ML20148A876

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-213/88-02 on 880113-0229.No Violations Noted.Receipt of Providing Addl Info Re Compromise of safety-related,environ Qualified Equipment Ack.Matter Will Be Reviewed During Future Insps
ML20148A876
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/11/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20148A878 List:
References
NUDOCS 8803210216
Download: ML20148A876 (2)


See also: IR 05000213/1988002

Text

- - - - - - - _ - - _ - - - - - - - _ . - - - - - - _

_ - - - - - - _ - - - - - - - - - _ _ _ _ - - - - ,

t

iJ, .

.

..

MAR.11 1000

.

Docket / License: 50-213/0PR-G1

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Resident Inspection 50-213/88-02 (January' 13 - February. 29,1988)

This transmits the findings of the routine NRC inspection conducted by Mr.

J. T. Shediosky and Ms. A. A. Asars of the Haddam Neck Plant. These findings have

been discussed with Mr. D. B. Miller of your staff.

No violations were identified during this inspection and no reply to this letter

is required. We observed several areas of strong performance of your staff during

"

this inspection period. These areas included Radiological Protection during diving

evolutions associated with the Core Support Barrel Thermal Shield repairs, thorough

and comprehensive management review of Plant Information Reports on a daily basis,

and improved controls over security keycard accountability. These observations

are discussed in the enclosed report.

Thank you for your February 9, 1988 letter, as requested by NRC Inspection Report

50-213/87-27, which provided additional information regarding the compromise of

l safety related, environmentally qualified equipment. This matter will be reviewed

during future inspections.

Your cooperation with us is appreciated.

Sincerely,orisiaal % g,

'

.

.

Lee H. Bettenhaus ( ief

! ,

j

Projects Branch No. 1

l-

Division of Reactor Projects

l

Enclosure: NRC Region I Report 50-213/88-02

1

0FFICIAL RECORD COPY DL50-213/88-02 - 0001.0.0

03/10/88

1

8803210216 880311

DR ADOCK0500g3 ,

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ . _-___ _______ ____________ ____-_______________ _ _________ _-

~ s . ' ). ; - .

.

Connecticut Yankee Atomic Power Company 2 IIYIII

.

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

D. B. Miller, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR) '

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

W. Raymond, SRI, Millstone

A. Wang, LPM, NRR- ,

R. Bores, DRSS

C. Anderson, DRS

c

,

.

t

Y

RI:DRP RI:DRP i:ARP

Sh i' sky /meo McC be Bettenhausen

3/10/88 31 4 27 ld(Cb

!

0FFICIAL RECORD COPY DL50-213/88-02 - 0002.0.0 ,

l 03/10/88 .

!

,

. _ . , _ _ . , . . _ - , . _ . ~ . . , _ _ - , , _ . . _ _ , _ . . . _ . . _ , . . _ _ _ . _ , _ _ . . _ _ _ , . _ , . _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ , _ _ _ _ _