ML20147G427

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Modifying Surveillance & Action Statement Requirements for Waste Handling & Packaging Facility Exhaust Monitor in Table 4.3-3 of Recovery Operations Plan
ML20147G427
Person / Time
Site: Crane 
Issue date: 03/02/1988
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20147G391 List:
References
NUDOCS 8803080227
Download: ML20147G427 (2)


Text

-

EN TABLE 4.3-3 (Cont'd) m RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS 3i G

E CHANNEL E

CHANNEL CHANNEL FUNCTIONAL CHANNELS FUNCTIONAL UNIT CHECK.

CALIBRATION TEST OPERABLE APPLICABILITY' ACTION E

G 5.

FUEL TRANSFER CANAL n.>

a.

Criticality Monitor S

R H

1 Note 11

. Note 12 6.

FUEL POOL "A" a.

Criticality Monitor S

R M

1 Note 11 Note 12 7.

FUEL HANDLING BUILDING TRUCK BAY a.

Criticality Monitor S

R n

1 Note 11 Note 12 Y

8.

HASTE HANDLING AND PACKAGING FACILITY (WHPF) a.

Exhaust Monitor D

R M

1 Note 1 Note 13 9.

REACTOR BUILDING a.

End Fitting Storage S

R M

1 Note 14 Note 15 Area Criticality Monitor (See following pages for Notes.)

8803080227 880302 PDR ADOCK 05000320 P

PDR

.t

e --

c 1 's jl TABLE 4.3-3 (Cont'd)

??

RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS P

m NOTES:

g; r--

ll 11.

During either of the following operations:

l a.

Handling of canisters containing core material.

g-b.

Handling of any heavy load over canisters containing core materials.

.-e n>

12. With less than one channel operable, terminate the following operations:

a.

Handling of canisters containing core material.

  • b.

Handling of any heavy load over canisters containing core material.

13. With less than one channel operable, effluents releases via the affected pathway may continue for up to thirty (30) days provided that samples are continuously collected with auxiliary sampling equipment within-the WHPF. These auxiliary filter samples will be changed daily and a gamma scan performed within 24-hours.

After completion of the gamma scan, an analysis for gross alpha, gross beta, and Sr/Y-90 activities will be completed within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />.

((

14. During periods when personnel are in the containnent and end fittings are being transferred to or stored in a,

their designated location outside the Reactor Vessel.

=

15. With less than one channel operable, terminate the following operations:

a.

Handling of end fitting storage containers outside the Reactor Vessel.**

b.

Handling of any heavy load over the end fitting storage container area.

  • This shall not prohibit placing a canister in transit in a safe storage location.
    • This shall not prohibit placing a end fitting storage container in transit in a safe storage location.

-