Text
_ - _ _
,o Alabama Powar Compny.
600 North 18th Street 4
' Post office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 L
L " O ;" 1,n, Alabama Power Docket No. 50-348 the southem e/ECfrC S) Stem 10CFR50.55a(g)
February 25, 1988 U. S. Nuclear Regulatory Cotunission Attention: Document Control Desk Washington, D. C.
20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 1 Stroke Times for Power Operated Valves in the Second Ten-Year Interval Inservice Testing Program A meeting was held on August 25 and 26, 1987 at Farley Nuclear Plant to review the Second Ten-Year Interval IST Program with the NRC.
During this meeting, Alabama Power Company agreed to submit a list of full-stroke times for all power operated valves requiring stroke timing by the subject program. his was documented in Item 2 of Alabama Power Company's letter of September 30, 1987.
Attached for the NRC's information is the subject list which provides the maximum full-stroke time values which are intended for use in performing inservice testing to the requirements of the ASME Code,Section XI.
h is list includes values, where appropriate, for all motor and air operated valves which are within the program scope and l
l which require stroke time measurement. Solenoid operated valves were not included since their full-stroke times are already covered in the IST Program under the valve general relief request VG-1.
l l
8803080388 880225 PDR ADOCK 05000340 PDR p
l 9
l l
l
U. S. Nucl^4 r RegulEtory Commission-February 25, 1988 Page 2 l
Individual valve maximum stroke times are not included in the IST Program because they may require revision over the life of the plant due to modifications. 'Ihese values are provided for information purposes only and are not considered an addendum to the IST Program.
Since Section XI, IW-3413(a) permits the limiting value of
' full-stroke time for each power operated valve to be specified by the owner, stroke times will be revised as necessary to remain consistent with plant operating and. design requirements.
If there are any additional questions, please advise.
Respectfully submitted, AIABAMA ANY h
R. P. Mcdonald RPtySTB:csl-2 Attachment cc/att: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford l
l l
l l
l l
l l
i ATTACHMDTP TPNS 01EER OP STROKE SYSTEM NUMBER NLMBER TYPE TIME (SEC.)
i REAC'IOR COOINTP Q1B13V027A 1-8000A MO 12 QlB13V027B 1-8000B MO 12 Q1B13V037 1-8047 A0 10 Q1813V039 1-8033 A0 10 Q1B13V040 1-8028 Ao 5
01B13v053 1-PCV445A A0 5.6 QlB13V061 1-PCV444B A0 5.6 LHSI/RHR Q1E11V001A 1-8701A MO-
< 120 Q1E11V001B 1-8702A MO
< 120 Q1E11V009A 1-8706A MO 15 Q1E11V009B 1-8706B MO 15 Q1E11V016A 1-8701B MO 120 Q1E11V016B 1-8702B MO 120 Q1EllV023A 1-8888B MO 12 Q1E11V023B 1-8888A MO 12 Q1E11V024A 1-8887A MO 17 Q1E11V024B 1-8887B MO 17 Q1E11V025A 1-8811A Mo 17 Q1E11V025B 1-8811B MO 17 Q1E11V026A 1-8812A MO 17 Q1E11V026B 1-88128 MO 17 Q1E11V027A 1-8809A MO 17 Q1E11V0278 1-8809B MO 17 Q1E11V037A 1-rCV602A MO 10 01E11V0378 1-rCv602B MO 10 Q1E11V044 1-8889 MO 12 REACIOR CAVITY COOLING ole 12v001A HV3999A A0 30 Q1E12V001B HV3999B A0 30 CONIAINMENT SPRAY QlE13V003A 1-8826A MO 17 Q1E13V003B 1-8826B MO 17 Q1E13V004A 1-8827A MO 17 Q1E13V004B 1-8827B MO 17 Q1E13V005A 1-8820A MO 10 Q1E13V005B 1-8820B MO 10 Q1E13V012A 1-8817A MO 15 Q1E13V012B 1-8817B MO 15 01E13V021A 1-8836A MO 12 01E13V021B 1-8836B MO 12 Page 1 of 7 l
._ J
ATrA NMENT TPNS OfINER OP
, STROKE SYSTEM
, NUMBER NUMEER TYPE TIME (SEC.)
