ML20147F296

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 781004-05
ML20147F296
Person / Time
Site: Limerick Constellation icon.png
Issue date: 10/24/1978
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20147F286 List:
References
50-352-78-08, 50-352-78-8, NUDOCS 7812210394
Download: ML20147F296 (1)


Text

. _ _ _ ._

i flIl -

1

-APPENDIX A_

NOTICE OF VIOLATION' l

j I

Philadelphia Electric Company Docket No. 50-352 l

This refers to the investigation conducted by a representative of the Region I (Philadelphia) office at the Limerick Generating. Station, Unit

1. Limerick, Pennsylvania, of. activities au'thorized by NRC License No.

CPPR-106.

During this investigation conducted on October 4 and 5,1978, the following apparent. item of noncompliance was identified.

10 CFR.50, Appendix B, Criterion IX, requires that-welding be accomplished in accordance with criteria and special requirements.

.The Limerick PSAR, Appendix 0, Quality Assurance Program, Paragraph j D.6.3, . specifies that inspections will be performed on procured I items to assure compliance with specification requirements.

P&H Drawing No. 28A13615, sheet 1, Revision C, of the Reactor Building Crane, view B-B and Detail "A" specifies that the weld

' joint between_ the tie-plates (part No.18) and the box girder be a 45" double-bevel-grooveweld with a 3/8" prepared chamfer on each ,

side. l Contrary to the above, on October 4,1978, it was determined that the reactor building crane tie-plate to box girder welds are fillet welds.

4 This item is an infraction.  ;