a-.
^-
Duhe1%urr Company '
yg.pgys hicGuire tiudear Generatinn ikpartment g y e fyng,rit 12700Hagers FerryIkxid(SIG0lVP)
{riqprygy)
Huntersuue, NC21078510 (nyp?3.n,99yar DUKEPOWER
' April 30, 1997 l
Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
McGuire Nuclear Site Docket Nos. 50-369 and 50-370 Emergency Plan, Revision 97-1
Dear S r:
Enclosed for NRC Staff use and review is Revision 97-1 dated April 30, 1997, to the McGuire Nuclear Site Emergency Plan.
This revision is being submitted in accordance with 10 CFR 50.54(q) and does not decrease the effectiveness of the Emergency Plan.
A summary of the changes and bases for this determination is provided as Attachment 1.
1 By copy of this letter, two copies are being provided to NRC 1
Region II, Regional Administrator.
Very truly yours, i
H.B. Barro Vice President McGuire Site HBB:tsb Attachment f
g
)
9705080251 970430 PDR ADOCK 05000369 F.
. ~
U.S. Nuclear Regulatory Commission April 30, 1997 Page 2 l
i xc:
w/two cooies of attachments Mr. Luis Reyes, Regional Administrator U.S. Nuclear Regulatory Commission Region II 61 Forsyth St.,
SW, Suite 23T85 Atlanta, Georgia 30303 w/o attachment Victor Nerses U.S.
Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.
20555 NRC Resident Inspector McGuire Nuclear Station E.M. Kuhr (EC050)
Electronic Licensing Library (EC050)
EP File 1502 l
4
. - -. - l N
l 1
- .~
i l
ATTACHMENT 1 1
The revision is being submitted in accordance with 10CFR50.54(q) and does not decrease the cffectiveness of the Emergency Plan. The Plan as revised will continue to meet the requirements of 10CFR50.47 and 10CFR50. Appendix E.
I Synopsis of Changes Table of Contents Changes made in this section are editorial.
List of Figures Changes made in this section are editorial, j
Section B, On site Emergency Organization Duke Power has re-engineered the communications emergency plan to be more effective. New positions have been developed and are now included in Section B.8. As a result of the inclusion, information in Sections B.9 and B.10 have been renumbered and remaining pages in Section B have shifted.
Figure B-1, McGuire Nuclear Site minimum staffing requirements for emergencies has been revised as approved in the NRC safety evaluation dated 11/12/96 (TAC Nos. M92462 and M92463). The NRC determined the following changes do not decrease the level of on-site preparedness:
Eliminate the 45-minute communicator response.
Relax the core and thermal / hydraulic technical support response from 45 minutes to 75 minutes.
Reduce the minimum number of on-shift RP technicians from four to two.
Relax the response time of two RP technicians used for performing off-site radiation surveys from 45 minutes to 75 minutes.
Relax the response time of two RP technicians for access control, team coverage, personnel monitoring and dosimetry from 45 minutes to 75 minutes.
I
\\)
~.
I Revise I&E technician response to two personnel on-shift and two within 75 minutes.
]
Listing the local support response in the areas of firefighting and rescue operations / first-aid in the colurnn of 75-minute responders.
j Figure B-1 has also been reformatted, positions clarified, notes revised, and the EOF minimum j
staffing commitments 1: ave been included.
The Operations Engineering Liaison and TSC/OSC communication positions have been deleted from Figure B-2 as a result of re-engineering in the TSC and the addition of a video conferencing system between the TSC and OSC facilities.
Section C, Emergency Response Support and Resources Page C-2, Section C-3 has been revised to delete the use of Duke Power personnel and the emergency boat for lake warning purposes. This change does not relax lake warning capabilities but removes Duke Power personnel from assisting in evacuating Lake Norman. Letter to Duke Power Company dated March 21,1997, from North Carolina Department of Crime Control and Public Safety, Division of Emerger.cy Management (see Attachment 2) states Annex G of the Nonh Carolina Emergency Response Plan has been revised to reflect the sole use of the State of North Carolina and the cour. ties of Mecklenburg, Iredell and Catawba to provide 100% warning capability. Lake evacuation must be performed by certified law enforcement. Use of Duke Power personnel to facilitate evacuation is no longer an option. As stated in the letter, revised Annex G has been tested and evaluated by FEMA with no problems identified.
