s OPERA 11NG DATA REPORT DOCKET 50-369 DATE 3-15-E8 OPERATING STATUS COMPLETED BY J. A. Reavis TELEFHONE 704/373-7567
- 1. Unit Nane: McEUIRE 1
- 2. Reportirg Feriod: FESPUARY 1, 1983-FEERLARY 29,1988
- 3. Licensed Thersal Power (MWt):
3411
- 4. Naseplate Rating (Srcss MWe):
1305*
I Notes 'Nueplate Fating I
- 5. Design Electrical Rating (Net MWe):
1190 I (Gross MWel calculated as I
- 6. Marious Dependable Capacity (6 toss FWe):
1 1450.000 M/A x.90 power i
- 7. Maxists Dependable C4;iacity (Net Mde):
1129 I facter per Page iii, I
- 8. If Changes Occur in Capacity Ratings (Iteos Nusber 3 Thrcugh 7) Since Last i NURES-0020.
I Feport. Give Reasons:
I I
- 9. Power Level To Which Festricted, if Any (Net MWe):
- 10. Feasca for Restricticns, If any:
This Month Yr.-to-Date Caulative
- 11. Pours In,eporting Peried 696.0 1,440.0 54,768.0 c
- 12. N;sber Of Hours Feactor Was Critical 696.0 1,425.4 38,289.0
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hoars Generator On-Line 696.0 1,422.8 37,766.0
- 15. Unit Peserve Shutdown Hours
--0--
--0-- -
- 16. Gross Thersal Energy 9ererated (MWH 2,314,778 4,694,677 109,764,256
- 17. Gross Electrical Erergy Generated (MwH) 801,294 1,631,087 33,027,244
- 18. Net Electrical Energy Eecerated (MW4) 773,164 1,572,702 36,239,200
- 19. Unit Service Factor 100.0 9B.8 69.0
- 20. Unit Availability Factor 100.0 98.8 69.0
- 21. Unit Capacity Factor (Using MC Net) 99.4 96.7 56.6
- 22. Unit Capacity Facter (Usirg DER Net) 94.1 92.6 56.1
- 23. Unit Forced Datage Rate 0.0 1.2 12.6 2% Shutdont.s Scheduled Over Next 6 Months (Type, Date, and Durition cf Eact):
......U9_M___.._______........_...............__..............___.......................__...______.....__..............
- 25. If Shut Dent: At End Of Report Period. Estinated Date of Startupt.,_,____ ___,...,_._._,___ ______,______.,_ _______,,_.
- 26. Units in Test Status (Frier to Coesercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CC","E C IAL CFEPAT10h
&V 8803180103 880229
, i
//
1 PDR ADOCK 05000369 R
DCD 1
b AVERASE DAILY UNIT POWER LEVEL DOCKET NO.
50-369 LINii McGuire !
D4TE March 15, 1968 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 MNTH FEBRUARY,1955 DAY AVERASE DAILY POWER LEVil DAY AVERAGE DAILY POWER LEVEL (KWE-Net)
(MWE-Net) 1
!!34 17
!!37 2
634 18 1136 3
851 19 1136 4
!!45 20 1134 5
1138 21
!!35 6
1134 22
!!39 7
1135 23 1147 B
!!3d 24
!!41 9
1134 25 1140 10 1132 26
!!41 l
11 1136 27 1141 12 i!43 28 1140 13 11 3 29 1141 14
!!39 i
I 15 1139 1
t l
16 1137 t
l L
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME _MGGUlRE_1________l DATE _Q3L15L8@_______
REPORT MONTH ____ February _19@8_
COMPLETED BY _Q._A _REAVIS__;__
z TELEPHONE _12Q4)--323-25_62___
(1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE 1
N Y
S SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 11 p 88 2 F
A HG ZZZZZZ HI SODIUM IN SECONDARY SYSTEM 12 p 88 2 F
B IE INSTRU NUCLEAR INSTRUMENTATION CALIBRATION l
13-p 88 2 F
A HG ZZZZZZ HI SODIUM IN SECONDA9Y SYSTEM J
l (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G-Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data:
B-Maintenance or test 2-Manual Scram Entry Sheets For Licensc C-Refueling 3-Automatic Scram Event Report (LER) d D-Regulatory Restriction 4-Other (Explain)
File (NUREG-Ol61) i E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain, Exhibit I - Same Scurce H-Other (Explain)
DOCKET No:
50-369 UNIT:
McGuire 1 DATE:
03/15/88 NARRATIVE
SUMMARY
Month: February 1988 McGuire Unit 1 began the month of February operating at 100% full power. At 0605 on 2/02, the unit began decreasing power due to high Secondary Side sodium levels. The unit held power at 50% for Nuclear Instrumentation Calibration, then continued decreasing power. The unit reached 30% power at 1538 on 2/02, where it remained until 0315 on 2/03, at which time it began increasing power.
