Submits Summary Evaluation of Items Addressed in Final Fire Rept Submitted on 880114 & Identified in NRC SER Transmitted by as Part of Insp Rept 50-267/87-32.Items Addressed Include Hydraulic & Control Room Ventilation Sys
ML20147H662
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/29/1988
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
TAC-66365, NUDOCS 8803090032
Download: ML20147H662 (3)


See also: IR 05000267/1987032

Text

'

m

V

L

(

Oc~C.

.

'

/p ua

k

,

'o

UNITED STATES

~ , ,

!

NUCLEAR REGULATORY COMMISSION

g

j

,

-E

WASHINGTON, D. C. 20555

g

February 29. 1988

....+

l

,

Docket No. 50-267

l

Mr. R. O. Williams. Jr.

Vice President. Nuclear Operations

i

PLblic Service Company of Colorado

Post Ottice Box 840

'

Denter Colorado. 80201-0540

3

'

Dear Mr. Williar.s:

SUBJECT:

REVIEW 0F FINA!. FIRE REP 0AT - FORT ST. VRAlh (TAC NO. 66365)

We have completed our review of your Final Fire Report', submitted by letter

dated January 14. 1988 (P-88016). This letter provides a sumary evaluation of

the items adoressed in your report that were to be submitteo following plant

,

restart. These items were identified in the staff's Safety Evaluation

transmitted to you by' letter dated January 28, 1988, as part of Inspection

'

Report 50-267/87-32. Specific topical areas are addressed as follows:

Hydraulic System - Public Service Company of Colorado (PSC) comitted to

conduct an evaluation of exposed hot surfaces in proximity (10 foot

radius) to the 30 tc+:raulic valves. This included an evaluation of

surf aces with a temperature of over 500*F which are potential ignition

sources. Additicaal protective measures will be evaluated. The evaluation

was to have been provided by January 30, 1988. However, it was not

included in your current report.

PSC should provide this report within 15

days of the date of this letter.

The balance of the final report discussion concerning the hydraulic

system is acceptable.

Piping and Affected Components - The final report, discussion of piping

,

'

ano af fectec components is a:ceptabla.

Effects of Combustion Products - The final resort discussion of the

,

effects of combustion products is acceptable.

Control Room Ventilation System - The final report addresses several

items that were not complete and documented at the time of plant

restart. These included testing the Control Room Ventilation System to

establish that positive pressure was maintained relative to the Turbine

Building and Building 10. Also included was a review of system operating

procedures to assure their adequacy to deal with smoke in these adjacent

buildings. A list of all changes to the Control Room Ventilation System

has been supplied,

8803090032 080229

PDR

ADOCK 05000267

F

PDR

'

.-

.

-

-

.

,

.

4

2

The staff therefore concludes the final report discussion of the Control

Room Ventilation System is acceptable.

The information requested in this letter affects fewer than 10 respondents;

therefore OMB clearance is not required under P.L.96-511.

'

Sincerely,

),

Kenneth L. Heitner Project Manager

Project Directorate - IV

Division of Reactor Projects - 111

IV, V,and Special Projects

Office of Nuclear Reactor Regulation

,

cc: See next page

DI.STRIBUTION

LFocket File

NRC & Local PDRs

PD4 Reeding

J. Calvo

AD/Rerion IV

P. No; nan

K. H: itr,ar

0GC

E. J;rdan

J. Partlow

ACRS (10)

PD4 Plant File

4

C. McCraken

J. Craig

,

!

,

CONCURRENCE.-

Il,s4

k

.

PD4/ lag,u

PD4/FM

P34/D

CHE -

'

,

'

PNoon63 Q'^-

KHeitner

JCalvr

CMcCraken

Cxaig

.

02M88

02/ W 88

02/u./ <d

02/J/g/88

02/Al%

.

.

. .

..

.

.

Mr. R. O. Williams, Jr.

-

Public Service Compr.ry of Colorado

Fort St. Vrain

cc:

Mr. D. W. Warenbourg, Manager

Albert J. Hazle, Director

Nuclear Engineering Divisior.

Padiation Control Division

Public Servica Company

Department of Health

of Colorado

4210 East lith Avenue

P. O. Box 84G

Denvers Colorado 80220

Denver, Colorado 80201-0840

Mr. David Alberstein, 14/1C9A

Mr. R. O. Williams, Jr., Acting Manager

~

GA Technologies, Inc.

Nuclear Production Division

Post Office Pox 85608

Public Service Company of Colorado

San Diego, California 92138

16805 Weld County koad 19-1/2

Platteville, Colorado 80651

Mr. H. L. Brey, Manager

-

Nuclear Licensing and Fuel Divisier

Mr. P. F. Tomlinson, Manager

Public Service Company of Colorado

Quality Assurance Division

P. O. Box 840

Public Service Company of Colorado

Denver, Colorado 80201-0840

16805 Weld County Road 19-1/2

Platteville, Colorado 80651

Senior Resident Inspector

U.S. Nuclear Regulatory Comission

Mr. R. F. Walker

P. O. Box 640

Public Service Company of Colorado

Platteville, Colorado 80651

Post Office Box 840

Denver, Colorado 80201-0840

Kelley, Starsfield & 0'Donnell

Public Service Company Building

Comitrnent Control Program

Room 900

Coordinator

550 15th Street

Public Service Company of Colorado

Denver, Colorado 80202

2420 W. 26th Ave. Suite 100-0

Denver, Colorado 80211

Pegional Administrator, Region IV

U.S. Nuclear Regulatory Comission

611 Ryan Plaza Drive, buite 1000

Arlington, Texas 76011

Chainnan, Board of County Comissionert

of Weld County, Colorado

Greeley, Colorado 80C31

Reginnal Representative

Radiation Progrars

Environr. ental Protection Agency

1 Denver Place

999 18th Street, Suite 1300

Denver, Colorado 80202-2413