Section D, Emergency Action Levels Editorial changes were made to Section D pages as follows:
Pages D-17,27,28,36,55: Capitalized trw.. designations for EMPs 51 A and SIB and clarified numericallimits Pages D-39,80,82: Added low range indication (L) to certain EMFs for clarification because they have dual ranges Page D-42: Added closure parenthesis to previously unclosed parenthesis Page D47: Corrected for consistency Pages D-55,93,101,104: Corrected typographical error Page D-70: Incorporated existing note into initiating condition 2
i Pages D-73,76: Changed praedural reference Pages D-80,81,82,83: Under!ined header for emphasis i
Page D-83: Added qualifying statement for consistency with other EAL initiating conditions 4
Section E, Notification Methodology 1.
A new document management system has been adopted to standardize McGuire i
procedures. As a result, procedure numbers have been changed. The following pages and section numbers contain the revised procedure numbers:
Pages E-1 and 2 Section E.2.a j
Pages E-2,3 and 4 Section E.2.b i
Pages E-5 and 6 Section E.2.c Pages E-6,7 and 8 Section E.2.d 1
l 2.
The North Carolina Emergency Operations Center (EOC)is now staffed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, 7 days a week. The State of North Carolina has requested initial emergency notifications be through the EOC rather than the State Warning Point. As a result, the following pages and sections were revised to reflect the North Carolina Emergency Operations Center:
Page E-1 Section E.2.a l
Pages E-3 and 4 Section E.2.b i
Page E-5 Section E.2.c Page E-7 Section E.2.d i
3.
Page E-8, Section E.2.c has been revised to reflect recommendation of off-site authorities 2
to evacuate the two-mile radius and all affected zones five miles downwind and in-place I
sheltering for remainder of the 10-mile EPZ not evacuated. Protective Action Guides l
were adopted from EPA 400-R-92-001 and are shown in Figure J.l. Section E.2.c was l
not revised when EPA 400 was implemented in Section J of the McGuire Emergency l
Plan.
3
_m._
s i..
i Section F, Emergency Communications 1.
A new 800 megahertz radio system has been installed and is utilized for communications between the TSC, EOF and radiological monitoring tear.s. The existing radio system is i
still utilized for communication among counties, Contr Room,TSC and EOF. Sections F.1.b and F.1.d were revised to reflect the above changes.
]
2.
Page F.3, Section F.2: Deleted " telephones". This is an editorial change.
3.
Figures F-1 and F-2 were revised to reflect radio communications between the state and t
counties.
I 4
k Section G, Public Education and Information l
1.
Page G-1, Section G: This section was added to make the McGuire Emergency Plan
{-
consistent with the Oconee and Catawba plans.
L l
2.
Page G-1, Section G.1/G.2: Minor editing occurred in this section. The wording is now l
consistent between all Duke nuclear sites. A specific mention is made in this section to l
the location oflake warning signs and refers to Figure G-2.
3.
Page G-2, Section G.3.a: Duke Power has rc<ngineered the communications emergency
{
plan to be more effective. New positions have been developed (shown in Section B).
The thrust of the new plan will provide for the capability of responding to media initially l
at the nuclear site visitor center. Additionally, ajoint information center will be activated j
in downtown Charlotte to respond to media phone calls, rumor calls, response by the county and state public spokespersons. The public Spokesperson will have the authority l
to approve information being released to the media and to the public.
i j
4.
Page G-2, Section G.3.b: Eliminated the first two paragraphs under media. This information is stated in other areas and is no longer needed.
Information in the area under media has been restructured to coincide with the new l
emergency plan. Two spokespersons may be utilized during the initial stages of an
]
emergency; one at the nuclear site and one in the EOF.
1 5.
Page G-3, Section G.4.a: The plan was revised to indicate that news conferences would i-be held at the Media Center but informal standup interviews would be the practice at the i
visitor center. The Senior Vice-President for Nuclear Production is also listed as a Public
{
Spokesperson.
l 6.
