Submits Addl Info Re Specific Welds for Which Inservice Insp Impractical During Initial 40-month Period.Flange Welds for RHR Shell Will Undergo Surface Exam.Calibr Stds Based on Uncladded Matl
ML20148B145
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/27/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 7810310089
Download: ML20148B145 (1)


Text

-_

~ g VruoINIA ELucrarc Axp Powru Cour My' e

Rio rix oxn,VI ROINI A 2 0 2 e1 October 27, 1978 Mr. Harold R. Denton, Director Serial No. 607 Of fice of _ Nuclear Reactor Regulation LQA/ESG:esh Attn: ' Mr. O. D._ Parr, Chief P0/KEB Light Water Reactors Branch No. 3 i-Division of Project Management Docket No.

50-338 U. S. Nuclear Regulatory Commission License No. NPF-4 Washington, DC 20555

Dear Mr. Denton:

By our letters, Serial Nos. 301/071477, dated August 9, 1977, and 480/101977, dated December 16, 1977, we provided the Staff with information concerning our planned inservice inspection program for the first 40-month period a t North Anna U,it No.1, and requested exemption f rom certain require-ments of ASME Section XI.

During several recent telephone conversations, including a conference call on'0ctober 19, 1.978, Messrs. A. W. Dromerick and M. R. Hum of the Staf f re-quested amplification of some points in our December 16 letter. The requested information is provided below.

Wi th reference to Attachment 1, page S5.90-5, paragraph (5), the specific welds for which complete inservice examination is impractical for the first 40-month inspection period are:

Weld No.

Figure 1

55 90-10 (VRA-152) 1 21 S5 90-6 (VRA-ll2) 1 S5.90-8 (VRA-138)

BC-i S5.90-13 (VRA-210)

BC-2 SS.90-14 (VRA-211)

BC-5 55.90-15 (VRA-212)

BC-7 S5.90-15 (VRA-212)

With reference to Attachment 1, page S5 90-11, Note 10, Vepco will supplement the volumetric examination of the residual heat exchanger shell to tubesheet flange welds with a surface examination.

With reference to Attachment 2, the calibration standards used for North Anna Unit No. 1 are not cladded.

We trust that the above information will permit you to complete your review of our initial inservice inspection program.

Very truly yours, f

0 9

C. M. Stallings 9 g~

l

~ %1()[jf, 00 f/ -

Vice President-Power Supply

~g and Productton.0perations 4

+ +