ML20147J446

From kanterella
Jump to navigation Jump to search
Forwards LER 97-017-00,describing Violation of Plant TS
Date released: 06/10/2020 Download: ML20147J446


:on 920508,containment Third Door Was Blocked Open During Refueling Operations.Caused by Interpretation That Movement of Core Components Per TS Definitions Rather than Literal Wording.Routine Maintenance Procedure Revised
ML20147J449
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/01/1997
From: Flentje F
WISCONSIN ELECTRIC POWER CO.
To:
References
Download: ML20147J449 (4)
Forwards LER 97-017-00,describing Violation of Plant TS
ML20147J442
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/01/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20147J442 (1)