ML20148B564

From kanterella
Jump to navigation Jump to search
Forwards LER 79-115/03L-0
Date released: 06/10/2020 Download: ML20148B564


/03L-0:on 791224,during Normal Operation, Containment Atmospheric Monitor Failed Downscale.Caused by Grounding of Power Supply by Bare Input Power Cable.Cable Was Repaired & Recorder Returned to Svc
ML20148B567
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/17/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20148B567 (1)
Forwards LER 79-115/03L-0
ML20148B560
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/17/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20148B560 (1)