iO
%
UNITED STATES
S'
[$
e
0
NUCLCAR REGULATORY COMMISSION
REGION IV
n
M.
j
611 RYAN PLAZA DRIVE, SUITE 1000
$
.,
- . < .
' ' t-
AH LINGTON, TE XAS 76011
'N
November 13, 1978
.....
In Reply Refer To:
RIV
Docket flo. 50-445/Rpt. 78-19
50-446/Rpt. 78-19
Texas Utilities Generating Company
ATTN:
Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Mr. A. B. Rosenberg of our
staff during the period October 31 - November 3,1978, of activities
authorized by NRC Construction Permit flos. CPPR-126 and 127 for the
Comanche Peak facility, Units No.1 and 2, and to the discussion of
our findings with Mr. R. G. Tolson and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection con-
sisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of the inspection, no items of noncompliance were iden-
ti fied.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified
in paragraph 2 of the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Docement
Room.
If the report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
l
this office, within 20 days of the date of this letter, requesting that
l
such information be withheld from public disclosure.
The application
i
must include a full statement of the reasolis why it is claimed that the
information is proprietary.
The application should be prepared so that
7812210178
h
_.
_ _ _ - _ _ _ _ _ _ _
,,
t
.
Texas Utilities Generating
.
Company
-2-
November 13, 1978
any proprietary information identified is contained in an enclosure to
E"
the application, since the appiication without the enclosure will also
be placed in the Public Document Room.
If we do not heat from you in
,
this regard within the specified period, the report will be placed in
the Public Document Room.
,
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
/c
Odc ~
.
W.C. Set /le, Chief
Reactor Construction and
Engineering Support Branch
'
Enclosure:
IE Inspection Report No. 50-445/78-19
-
50-446/78-19
cc: w/ enclosure
Texas Utilities Generating Company
ATTN: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas
75201