ML20147G303
| ML20147G303 | |
| Person / Time | |
|---|---|
| Issue date: | 03/18/1997 |
| From: | Sheron B NRC (Affiliation Not Assigned) |
| To: | Cozens K NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT & |
| Shared Package | |
| ML20147B448 | List: |
| References | |
| NUDOCS 9703280077 | |
| Download: ML20147G303 (3) | |
Text
'
T-5C3 March 18, 1997 Kurt Cozens Nuclear Energy Institute 1776 I Street, Suite 400 Washington, D.C.
20006
Dear Mr. Cozens:
Thank you for agreeing to participate in the Ninth NRC Regulatory Information Conference, which will be held on April 1 - 2, 1997, at the Capital Hilton Hotel in Washington, D.C.
The Division of Engineering is leading two Breakout Sessions, " Steam Generator Issues," which will be held on Tuesday, April 1, 1997,. from 3:15 p.m. to 4:25 p.m., and " Reactor Vessel and Reactor Vessel Penetration Issues," which will be held on Wednesday, April 2,1997, from 2:30 p.m. to 4:00 p.m.
Enclosed is the latest agenda and information on the Conference. A Speaker's package will be available for you in the Speaker's Room (California Room).
Final information and any changes will be provided to you as soon as they become available.
Again, thank you for your participation.
I look forward discussing these issues with you and other members of the industry and the public.
Sincerely, ORIGIN /d.SIGED BY Brian W. Sheron, Director Division of Engineering Office of Nuclear Reactor Regulation l
Distribution:
File Center /PDR DE RF EMCB RF i
CCarpenter/CHRON DOCUMENT NAME: A:\\RIC.NE2
'. t. N / S u N N 'u N **
'"'*I****
EMCB:0k/
hi)DE D:ph [
OFFICE JStroshder hdinas BShhd
- w
$ /l1 '97
'j/f,/g7 3//[/g7 DATE
/
0FFICIAL RECORD COPY
\\b I
9 I
3 ggStf.E gt 280005 cp yg
- haa ]
C a
bj 9703280077 970318 PDR REVGP ERGNUMRC PDR
p aar t
UNITED STATES
}
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20066-0001 i
+4 0
- 4 March 18,1997 Kurt Cozens Nuclear Energy Institute j
1776 I Street, Suite 400 Washington, D.C.
20006 4
- h Dear Thank you for agreeing to participate in the Ninth NRC Regulatory Information Conference, which will be held on April 1 - 2, 1997, at the Capital Hilton l
Hotel in Washington, D.C.
The Division of Engineering is leading two Breakout 1
Sessions, " Steam Generator Issues," which will be held on Tuesday, April 1, 1997, from 3:15 p.m. to 4:25 p.m., and " Reactor Vessel and Reactor Vessel Penetration Issues," which will be held on Wednesday, April 2,1997, from
')
2:30 p.m. to 4:00 p.m.
Enclosed is the latest agenda and information on the Conference. A Speaker's package will be available for you in the Speaker's Room (California Room).
Final information and any changes will be provided to you as soon as they become available.
i Again, thank you for your participation.
I look forward discussing these issues with you and other members of the industry and the public.
Sincerely, N
N Brian W. Sheron, Director Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated
PROPOSED REG INFO CONF SPEAKERS STEAM RENERATORS: GLs and Rule Makina (April 1, 3:20pm Breakout Session)
NRC Presentation:
B. Sheron, Director Division of Engineering-U.S. Nuclear Regulatory Commission Industry Presentations: M. Tuckman, Sr. Vice President Duke Power G. Kammerdeiner, Technical Assistant Duquesne Light Co.
Panel Discussion:
B. Sheron M. Tuckman J. Strosnider, USNRC J. Donoghue, USNRC REACTOR PRESSURE VESSELS: Embrittlement / Internals / Penetrations (April 2, 2:30pm Breakout Session)
RPV Embrittlement (GL 92-01 Supp 1):
J. Strosnider, USNRC S. Byrnes, Combustion Engineering RPV Internals:
R. Hermann, USNRC R. Dyle, Carolina Power and Light RPV Closure Head Penetrations:
G. Lainas, USNRC C. Cozens, NEl Robin Dyle, Technical Chairman BWRVIP Assessment Task Southern Nuclear Operating Co.
Post Office Box 1295 40 Inverness Center Parkway Bimingham, AL 35201 ENCLOSURE
,