved; (2) corrective steps which will be

taken to avoid further noncompliance; and (3) the date when full compliance

will be achieved.

The Notice of Violation for the item of noncompliance reported in paragraph

7 of the enclosed inspection report was forwarded to you by our letter dated

August 30, 1978; therefore, this letter does not require further response

regarding this matter.

781031~0 N

781102 ooW

k

- ..

. _ _ _

'

' Texas' Utilities Generating

Company

-2-

September 19, 1978

One new unresolved item is identified in paragraph 7 of the enclosed

report.

. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the flRC's Public Document

Room.

If the report contains any infonnation that you believe to be

proprietary, it is necessary that you submit a written application to

this office, within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure.

The application

must include a full statement of the reasons why it is claimed that the '

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

,

/

.

.

f

', &

<

W. C. Seih, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

IE Inspection Report flo. 50-445/78-13

50-446/78-13

cc: w/ enclosures

Texas Utilities Generati,9 Company

ATTN:

Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas

75201

_________________