05000366/LER-1978-035-03, /03L-0:on 780914,weekly IRM Procedure HNP-2-3052 Not Completed within Tech Spec Time Interval.Caused by Personnel Oversight

From kanterella
(Redirected from ML20147E820)
Jump to navigation Jump to search
/03L-0:on 780914,weekly IRM Procedure HNP-2-3052 Not Completed within Tech Spec Time Interval.Caused by Personnel Oversight
ML20147E820
Person / Time
Site: Hatch 
Issue date: 09/27/1978
From: Nix R
GEORGIA POWER CO.
To:
Shared Package
ML20147E817 List:
References
LER-78-035-03L, LER-78-35-3L, NUDOCS 7810180033
Download: ML20147E820 (1)


LER-1978-035, /03L-0:on 780914,weekly IRM Procedure HNP-2-3052 Not Completed within Tech Spec Time Interval.Caused by Personnel Oversight
Event date:
Report date:
3661978035R03 - NRC Website

text

.

\\

4 R3 PUBLIC DCr C

TC%

UNITED STATES OF AMERICA 00I

- d NUCLEAR REGULATORY COMMISSION g7 g NB t.

~

?:;;'Q,, $;.p r,

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD y

h' l

l In the Matter of

)

l

)

0FFSHORE POWER SYSTEMS

)

Docket No. STN 50-437

)

l (Manufacturing License for Floating

)

l Nuclear Power Plants)

)

ORDER Under date of September 8, 1978, Natural Resources Defense Council (NRDC) filed a Motion For Leave To File A Response And For An Extension Of Time.

Therein NRDC requested leave to file and an extension cf time within which to file a response to the Applicant's and the Staff's respective submissions of August 21 and August 24, 1978 which had opposed the granting of NRDC's Motion To Amend Contentions filed on August 9, 1978.

NRDC's instant Motior, is denied as being moot.

Between September 8th, when the instant Motion was served, and September 12th, when the Board received it, the Board had issued its Order on September lith which denied NRDC's Motion To Amend Contentions.

IT IS 50 ORDERED.

FOR THE ATOMIC SAFETY AND LICENSING BOARD hNtbh Sheldon J. Wolfe, Esquire l

Chairman l

Dated at Bethesda, Maryland this 5th day of October, 1978.

7 8 % n W 9'> 3 3 e