CONTAINMDir ISOLATION Q1E14V002 MOV3660 Mo 10-Q1E14V003
!cv3318A Mo 10 Q1E14VOo4 MOV3318B Mo 10 01E14 Hv3657 Ao 13-01E14 HV3658 Ao 5
PENETRATION ROOM FILTRATION Q1E15V001A MOV3361B Mo 45 01E15V001B MOV3361A Mo 45 Q1E15v001C Mov3362B Mo 45 Q1E15V003D MOV3362A Mo 45 Q1E15V002A MOV3356A A0 10 Q1E15V002B Mov3356B AO 10 Q1E15V003A MOV3357A AO 10 Q1E15v003B MOV3357B AD 10 SI/CVCS QlE21V004A 1-8801A Mo 10 Q1E21V004B 1-8801B MO 10 01E21V015 1-8942 Ao 2
Q1E21V016A 1-8803A MO 10 Q1E21V016B 1-8803B MO 10 Q1E21v049 1-8871 Ao 10 01E21V050 1-8961 A0 10 Q1E21V056A 1-8945A Ao 2
l 01E21v056B 1-8945B AO 2
l Q1E21v059 1-8880 AD 10 i
Q1E21v063 1-8885 no 10 01E21v068 1-8886 MO 10 01E21V072 1-8884 No 10 Q1E21v091 1-8860 Ao 5
01E21v249A 1-8112 Mo 10 Q1E21V249B 1-8100 Mo 10 Q1E21V253A 1-8149A AO 10 Q1E21V253B 1-8149B AO 10 Q1E21V253C 1-8149C Ao 10 Q1E21V254 1-8152 Ao 10 l-Q1E21V257 1-8107 Mo 10 l
Q1E21V258 1-8108 Mo 10 l
Q1E21V264 1-8104 Mo 12 l
Q1E21V324A 1-8130A MO 12 Q1E21V324B 1-8130B MO 12 01E21V325A 1-8131A No 12 Q1E21V325B 1-8131B Mo 12 Q1E21V326A 1-8132A MO 12 Q1E21V326B 1-8132B MO 12 i
Page 2 of 7 L
n 4,
ATIACHMDTT TPNS OINER OP STROKE SYSTEM NUMBER NUMBER TYPE TIME (SEC.)
SI/CVCS (Con't)
Q1E21V327A 1-8133A MO 12 Q1E21*/327B 1 8133B m
12 Q1E21V336A 1-LCV115B MO 10 Q1E21V336B 1-LCV115D MO 10 Q1E21V376A 1-LCV115C MO 10 01E21V376B 1-LCV115E MO 10 Q1E21V565A 1-8175A A0 5
Q1E21V565B 1-8175B A0 5
REACTOR CAVITY POST IDCA Q1E22V001A MOV3072A MO 18 DILUTION Q1E22V001B MOV3872B MO 18 POST ACCIDDir CCl7rAINMDTF Q1E23V002 1-MOV3740 Mo 45 VDC AND SAMPLE QlE23V003 1-MOV3530 Mo 45 Q1E23V022A 1-MOV3528A MO 12 01E23V022B 1-MOV3528B MO 12 Q1E23v022C 1-MOV3528C MO 12 Q1E23V022D 1-MOV3528D MO 12 Q1E23V023A 1-MOV3739A MO 12 Q1E23V023B 1-MOV3739B MO 12 Q1E23V024A 1-Mov3745A MO 12 Q1E23v024B 1-MOV3745B MO 12 Q1E23V025A 1-MOV3835A
.MO 12 Q1E23V025B 1-MOV3835B MO 12 LIQUIC WAS'E DISPOSAL Q1G21V001 1-7150 A0 10 01G21v006 1-7136 AD 10 01G21V064 1-LCV1003 A0 10 Q1G21V082 1-7126 AD 10 01G21 HV3376 AO 5
Q1G21 HV3377 Ao 5
Q1G21 HV3380 AD 10 STEAM GENERATOR BI4WDOWN Q1G24V003A 1-7614A AD 10 01G24V003B 1-7614B AD 10 01G24V003C 1-7614C A0 10 l
Q1G24V005A 1-7697A AO 20 Q1G24v005B 1-7698A A0 20 Q1G24V005C 1-7699A A0 20 Q1G24v006A 1-7697B A0 20 Q1G24V006B 1-76988 AO 20 Q1G24V006C 1-76998 A0 20 l
Page 3 of 7 i
l
c.
