Informs of Util Intention to Begin Heatup of Plant from Current Cold Shutdown Condition,In Response to NRC 880120 Request.Plant Met Necessary Prerequisites Prior to Leaving Cold Shutdown Condition & Proceeding W/Safe RCS Heatup
ML20147G757
Person / Time
Site: Rancho Seco
Issue date: 03/01/1988
From: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GCA-88-064, GCA-88-64, NUDOCS 8803080309
Download: ML20147G757 (3)


Text

_

\ J N..I, c h bSMUD i SACRAMENTO MUNICIPAL UTluTY DISTRICT O P. O. Box 15830, Sacramento CA 96852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA (

Y GCA 88-064 MAR of 1999 U. S. Nuclear Regulatory Connission

  • Attn: J. B. Martin, Regional Administrator Region V 1450 Maria Lan'.. Suite 210 t Walnut Creek, CA 94596 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 CERTIFICATION FOR REACTOR HEATUP

Dear Mr. Martin:

This response to your request dated January 20, 1988, is to inform you of our intent.to begin heatup of Rancho Seco from its current cold shojdown

(<2000F) condition. Heatup will begin upon completion of all schedUed activities per'the preapproved startup schedule and proceed until hot shutdown conditions (>5250F) have been reached. Af ter completing hot functional testing, we will provide you with certification of our ability to enter hot standby (i.e., reduce the shutdown margin and take the reactor critical) and commence with power operation.

We have initiated Operating Procedure B.1 A "Control of Plant Hettup and Operating Procedure for Power Escalation Testing" and have completed the necessary prerequisites for heatup from cold shutdown. In confirming the accraplishment of the prerequisites, we have verified that:

e Technical Specification and procedural prerequisites for

( continuing the startup beyond cold shutdown have been satisfied (Procedure B.1 A, Sections 4.1.8, 4.1.15 ) ,

c2

-m o Procedures needed for continuing the startup beyond cold shutdown i

are available and operators have been trained in their use 80 (L1.3,4.1.13),

cm

  • e Plaat staffing meets the Technical Specifications and procedural

$$ requirements (4.1.19, 4.1.20, 4.1.21'), and c)o l $3$ e 7he Plant Review Committee (PRC) and the Management Safety Review j 8 Committee (MSRC) have provided their review and approval to j gg continue the startup beyond cold shutdown (4.1.17, 4.1.18).

m a. a.

  • The modifications to the TDI diesel generators have been tested and i the recults indicate that vibrations are within the established  !

acceptance criteria (i.e., ANSI /ASME OM3-1?B2). ,, p (

RANCHO SECO NUCLEAR GENERATING STATION D 1444o Twin Cities Road, Her6d, CA 95638-9769, (209) 333-2935

y8 GCA 88-064 J. B. Martin -- ?,- 7 MAR 01 1938

( ,

In addition, the AGM Nuclear Power Production, AGM Technical and Administrative Services, Director of ManagemerS Systems, Director of Nuclear '

Quality and I have met with each appropriate department to ensure that all  !

mattert, such as regulatory and management commitments are closed, paperwork is in proper order, procedures are properly prepared, reviewed and approved and l that personnel are trained and ready tc support safe heatup. l Tc the best of my belief and knowledge, kancho Seco has met the necessary i picce

!. Wafe'quisites prior tosystem reactor coolant leaving the cold dutdown condition and proceeding with heatup.

~

o1 Please contact me if yonMve any questions. Members of your staff with questions requiring additional information or clarification may contect Mr. Joe Firlit at (209) 333-2935, extension 4t87.

Sincerely, y <

h,

/ . Carl.3 ndognf 3 Chief Executiy6 Officer, Nuclear  ;

/ 'cc : F. Miraglia, NRC, Rockville G. Kalman, NRC, Rockville

,gj A. D' Angelo, NRC, Rancho Seco SACRAMENTO MUNICIPAL UTILITY DISTRICT ACKNOWLEDGEMENT iflDililhlii ft fillilHillif flilllililllilllllHillHIMhlilililllitif filli)Ulflililllilllilllillfilllillifl] 19_8&, before me, ll:

ill hil C*lifornia On this the __]s t day of Mr.ch ll!

State of . . _ ,

I SS. Judy E. Luna [ !!!

County of __ _ Sacramento -

the undersigned Notary PuNic,$en onally appeared G. Carl Andognini .

8, ll:

16l -- i (t' O personally known to me ll!

i l' C) proved to me on the basis of satisfactory evidence

) 7-p.gpgg to be the person (s) who otcwod the within instrument as  !!,

jggy g ggg Chief Executive Offic m jh atear

l l,
swm ac r wrom t u,C$D,% or on behalf of the District thtrein namic'. And acknowledged to me f+

e .. ....... -"" f that the District executed it WITNE%d my hand and official seal. Il

g g;

% ii gg fti 11:

N y's S ture _

j .6115151111115115155111111111 H l!lli lllilllillll llillllil ll lllll l llllililill.ll H illh 311515 lill b illlillilllill! lli e bMJO 134810 63 s

1

/ h

h) [' j . -

GCA 88-064

' J. B. Martin bc:

w/atch w/o atch X' General Manager .MS 41 T T Chief Executive Officer, Nuclear MS 209 X Executive Assistant MS 204 T AGM, Nucl. Tech. & Adm. Services. MS 206 T AGM, Nuclear Power Production MS 254 T- Director, Nuclear Quality MS 271

Director, Nuclear Ops. & Maint. MS 257 T Director, Plant Support MS 258 Director, Sys. Rev. & Test Prgm. MS 259 Modifications Manager MS 201 T Manager, Nuclear Training MS 296 T Manager, Nuclear Licensing MS 298 T Manager, Nuclear Engineering MS 208-6 Manager, Cost Control Services MS 270 T Public Information MS 299 Manager, Maintenance MS 254 Manager, Operations MS 255 Manager, Env. Protection MS 292A Manager, Rad. Protection MS 244 Manager, Nuclear Chemistry MS 244 Manager, Plarit Performance MS 258 Risk Manager (0, Nears) MS 40 MSRC Secretary (J. Palmer) MS 274 Surveillance Coordinator MS 278 T IIRG MS 298 T

- NAC (5)- MS 204 T. Baxter F. Burke (B&W)

LER Files MS 286 T Licensing Files MS 286 T PRC Files MS 286 X RIC Files MS 224 Special Report Files MS 286 Tech. Spec./PA Files MS 298 NOV/N0D Files MS 286 Licensing Verification MS 286 T Elizabeth Gebur MS 286 T Jerry Delezenski MS 298 T Bob Little (Rockville) h h#

y k