Advises That Calculation Package Prepared to Evaluate Continued Need for Control Complex Ammonia Detectors,Per NUREG-0737,Item III.D.3.4.Util Will Remove Ammonia Detectors & Expects to Submit Tech Spec Change by 880429
ML20148B741
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/17/1988
From: Ken Wilson
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-3.D.3.4, TASK-TM 3F0388-11, 3F388-11, NUDOCS 8803220104
Download: ML20148B741 (2)


Text

,

e#9 O $$*,

.f G 0%.

i c

oo

  • A

$18

  • @<.o..o o'

e Florida Power CO R PO R AT 4 ON March 17, 1988 3F0388-11 U. S. Nuclear Regulatory M maion Attention: Docturent Control Desk Washington, D.C.

20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operatirg License No. DPR-72 NUREG 0737, It s III.D.3.4 Ccotrol Rom Habitability Removal of Amonia Detectors

Dear Sir:

y A calculation package was prtpared to evaluate the continued need for the CR-3 Control Cteplex Amonia detectors. 'Ihese th - nts were used !!o determine the maxinum concentrations which would be present in the control rocan in the event of a ccuplete rupturn of an 8500 pound capacity tank located at Crystal River Units 4 and 5.

'Ibe analysis took appropriate credit for the buoyancy. 'Ibe resulting height of the plume rise is a function of wind speed and distance between the source and receptor. In the evaluation, wird speeds were varied from int sec. -

/

7ng/sec. As wind increases, the plume rise is less. However, as the wind speed increases, the gas cloud W nore diffused with resulting icwer gas con ntrations. 'Ibe peak concentration is expected to be beteen 5.1 ng/md 3

and 12.4 ng/m. 'Ibe protective action limit, as given in Regulatory Guide 3

1.78 is 70 ng/m. 'Iberefore, the peak Control Otmplex conmntrations are well within the protective action limits without Corfcrol Otmplex isolation.

8803220104 880317 PDR ADOCK 05000302

\\ D P

DCD Post Of fice Bor 219

  • Crystal River, Florida 32629. Telephone (904) 795-3802 A Florida Progress Company

r, r

. 's

'l.

Hardi 17,1988 3F0388-11 Pege 2

'Iherefore, FPC is renoving the Ausnonia detectors and expects to subnit a technical specification diange with supporting analysis to you by April 29, 1988.

Sincerely, K. R. Wilson, Manager Nuclear Operations Licensing E/ nun oc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T. F. Stetka Senior Resident Inspector