Forwards Insp Repts 50-254/97-07 & 50-265/97-07 on 970421-25 & Notice of Violation.First Violation Concerned Matl Released to Facility Identified to Be Contaminated at Offsite Location
ML20148C285
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/09/1997
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kraft E
COMMONWEALTH EDISON CO.
Shared Package
ML20148C290 List:
References
50-254-97-07, 50-254-97-7, 50-265-97-07, 50-265-97-7, NUDOCS 9705150300
Download: ML20148C285 (3)


See also: IR 05000254/1997007

Text

.

..~ --. - - . - -. _ - - - -. _ - _ .. - -

. -

. - -

. -

.

O LO

-

[,

!

i

'

l

!

l

May 9, 1997

I:

,

Mr. E. Kraft

Site Vice President

.!

'

Ouad Cities Station

l

Commonwealth Edison Company

j

22710 206th Avenue North

'

?

Cordove, IL 61242

j

\\

i

Dear Mr. Kraft:

'

SUBJECT:

NRC RADIATION PROTECTION INSPECTION REPORTS 50-254/97007(DRS);

,

50-265/97007(DRS) AND NOTICE OF VIOLATION

2

!

I

On April 25,1997, the NRC completed an inspection at your Oosd Cities Nuclear Power

Station. ' The purpose of the inspection was to review radiation protection performance

l

during the Unit 2 refueling outage (02R14). The enclosed report presents the results of

l

this inspection.

,

I

,

j-

Overall, good radiological controls were implemented during the outage. In particular, your

i

efforts to include contingent and emergent work dose estimates, based on historical data,

into the dose goals led to conservative outage ALARA planning. This resulted in the

!

implementation of good ALARA controls during high dose jobs such as the use of cameras

i

to monitor undervassel activities and to monitor the replacement of the Unit 2 recirculation

!

pump motor.

I

!

We are concerned, however, about two violations of NRC requirements that were

identified. In the f;rst instance, material which had been released from your facility was

i

identified to be contaminated at an offsite location, in the second instance, engineering

controis which were specified for use during work on a Unit 2 reactor water cleanup

i

,

(RWCU) system valve were not used which resulted in a worker's intake of radioactive

'

material. Oversight of and preparation for this job were determined to be ineffective. As

!

stated in the report, the similarity of this event to other events in previous outages

indicates that improvement was needed in the planning and control of valve work.

These violations are cited in the enclosed Notice of Violation (Notice) and the

circumstances surrounding them are described in detail in the enclosed report. Please note

J

that your are requirnd to respond to this letter and should follow the instructions specified

in the enclosed Notice when preparing your response. The NRC will use your response, in

'

part, to determine whether further enforcement action is necessary to ensure compliance

>

with regulatory requirements.

' In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

,

and its enclosures will be placed in the NRC Public Document Room.

9705150300 970509

Ih

PDR

ADOCK 05000254

G

PDR

&

H.H.H.IH.E,H.H.H.

. _ . . - . . . _ . . . . . . _ . . .

L

___ ..

__

__

__

.

E. Kraft

-2-

May 9, 1997

i

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/ Melvyn Leach

Melvyn Leach, Acting Deputy Director

Division of Reactor Safety

i

Docket No. 50-254

Docket No. 50-265

Enclosures:

1. Notice of Violation

2. Inspection Reports 50 254/97007(DRS); 50-265/97007(DRS)

cc w/encis:

T. J. Maiman, Senior Vice President,

j

Nuclear Operations Division

]

D. A. Sager, Vice President,

j

Generation Support

H. W. Keiser, Chief Nuclear

,

Operating Officer

L. W. Pearce, Station Manager

C. C. Peterson, Regulatory Affairs Manager

1. Johnson, Acting Nuclear Regulatory

Services Manager

,

Document Control Desk - Licensing

,

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

1

.

Chairman, Illinois Commerce Commission

J. R. Bull, Vice President, General &

Transmission, MidAmerican Energy Company

'

Distribution:

Docket File w/encls

Rill PRR w/encls

A. B. Beach, Rlli w/encls

PUBLIC IE-01 w/encls

SRis, Quad Cities,

Rill Enf. Coordinator w/encls

OC/LFDCB w/encls

Dresden, LaSalle w/encls R. A. Capra, NRR w/encls

DRP w/encls

TSS w/encls

C. D. Pederson, Rill w/encls

4

DRS w/encls

LPM, NRR w/encls

CAA1 w/encls

DOCUMENT NAME: G:\\DRS\\QUA97007.DRS

(SEE PREVIOUS CONCURRENCE)

To reoolve a copy of this document, Indicate in the box 'C' = Copy w/o attach /enct 'E' = Copy w/ attach /enci *N* = No

copy

OFFICE

Rill:DRS

Rlil:DRS

Rill:DRP

Rit!:DRS

w

NAME

NShah:Jp

TKozak

WKropp

ML6ach W

DATE

05/ /97

05/

/97

05/ /97

OSkat /97

Of FICIAL RECORD COPY

_ ... _ _ _ ..

- _ _ _ . __ _ _ _ _ ....__ . _ ...____ _ ._....._ _

. . _ _ . . . _ . _ - . _ . . _ _ _ ,

-.

.;

.

,

>

i..

l

,

E. Kraft

-2-

!

We will gladly discuss any questions you have concerning this inspection.

l

)

Sincerely,

i

1

<

1

'

,

Melvin Leach, Acting Deputy Director

!.

Division of Reactor Saf1ty

,

j_

Docket No. 50-254

,

Docket No. 50-265

.l

1

j

Enclosures:

1. Notice of Violation

2. Inspection Reports 50-254/97007(DRS); 50-265/97007(DRS)

)

L.

1

cc w/encis:

T. J. Maiman, Senior Vice President,

Nuclear Operations Division

'

4

,

D. A. Sager, Vice Presid6nt,

f

Generation Support

j

!

H. W. Kaiser, Chief Nuclear

Operating Officer

L. W. Pearce, Station Manager

-l

C. C. Peterson, Regulatory Affairs Manager

1. Johnson, Acting Nuclear Regulatory

Services Manager

.

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

J. R. Bull, Vice President, General &

Transmission, MidAmerican Energy Company

Distnbution:

Docket File w/encls

Rlli PRR w/encls

A. B. Beach, Rlil w/encls

PUBLIC IE-01 w/encls

SRis, Quad Cities,

Rill Enf. Coordinator w/encls

OC/LFDCB w/encls

Dresden, LaSalle w/encls R. A. Capra, NRR w/encls

DRP w/encls

TSS w/encls

C. D. Pederson, Rlll w/encls

DRS w/encIs

LPM, NRR w/encls

CAA1 w/encls

j

DOCUMENT NAME: G:\\DRS\\QUA97007.DRS

To emeelve a espy et thle document, indloate in the bos "C" = Copy w/o attach / enol "E" = Copy w/sttach/ enol *N" = No

j

oopy

,

OFFICE

Rill:DRS

v;

Rill:DRS

//

Rlll:DRP

Rill:DRS

V

,

NAME

NShah:jp g

TKozak p

WKropp y

MLeach ,@^

DATE

05/a /97

05/f( /97

05/r /97

05b 7/97

'

OFFICIAL RECORD COPY

i