Responds to 781228 NRC Request for Reply to NUREG-0313 Re Matl Selection for Coolant Pressure Boundary Piping.States Piping Will Meet Section I &Ii Req & No Augmented Insvc Inspec Is Req.Details Will Follow for Water Pipe Field Weld
ML20147G304
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 12/19/1978
From: Koch L
ILLINOIS POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0313, RTR-NUREG-313 U-0082, U-82, NUDOCS 7812260141
Download: ML20147G304 (2)


Text

._ _ _ . _ __ _. _ _ _ _ .

.o U-0082 ILLIN0/S POWER COMPANY ~ T--.; B40-78(12-19)-0 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 December 19, 1978 Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 Division of Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Stolz:

Reference:

(a) Letter, J. F. Stolz (NRC) to L. J. Koch (IP),

l "NRC Staff Position on the Use of Austenitic Stainless Steel in Boiling Water Reactor Facilities -- (Clinton Power Station, Units 1 and 2) ," dated February 28, 1978 (b) Letter, G. E. Wuller (IP) to J. F. Stolz (NRC),

"Clinton Power Station Units 1 and 2, Docket Nos. 50-461 and 50-462," dated March 20, 1978 Clinton Power Station Docket Nos. 50-461 and 50-462 Mitigation of Intergranular Stress Corrosion Cracking in Austenitic Stainless Steel ,

l Reference (a) forwarded NUREG-0313, " Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping," and recuested our response. Reference (b) indi-cated that we anticipatec, submitting the requested information by i i

December 30, 1978. This letter provides the requested response, j The current intent of Illinois Power Company is that Clinton Power Station will be constructed so that all austenitic stainless steel pressure boundary piping in contact with BWR water will have less than 0.035 percent carbon or will be in the solution annealed condition.

IP plans to meet the requirements of each of the subsections'of Sections II and III of NUREG-0313, as follows:

a.Section II - Reactor pressure boundary piping will meet the requirements of this section by a combination of Subsections 1 and 2.

'71)

\

7812260ld s

U-0082 B40-78(12-19)-0 John F. Stolz December 19, 1978 Page 2

b.Section III, Subsection 1 - Since we intend to meet all requirements of Section II, no augmented inservice inspec-tion or leak detection will be necessary and Subsection 2 is not applicable.

Complete details have yet to be developed for some of the recirculating water pipe, especially some of the field welds. We will inform you of any cases for which we do not comply with Sub-sections 1 or 2 if they should arise.

Per your request, forty (40) copies of this letter are provided.

Sincerely,

..- f L J.' Koch Vice President PEW:dl cc: I. A. Peltier, NRC Clinton Project Manager

-