Page G-3, Section G.4.b: The communications emergency plan requires coordination j
between the EOF News Manager and the Public Information Manager for the establishment of the news conferences.
1 i
<.j-4 i
- =. _ -. -. - -. -. - - -.
4 4
i 7.
Page G-3, Section G.4.b: Revised the wording to indicate that the Duke Power representative going to the counties and state will act as a liaison to assist in clarifying j
information provided by Duke Power.
8.
Page G-3, Section G.4.b: Moved the description of the Communications & Community j
Relations Emergency Response Organization to Section B.
l 9.
Page G-3, Section G.4.c: The Government Agency Liaison will now be the person in the organization to work with state and county Public Information Officers to acknowledge j
rumors and determine their origin.
1[
10.
Page G-3 and G-4, Section G.4.c: The Duke Power Customer Service Center will be j
responsible for fielding calls from the public once the phones from the visitor centers are switched to the Customer Service Center. This section provides information relative to how the process will be handled.
I1.
Page G-4, Section G.4.c: Wording for Employees, Elected Officials, Industry Groups and Regulators was simplified and is consistent at all the Duke nuclear sites. Information on the Catawba Owner's Group was eliminated from the Emergency Plan but was included in the Joint Information Center procedure as a requirement for action by the Public Information Manager.
12.
Page G-4, Section G.5: Minor editing has occurred in this section. The wording is now consistent beiveen all the Duke nuclear sites.
13.
Page G-4, Section G.di: The News Group Activation section was deleted because the activation process is orJined on the organization chart as shown in Section B.
14.
Page G-5: Updated to the 1997 McGuire Nuclear Site calendar 15.
Page G-8, Figure G-2: Revised format and updated position titles Section H, Emergency Facilities and Equipment
- 1.
Page H-2, Section H.I.c: Deleted "in the Work Control area." The Work Control area has been relocated. The OSC is now a dedicated facility.
2.
Page H-8, Figure 11-1: Revised center table layout 3.
Page 11-9, Figure H-2 Revised layout of OSC Coordinator table 5
j i,
Section I, Accident Assessment 1.
Page I-1,Section I.1: Revised procedure number as a rr.,lt of new document management system.
2.
Page I-1,Section I.2.c: The description of the use r Silver Ziolite was revised to agree with the Site Radiation Protection Plan.
3.
Page I-2,Section I.3.a/I.3.b: Deleted reference to procedure HP/0/B/1009/05. This procedure was deleted in the 96-1 Emergency Plan revision dated 4/22/96.
i l
l 4.
Page I-3,Section I.7/I.8: This section was revised to delete the Control Room. The communication loop between TSC, EOF and radiological monitoring teams no longer l
includes the Control Room. This section also reflects the state will be able to relay field momtoring results to county locations.
i 5.
Page I-3,Section I.9: Revised paragraph to show a single channel analyzer is used for measuring radioiodine concentrations in the EPZ instead of a multi-channel system.
q Section J, Protective Response 1.
Pages J-l and J-2, Sections J.l.a-d, J.2 and J.5: Containment evacuation was added to the title of RP/0/A/5700/011 and the procedure number was revised as a result of the document management system change.
2.
Page J-1, Section J.3: Changed construction to contract. This is an editorial change.
i 3.
Page J-3, Section J.7: Revised the statement to reflect a computer based dose projection j
model is used for dose projection as opposed to plant procedures.
I Section K, Radiological Exposure Control i
1.
Page K-1, Section K.3.a: Revised to show record keeping for exposure to personnel l
involved in a radiological accident is now performed in the Operations Support Center instead of the Technical Support Center.
i 2.
Page K-1, Section K.3.a: Added "and/or Mule ple". This is an editorial change.
)
3.
Page K-1, Section K.3.b: Revised to show record keeping for exposure to personnel i
involved in a radiological accident is now performed in the Operations Support Center
{
instead of the Technical Support Center.
}
4.
