ML20148A661

From kanterella
Jump to navigation Jump to search
Forwards Interim Rept Re Prob W/Embed Assemblies Recently Detected.Deficiency Could Possibly Be Significant Per 10CFR50.55(e).Final Rept to Be Submitted Upon Completion of Tech Eval
Date released: 06/10/2020 Download: ML20148A661


Interim Rept.In Nov 1978,personnel Identified Embed Assemblies Not Fabricated or Installed IAW Design Drawing. Reeval of Affected Assemblies Is in Progress
ML20148A668
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/20/1978
From:
GEORGIA POWER CO.
To:
References
REF-PT21-79-175-000
Download: ML20148A668 (2)
Forwards Interim Rept Re Prob W/Embed Assemblies Recently Detected.Deficiency Could Possibly Be Significant Per 10CFR50.55(e).Final Rept to Be Submitted Upon Completion of Tech Eval
ML20148A656
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/20/1978
From: Ehrensperger W
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20148A656 (1)