ATTACHMENT TPNS OTHER OP STROKE SYSTEM NLMBER NLMBER TYPE TIME (SEC.)
MAIN STEAM Q1N11V001A W3369A A0/S 5
Q1N11V001B Hv3369B AO/S 5
Q1N11V001C W3369C AO/S 5
Q1N11V002A HV3370A AO/S 5
Q1N11V002B HV3370B AO/S 5
Q1N11V002C HV3370C A0/S Q1N11V003A HV3368A Ao 5
Q1N11V003B HV3368B AO 5
Q1N11V003C W3368C Ao 5-Q1N11V003D W3976A AO 5
Q1121V003E HV3976B Ao 5-Q1N11V003r HV3976C AO 5
AUXILIARY STEAM Q1N12 W3226 A0 45 Q1N12 HV3234A' Ao 5
Q1N12 HV3234B AO 5
FEEIAA1ER Q1N21V001A MOV3232A M0/S 30 Q1N21V001B MOV3232B M0/S 30 Q1N21V001C MOV3232C M0/S 30 Q1C22 FCV478 Ao 5
Q1C22 FCV488 Ao
.5 Q1C22 FCV498 Ao 5
Q1C22 FCV479 Ao 5
Q1C22 FCV489 Ao 5
Q1C22 FCV499 Ao 5
AUXILIARY FEEDNATER Q1N23V013A MOV3210A MO 15 Q1N23v013B MOV3210B MO 15 Q1N23V014A MOV3209A MO 10 Q1N23V014B MOV3209B Mo 10 Q1N23V014C MOV3216 MO 10 01N23V025A MOV3764A MO 75 01N23v025B MOV3764B MO 75 Q1N23V025C-MOV3764C Mo 75 Q1N23V025D MOV3764D MO 75 Q1N23V025E MOV3764E MO 75 Q1N23v025r MOV3764r Ho 75 Q1N23 HV3227A AO 15 Q1N23 HV3227B A0 15 Q1N23 Hv3227C AO 15 Q1N23 Hv3228A AO 15 Q1N23 HV3228B Ao 15 Q1N23 HV3228C A0 15 Page 4 of 7
e ATIACIOGNP TPNS 01HER OP STROKE SYS11!M NUMBER.
NLMBER TYPE
-TIME (SEC.)
CHEMICAL INJECTION N1N25V001A HV3772A Ao 5
N1N25v001B Hv37728 Ao 5
N1N25V001C.