Page K-2, Section K.S.b: Added "of personnel". This is an editorial change.
t l
J i
6 2
__... _ _ _. _ - _ _ _. _. _ _ _ _ _ _ _ _ _ _. ~ _.. _ _. _ _ _ _ _. ~. _ _. _ _ _ _ _
f i +.
i l
Section M. Recovery and Reentry Planning and Postaccident Operations 1.
Page M-1, Section M-1: Added a statement to reflect procedural guidance has been j
developed for recovery and reentry operations.
l 2.
Pages M-3,4,5,6, Sections M.2, M.3, Figures Mi and M2: Revised to reflect a position title change from News Director to News Manager. This is an editorial change.
1 i
Section P, Responsibility for the Planning Effort i
1.
Page P-1, Section P.5: Deleted " Chairman of the". This is an editorial change.
2.
Page P-2, Section P.9: Change " Quality Verification Department" to Nuclear Assessment and Issues Division". This is an editorial change.
3.
Page P-3, Section P.10: Revised to reflect telephone numbers are now located on the online organization chart.
4.
Page P-5, Figure P-2: Editorial changes to reflect new procedure numbers and titles.
5.
Page P-6, Figure P-2: Editorial changes to reflect new procedure numbers and titles.
6.
Page P-9, Figure P-3: Editorial changes to revise the Emergency Plan Implementing Procedures distribution list.
Section Q, Appendices 1.
Page Q-1, Appendix Index: Added Hazardous Mate rials Response Plan as Appendix 9 2.
Page Q-5, Appendix 2, Meteorological Program, Effluent Dispersion Model: Editorial change which revised " Class A" to computer model.
3.
Pages Q-5 and Q-6, Appendix 2, Meteorological Program, Dose Assessment Methodology: Revised to show the Dose Assessment Methodology used is now the computer model Raddose-V.
4.
Page Q-6, Appendix 2, Meteorological Program, Physical System
Description:
Revised to describe the Raddose-V program.
5.
Page Q-7, Appendix 2, Meteorological Program, Operator Aid Computer (OAC) to Distributed Data Processor (DDP): Editorial change which revised " Class A" to computer model.
7
4 O
4 1
6.
Appendix 5, Agreement Letters #1-14: Affixed label " Agreement Letter #._" on each.
This change will facilitate updating.
Appendix 5, Agreement Letter #15: Replaced INPO Agreement Letter dated January 31, 1996 with letter dated January 31,1997 and affixed label " Agreement Letter #15".
1
)
Appendix 5, Agreement Ixtter #16: Affixed label " Agreement Letter #16" to facilitate updating.
Appendix 5, Agreement Letter #17: Replaced EPA 400 Implementation Agreement s
Ietter dated March 17,1994, with letter dated December 6,1996 and affixed label f
" Agreement Letter #17".
Appendix 5, Agreement Letter #18: Replaced Northeast Utilities Service Company Agreement Letter dated May 4,1993, with letter dated August 9,1996 and affixed label l
" Agreement Letter #18".
i 7.
Page Q-16, Appendix 6: Editorial changes to revise the Emergency Plan distribution list.
8.
Page Q-17, Appendix 6, Number: Editorial changes to revise the Emergency Plan distribution list.
i 9.
Page Q-18, Appendix 6, Number (15): Revised to reflect the new address for the NRC l
j 10.
Page Q-18, Appendix 6, Number (23): Revised to delete name of the director and to i
update the address 11.
Page Q-19, Appendix 6, Numbers (29), (30, (31), (32), (33): Revised to reflect titles rather than names in the positions i
i 4
l l
4 4
)
l 8
l
ATTACHMENT 2 l
l North Carolina Department of Crime Control and Public Safety Division of Emergency Management James B. Hunt Jr., Governor Richard II. Moore, Secretary March 21,1997 Ms. Becky IIasty, Emergency Planning McGuire Nuclear Site Huntersville, North Carolina 288078
Dear Ms. Hasty:
Several years ago the McGuire Task Force Lake W rning Project Team reviewed the capabilities of the State of North Carolina and the Counties ofMecklenburg, Iredell and Catawba, to provide 100% warning capability for Lake Norman and the Catawba River in the event of an accident at McGuire. The purpose of this review was to remove any responsibility from Duke Power for evacuation of the lake and river. Use of Duke Power personnel to facilitate evacuation is a problem because they are not certified law enforcement.