The unit returned to 100% power at 1446 on 2/03, where it operated for the remainder of the month.
- v 1
+
MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire, Unit 1 2.
Scheduled next refueling shutdown: October, 1988 3.
Scheduled restart following refueling:
December, 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
dumber of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
293 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: March 15, 1988 Name of
Contact:
J. A. Reavis Phone:
704-373-7567 1
l
OPEFATIRS DATA FEF0RT DOCKET 50-370 DATE 3-15-98 OPERATINS STATUS COMPLETED Bf J. A. Reavis
=-
TELEPHONE 704/373-7567
- 1. Unit Nase: Pc6UIRE 2
- 2. Reporting Period: FEBRUARY 1. 1953-FEBPUARY 29,1988
- 3. Licensed Thereal Power (MWt):
3411
- 4. Naeeplate Rating (Bross MWe):
1305*
I Notes #Naseplate Rating l
- 5. Design Electrical Rating (Net MWe):
!!80 I (Gross MWe) calculated as 1
- 6. Maxisus Dependable Capacity (Bross MWe):
1 1450.000 MVA x.90 power i
- 7. Marisus Iependable Capacity (Net MWe):
!!29 I factor per Page tii, I
- 8. If Changes Occur in Capacity Ratings (ltens Nueber 3 Through 7) Since Last i NURES-0020.
I Report. Give Reasons:
I I
.-_-9. Power Level To Which Festricted, If Any (Net PWe):
- 10. Reason For Restrictions, If any:
This Month Yr.-to-Date Cusulative
- 11. Hours In Repcrting Period 696.0 1,440.0 35,064.0
- 12. Nusber Of Hours Reactor Was Critical 696.0 1,422.1 25,868,0
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 10. Hours Generator On-Lire 696.0 1,417.2 25,244.5
- 15. Unit Reserve Shutdenn Hours
--0--
--0--
--0--
- 16. Gross Thereal Energy Generated (MWH) 2,372,171 4,743,107 81,983,058
- 17. Gross Electrical Energy Gererated (MWHi 829,158 1,659,429 29,735,232
- 18. Net Electrical Energy Generated (M4H) 800,043 1,599,429 27,535,431
- 19. Unit Service Factor 100.0 98.4 72.0
- 20. Unit Availability Factor 100.0 98.4 72.0
- 21. Unit Capacity Factor (Using MIC Net) 101.8 98.4 67.5
- 22. Unit Capacity Factor (Using CER Net) 97.4 94.1 66.6
- 23. Unit Forced Datage Rate 0.0 1.6 14.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duraticn of Each):
.....R.e..f.u.e..l.i. nR.....M.a. Y.. 2 7..,. 1. 9 8 8.... 10..W..e.e..k.s......................................................................
- 25. If Shut Down At End Of Report Period. Estisated Date of Startus:._,___,,,,,,..................
- 26. Units in Test Status (Frior to Costercial Operatien):
Ferecast Achieved INITIAL CRITICAllTY INITIAL ELECTRICITY COMPERCIAL OFERATICN 1
I i
AVERAGE DAILY UNIT F0VER LEVEL DOCKET NO.
50-370 UNIT McGuire 2 DATE March 15, 1988
=.......
COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 MONTH FEBRUMY,1929 DAY AVERASE DAILY POWER LEVEL DAY AVERAGE DAILY POWER.EVEL (MWE-Net 1 (MWE-tst) 1 1153 17
!!45 2
1152 18 1147 3
1150 19 11i9 4
1154 20 1149 5
!!48 21 1149 6
1148 22 1147 7
1149 23 1155 l
8 1153 24 1148 9
1149 25 1150 10 1149 26 1152 11 1150 27 1152 12 1153 28 1151 13
!!49 29 1151 14 1147 15
!!45 16
!!45 l
L
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
_59:32Q___________
UNIT NAME MCGUIRE 2 DATE [Qh2[62hh(((((((([
REPORT MONTH ____ February _1988_
COMPLETED BY _J._A._REAVIS__1__
TELEPHONE _12Q4):323:2562___
(1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO l
DATE E
HOURS
' N R/X NO.
CODE.
CODE PREVENT RECURRENCE l
I I
I l
l NO SHUTDOWNS OR RED UCTIONS (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G-Instructions S Scheduled A-Equipment Failure (Explain) 1-Menual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For License C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Res'riction 4-Other (Explain)
File (NUREG-Ol61)
E-Operator Training & License Examination F-Administrative (5) l G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
DOCKET NO:
50-370 UNIT:
McGuire 2 DATE:
03/15/88 NARRATIVE
SUMMARY
Month:
February 1988 McGuire Unit 2 operated at 100% full power for the entire month of February.
q:
MONTHLY REFUELING INFORMATION REQUEST
-1.
