ML20148A656

From kanterella
Jump to navigation Jump to search
Forwards Interim Rept Re Prob W/Embed Assemblies Recently Detected.Deficiency Could Possibly Be Significant Per 10CFR50.55(e).Final Rept to Be Submitted Upon Completion of Tech Eval
ML20148A656
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/20/1978
From: Ehrensperger W
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20148A661 List:
References
NUDOCS 7812290145
Download: ML20148A656 (1)


Text

. c x, g.,

<ms u, v,a 3 s'

r* :. I % t,'l',,

1.,

w.

ll. F. Diferisperger r

December 20, 1978 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 1217

REFERENCE:

230 Peachtree Street, N.W.

50-424 Atlanta, Georgia 30303 Vogtle 1 50-425 ATTENTION:

Mr. James P. O'Reilly Vogtle 2 Gentlemen:

A problem with embed assemblies was recently detected at the Vogtle Nuclear Plant - Units 1 & 2.

Based on our review of the problem, it could constitute a possible significant deficiency per 10CFR50.55(e).

In accordance with NRC regulation, we are submitting an interim report.

A final report will be submitted upon completion of the technical evaluation.

Very truly yours, 401.SGja W. E. Ehrensperce CWH:db Attachment xc:

U.S. Nuclear Regulatory Commission Attn:- John G. Davis, Acting Director Office of Inspection and Enforcement Washington, D.C.

20555(w/ Attachment) li. D. Hunt, NRC Region II (w/ Attachment)

\\S 78122901 k 9

i

\\l