HV3772C Ao 5-DEMINERALIZED MTER Q1P11V001 Hv3659 AD 10 CONTAItaG!NT PURGE Q1P13v281 Hv3198D A0 5
Q1P13V282 HV3197 A0 5
Q1P13V283 Hv3196 A0 5
QlP13v284 HV3198A A0 5
Q1P13v301 HV2866C A0 5
Q1P13V302 HV2866D A0 5
Q1P13V303 Hv2867C A0 5
l Q1P13v304 HV2867D AO 5
SAMPLING Q1P15 HV3101 AO 60 Q1P15 HV3102 A0 60 Q1P15 HV3103 Ao 5
Q1P15 HV3104 Ao 5
Q1P15 HV3179A A0 60 QLP15 HV3179B A0 60 Q1M 5 HV3179C A0 60 Q1P15 HV3180A A0 60 QlP15 HV3180B AD 60 Q1P15 HV3180C A0 60 Q1P15 HV3181A AO 60 Q1P15 HV3181B AO 60 Q1P15 HV3181C A0 60 Q1P15 HV3328 Ao 5
Q1P15 HV3329 Ao 5
Q1P15 HV3330 Ao 5
01P15 HV3331 Ao 5
Q1P15 HV3332 Ao 5
Q1P15 HV3333 Ao 5
QlP15 HV3334 Ao 5
Q1P15 HV3765 Ao 5
QlP15 HV3766 Ao 5
Q1P15 HV3880 A0 60 Q1P15 HV3881 A0 60
. SERVICE E TER Q1P16V043A MOV3024A MO 65 01P16V043B MOV3024B MO 65 Q1P16V043C MOV3024C MO 65 Page 5 of 7 l
1
ATTACHMENT L
TPNS CTIMER OP STROKE SYSTEM NUMBER NUMBER TYPE TIME (SEC.)
' SERVICE W TER (Con't)
Q1P16V043D MOV3024D MO 65 OlP16V052 Mov3149 MO 90 Q1P16V064 MOV3150 Mo 90 Q1P16V071 Mov3135 MO 15-Q1P16V072 MOV3134 Mo 15 Q1P16V081 McV3131 MO 15 Q1P16V505 MO 184 01P16V506 MO 184 01P16V507 Mo 45 01P16V508 Mo 45 Q1P16V514 MO 75 QlP16VS15 MO 75 Q1P16V516 MO 75 Q1P16V517 MO 75 Q1P16V518 MO 75 Q1P16V519 MO 75 01P16V536 MO 75 Q1P16V537 Mo 75 Q1P16V538 Mo 45 01P16V539 Mo 45 01P16V545 Mo 45 01P16V546 Mo 45 QlP16V721A MO 15 Q1P16V721B MO 15-COMPCNENT COOLING WATER QlP17V029A MOV3185A MO 90 OlP17V029B MOV3185B MO 90 Q1P17V082 MOV3052 MO 10 Q1P17V097 MOV3046 Mo 10 Q1P17V099 MOV3182 MO 10 Q1P17V117A MOV3031A MO 15 Q1P17V117B MOV3031B MO 15 Q1P17 HV2229 A0 5
Q1P17 W3045 Ao 5
Q1P17 HV3067 A0 10 01P17 HV3095 AD 10 Q1P17 HV3096A A0 10 Q1P17 HV30968 A0 10 Q1P17 HV3184 Ao 5
Q1P17 HV3443 Ao 5
Q1P17 Rv3028 A0 5
INSTRUMENT AIR Q1P19 HV3611 Ao 10 Page 6 of 7
}
a ATTACHMENT TPNS OWER OP STROKE SYSTEM NUMBER INER TYPE TIME (SEC.)
NON-RADIOACTIVE VENT QSV47V001A W3624 AO 4
QSV47V001B W3625 A0 4
QSV47V002A HV3623 AO 4
QSV47V002B HV3622 AO 4
QSV47V003A HV3626 Ao 4
QSV47V007 HV1527 A0 4
QSV47V0f.:'
HV3479A AO 4
SPENT FUEL POOL VENT AND Q1V48V001A HV3538A AO 10 FILTRATICE Q1V48V001B HV3538B A0 10 CCNTROL ROOM HVAC AND
- $V49V001A Mov3478A Mo 8
FILTRATION QSV49V001B MOV3478B MO 8
. i:
QSV49V003A HV3628 AO 12 QSV49V003B HV3629 A0 12 QSV49V004A HV3649A AO 5
QSV49V004B HV3649B AO 5
QSV49V004C HV3649C AO 5
QSV49V008 MOV2769A MO 65 QSV49V009 MOV27698 MO 65 SE:csi-2 Page 7 of 7 i