Facility name: McGuire, Unit 2 2.
Scheduled next refueling shutdown:
May, 1988
.3.
Scheduled restart following refueling: July, 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes,' what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool: 449 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 I
I I
i l
DUKE POWER COMPANY DATE: March 15, 1988 Name of
Contact:
J. A. Reavis Phone:
704-373-7567 l
l l
l
a t
4 0FERATING DATA REFORT
- REVISION 1 DOCKET 50-370 DATE 2-15-09 OPERATING STATUS COMPLETED BY J. A. Reavis TELEPHONE 704/373-7567
- 1. Unit Nase: McGUIRE 2
- 2. Reporting Period: JAN'JARY 1, 1989-JANUARY 31,1989
- 3. Licensed Thersal Power (MWt):
3411
- 4. Naseplate Rating (Gross FWe):
1305*
i Notes *Naseplate Rating I
- 5. Design Electrical Rating (Net Mde):
1190 1 (6 Toss MWe) calculated as I
- 6. Maxieus Dependable Capacity (Bross MWe):
1 1450.000 MVA x.90 power i
- 7. Maxieue Dependable Capacity (Net MWe):
1129 1 factor per Page iii, I
- 8. If Changes Occur in Capacity Ratings (Itess Nuster 3 Through 7) Since last i NURE9-0020.
I Report. 6iye Reasonsi,,,............................_,...................
I i
- 9. Power Leve1 io Wiich Restritted, If Any (Net MWe1
!0. Reason For Restrictions, If any........,.............................................................................
This Month Yr.-to-Date Cumulative
- 11. Hours la Reporting Feriod 744.0 744.0 34,368.0
- 12. Nesber Of Hoers Feactor Was Critical 726.1 726.1 25,172.0
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hoars Generator On-line 721.2 721.2 24,548.5
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thereal Energy Generated (MW) 2,375,936 2,375,936 79,615,097
- 17. Gross Electrical Energy Generated (M M 830,271 83),271 27,906,074
- 18. Net Electrical Erergy Eenerated (Mmi) 799,3S6 799,336 26,735,328
- 19. Unit Service Factor 96.9 96.9 71.4
- 20. Unit Availability factor 96.9 96.9 71.4 s
\\
- 21. Unit Capacity Fatter (Using MDC Net) 95.2 95.2 66.9
- 22. Unit Capacity Factor (Using DER Net) 91.1 91.1 65.9
- 23. Unit Forced Outage Rate 3.!
3.1 14.6
- 24. Shutdenns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 23. If Shat Down At Erd Of Repor t Feriod. Estina t e d Da t e o f S t ar tup s.,_
- 26. Units In Test Status (Prior to Costercial Operation):
Forecast Achieved IN!ilAL CRITICAllTV INITIAL ELECTRICITY COMMERCIAL CFERATICN
~_..
y o-v
.McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT 1.
Personnel' Exposure For the month of January, no individuals exceeded 10 percent of their-allowable annual radiation dose limit.
2.
The total station liquid release for January has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for January has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
I J
l l
l l
l
.,i l*
DUKE POWER GOMPANY P.O. BOX 33180 CllAltLOTTn, N.C. 98949 HALB.TUGMER rat.spesons WK3 PaksaDENT (704) GN831 stuaam Paoorceson March 15, 1988 U. S. Nuclear. Regulatory Commission Attention:
Document Control Desk Washington, D. C.
20555 Re: McGuire Nuclear Station Docket No. 50-369 and 50-370
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of February, 1988. Also attached-is a corrected copy.of the Operating Data Report for McGuire Unit 2 for the month of January, 1988.
Very truly yours, 44-l Hal B. Tucker JAR /7000/sbn Attachment.
xc:
Dr. J. Nelson Grace American Nuclear Insurers Regional Administrator / Region II c/o Dottie Sherman, ANI Library U. S. Nuclear Regulatory Commission The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, CT 06032 Mr. Phil Ross INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 Circle 75 Parkway Washington, D. C.
20555 Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Mr. Richard G. Oehl, NE-44 Office of Nuclear Reactor Regulation U. S. Department of Energy U. S. Nuclear Regulatory Commission 19901 Germantown Road Washington, D. C.
20555 Germantown, Maryland 20874 Mr. Robert G. Rogers Mr. W. T. Orders Nuclear Assurance Corporation NRC Resident Inspector 6251 Crooked Creek Road McGuire Nuclear Station
\\\\
Norcross, Georgia 30092