Ofr-site law enforcement epJes are now able to carry out this function due to changes in the lake patrol capability of the 9 affs departments. The agencies responsible for this function are Charlotte /Mecklenburg Police Department, Iredell Sheriffs Department, Nonh Carolina Wildlife Resources Commission - Enforcement Division, and the Catawba County Sheriff s Department.
We hope to invoive :he Lincoln County Sheriffs Department and Mecklenburg Parks and Recreation in the fuiu.e.
The committee revised Annex G to the McGuire Emergency Response Plan to reflect the sole use oflaw enforcement personnel. The revised Annex G has been tested and evaluated by FEMA.
No problems have been identified.
I understand that the Emergency Planning Group at McGuire Nuclear Site has been retaininj; a boat for Lake Warning. After review of the current plans, and because of the above mentioned changes, I do not believe Lake Warning suppon from McGuire is still needed.
Should you need any further clarification or assistance on this issue, please contact Mike Cook in the Area E Office at 704-466-5555.
Sincere,
Eric Tolbert Director cc:
Tim Miller, Area "E" Coordinator 3.S..- I o eK C.%.,-A h Mike Cook, Area "E" REP Planner
%41g w,
116 West Jones Street
- Raleigh, North Carolina 27603-1335
- Telephone (919) 733 3867 An Equal Opportunity / Affirmative Action Employer e
10 CFR 50.54 (a) INITIAL SCREENING CHECKLIST O N/A EPlan Section No.:
Annual Review Deletion?
O YES INO TN/A EPIP No.:
Deletion?
O YES O NO Q'N/A Other Document /:
Deletion?
O YES O NO Form No.
Title of Document: McGuire Nuclear Site Emeraency Plan Procedure Change No. N,/A Revision No.: RZ-1 Synopsis of Change:
Synoosis Attached N
YYES O NO 1.
Is the change to any section of the EPlan?
O YES Q'NO 1.
Is the change to an EP!P which will require a revision to any section of the EPlan?
l 0 YES YNO 1.
Is the change to any other emergency related procedure or form which will require a revision to any section of the EPlan?
If YES is checked for ANY of the three questions, complete this 10 CFR 10.54 (q) Initial Screening Checklist, AND complete a full 10 CFR 50.54 (q) Review Checklist.
If NO is checked for ALL three questions, complete this 10 CFR 50.54 (q) Initial Screening Checklist only. A full 10 CFR 50.54 (q) review is NOT REQUIRED. The procedure change should be marked appropriately indicating that the change does not decrease the effectiveness of the EPlan, and processing should continue.
A full 10 CFR 50.54 l} Review hec its? YlS OR O IS NOT REQUIRED.
/30/9 7 Performed By-I Date;
/IO fI Reviewed By:
/~
k Date:
(/
Signature Emergency Planning Manager:
- />#Ma AYIr Date: YbA/77 Signatu're
/
I m
I DUKE POWER COMPANY McGUIRE NUCLEAR SITE 10 CFR 50.54 (q) REVIEW t
l
Purpose:
Determination of a decrease in the effectiveness of the Emergency Plan in accordance with 10 CFR 50.54 (a)
Plan
Title:
Procedure
Title:
l McGuire Nuclear Site Emergenc" Plan N/A Procedure No:
N/A Revision No.:
97 1 l Effective Date:
4/30/97 f
10 CFR 50.47 (b) Review l
Does this change relax commitments regarding the following subject areas of 10 CFR 50.47 (b)?
1.
Assignment of ERO responsibilities
[ Yes 2'No 2.
Assignment of onshift ERO personnel Yes
-'No 3.
Arrangement for utilizing State or local resources and staff Z Yes L'No l
4.
EALs E Yes L%o 5.
Notifications to offsite agencies. the ERO or the public
[ Yes
-'No 6.
Communications between offsite agencies. the ERO, or the public j
7.
Dissemination of public information Yes
-Ho Yes LHo j
1 8.
Adequacy of emergency facildies and equipment Yes L@o 9.
Methods. systems, and equipment for offsite response to a radiological emergency Yes s'No
- 10. Protective Action Recommendations / Determination Yes
-to 1
- 11. Emergency Worker radiologicalinjured personnel Yes Lto
- 12. Medk:al services for contamination injured personnet Yes 2'No i
- 13. Re-entry / Recovery plans
[ Yes
-'No j
- 14. Drills and exercises Yes ito
- 15. CiJological emergency response training Yes
-to
- 16. Plan development, review and distribution
[ Yes 2'No l
10 CFR 50. Appendix E Review l
Does this change relax commitments regarding the following subject areas of 10 CFR 50, Appendix E?
l (i)(ii)(iii) Emergency plans as described in the FSAR E Yes
-"No
}
(iv) A. Organization for coping with radiological emergencies
[ Yes Lto (iv) 8. Assessment of radiological emergencies
[ Yes
-to (iv) C. Classif catioris. EALs and ERO activation Z Yes Lto (iv) D. Notification of Federal. State and Icoal agencies and the public Z Yes 2'No a
(iv) E. ERFs. equipment.and communications Yes E'No j
(iv) F. Training drills, and exorcises
[ Yes 2'No j
(iv) G. Plans and procedures and surveillance of equipment and supplies Yes 2'No j
(iv) H. Re-entry and Recovery following an accident E Yes L'No Determination per 10 CFR 50.54 (q)
Does this change decrease the effectiveness of the Emergency Plan? (11 *(es", then the change O Yes
@ho shall not be implemented without prior NRC approval)
Remarks Documentation of Review and Approval Review Completed By (Signature):
g Date:
Approved By- (Signature)
&, bear, 1 A A th'o,/97 Date:
g 2
o i
i
}
i 4
i April 30,1997 4
3 l
i MEMORANDUM 4
i To:
All Holders of the McGuire Emergency Plan i
I,
Subject:
McGuire Emergency Plan Enclosed please find Revision 97-1 to the McGuire Nuclear Site lin;ergency Plan. Refer to Attachment I to complete the revision to the manual.
j If there are any questions, please call me at 704/875-4662.
l Sincerely, 0 LI BeckyI asty i
Emergency Planning Manager McGuire Nuclear Station l'
RLH/tsb 3
i
Attachment:
Emergency Plan Revision 97-2 l
cc:
EP File 1502 1
I u
4 f
)
April 30,1997 Page 2 1
j SELILQN REMOV.E.PAGES INSERT PAGES j
Coversheet Revision 96-2 Revision 97-1 Table of Contents 1 through 6 1 through 7 j
List of Figures 1
1 I
Section B B-3 through B-13 B-3 through B-15 l
Section C C-2 C-2 i
j Section D D-1 through D-107 D-1 through D-107 D-1 through D-4 D-1 through D4
}
Section E E-1 through E-9 E-1 through E-9 Section F F-1 through F-5 F-1 through F-5 3
Section G G-1 through G-8 G-1 through G-6 Section H H-2 H-2 4
H-8 H-8 H-9 H-9 t
j Section I I-l through I 3 I-l through I-3 1
l Section J J l through J-3 J-l through J-3 1
l Section K K-1 through K-2 K-1 through K-2 i
Section M M-1 through M-6 M-1 through M-6 l
Section P P-1 through P-3 P-1 through P-3 i
P-5 through P-6 P-5 through P-6 3
P-9 P-9 i
4 1
2 J
e i
_ _ _.... _.... _.., _ _ _ _. _ _ _ _ _. _ _ _ _. _. _ _ =.
._...___._._.____m.
e i
l Attachment I April 30,1997 Page 3 j'
SECTION REMOVE PAGEC INSERT PAGES
)
l Section Q Q-1 Q-1 1
1 Appendix 2:
Q-5 through Q-7 Q-5 through Q-7 Appendix 5:
Agreement Letters 1 - 19 Agreement letters 1 - 19 I
Appendix 6:
Q-16 through Q-19 Q-16 through Q-19 Appendix 7:
Revision 5 Revision 6 Appendix 8:
Revision 4 Revision 5 Appendix 9, Haz, Mat. Response Plan and tab l
.